Inflection Point Engineering IPE-TM-300 Vessels

Review of Tray and Packing Vendor Drawings

IPE-TM-300-06

1. Purpose

This procedure outlines the features to consider when reviewing drawings (Foreign Prints) from tray and packing vendors.

2. General

Many elements of design affect the capacity, efficiency and durability of liquid/vapor and liquid/liquid contacting devices. Inflection Point Engineering attempts to control these elements with Project Specification 307, Standard Specification 3-18, and Standard Drawings.

In order to meet performance guarantees and provide our customers with the best possible processing units, Project Specification 111 specifies that the supplier of contacting devices shall submit construction drawings to Inflection Point Engineering for a thorough review. This review involves the following tasks:

3. Guidelines

3.1 Process Review Items for Trays

* If downcomer area, bubbling area, or orifice area is more than 2% different than what was specified, make a rating of the tray design using the “Inflection Point Engineering Tray Design” application.

3.2 Mechanical Review Items for Trays

3.3 Review Items for Liquid Distributors to Packing

Poor liquid distribution is the most common cause of poor separation in packed columns. If the initial distribution is worse than the natural distribution, it will take a substantial bed depth to achieve natural distribution, which will significantly affect the packing efficiency.

Review the following items: