Reference Tables
PHA / risk assessment methods — HAZOP, what-if, FMEA, LOPA, bowtie — comparison and selection guidance.
PHA Method Comparison Matrix
| Method | Best for | Typical life-cycle phase | Team size | Effort (person-wk) | Qualitative/Quant | Deliverable | Key standard |
|---|---|---|---|---|---|---|---|
| Checklist | Well-understood process replication; small MOC | Detailed design, pre-startup, MOC | 1-2 | 0.1-0.5 | Qualitative | Completed checklist | OSHA 3132; CCPS Ch.4 |
| What-If | Early concept, bench/pilot, simple units | Conceptual, FEL-1 | 2-4 | 0.5-2 | Qualitative | What-if/consequence/safeguards table | CCPS Ch.6 |
| HAZOP | Continuous flow process, complex units w/ P&IDs | FEL-3 design freeze, 5-yr revalidation | 5-8 | 3-12 | Qualitative | Node deviations w/ C/C/S/R and recs | IEC 61882; CCPS Ch.7 |
| LOPA | Risk-ranking selected HAZOP scenarios; SIL target | Post-HAZOP, pre-SIS design | 2-4 (with HAZOP results) | 1-3 | Semi-quantitative | LOPA worksheet w/ IEF, IPL, PFD, residual freq | CCPS LOPA 2001; IEC 61511-3 |
| FMEA / FMECA | Rotating & electrical equipment reliability | Reliability, spares, RCM | 3-5 | 2-6 | Qualitative or Semi-quant | FMEA sheet w/ RPN or criticality | IEC 60812; MIL-STD-1629A |
| Bowtie | Major-accident hazards; communication | Risk register, LFL presentation | 4-6 | 1-3 | Qualitative | Central event + threats + consequences + barriers | CCPS Bow Ties 2018 |
| Fault Tree (FTA) | Quantification of IEF or PFD; shared-cause | SIL verification, major-accident QRA | 2-3 | 2-8 | Quantitative | Top event probability with cutsets | IEC 61025 |
| Event Tree (ETA) | Accident progression; QRA consequence tree | Facility siting, emergency planning QRA | 2-3 | 1-4 | Quantitative | Probability-weighted outcome tree | IEC 60300-3-9 |
| Preliminary Hazard Analysis (PrHA) | Early FEL-1 hazard identification | Conceptual / FEL-1 | 3-5 | 0.5-2 | Qualitative | PHL + ranking | CCPS Ch.2; MIL-STD-882E |
| Facility Siting Study | Occupied-building vulnerability from blast/fire | Site layout; FEL-2 | 3-5 | 2-6 | Semi-quant | Consequence-based siting matrix | API RP 752 (2019) |
Typical LOPA Independent Protection Layer (IPL) PFD Credits
| IPL / Safeguard | Typical PFD | Credit (orders of mag) | Notes / Source |
|---|---|---|---|
| BPCS control loop (as safeguard) | 1E-1 | 1 | CCPS LOPA 2001 Table 6.5; one BPCS credit per scenario. |
| Operator response 10+ min with alarm | 1E-1 | 1 | CCPS LOPA 2001 Ch.6; independent indication required. |
| Operator response <10 min | 1 | 0 | No credit per CCPS 2001; use only w/ careful HF analysis. |
| Relief valve (well maintained) | 1E-2 | 2 | CCPS LOPA 2001; validated by API 510 inspection. |
| Rupture disc (properly selected) | 1E-2 | 2 | CCPS LOPA; install on clean service. |
| Blast-resistant control room / barricade | 1E-2 | 2 | API 752; facility-siting IPL. |
| Dike / containment (leak+accumulation) | 1E-2 | 2 | For liquid release consequences. |
| SIS SIL-1 function | 1E-1 to 1E-2 | 1-2 | IEC 61511 target range for SIL-1. |
| SIS SIL-2 function | 1E-2 to 1E-3 | 2-3 | IEC 61511; PFD demand mode. |
| SIS SIL-3 function | 1E-3 to 1E-4 | 3-4 | IEC 61511; rare for refinery; fuel-gas burners, H2 crossover. |
| SIS SIL-4 function | 1E-4 to 1E-5 | 4-5 | Rare in process; usually nuclear / aviation. |
| Fire & Gas detection + shutdown (certified) | 1E-1 | 1 | Credit only if independent from BPCS & SIS. |
| Passive fire protection (PFP, 2h) | 1E-2 | 2 | UL 1709 rated; maintenance-dependent. |
| Deluge / water spray | 1E-1 | 1 | NFPA 15; consumption-rate sensitive. |
Source: Process_Safety_PHA_Methods_Reference_v1.xlsx
© 2026 Inflection Point Engineering, LLC. All rights reserved. The content of this page — including calculation methods, reference data, written analysis, interactive tools, and source code — is the intellectual property of Inflection Point Engineering, LLC and is protected under applicable copyright, trademark, and trade secret laws. Unauthorized reproduction, redistribution, modification, or derivative use in whole or in part is prohibited without prior written consent.
Disclaimer. This material is provided for informational and educational purposes only and does not constitute professional engineering advice. Calculations, reference data, and methodologies are based on published standards and accepted engineering practice but are not a substitute for engineering judgment, site-specific analysis, or review by a licensed Professional Engineer. Inflection Point Engineering, LLC makes no warranties, express or implied, regarding the accuracy, completeness, or fitness for a particular purpose of any content presented here, and shall not be liable for any direct, indirect, incidental, or consequential damages arising from its use. Users assume all risk associated with applying this content to real-world design, operations, or decisions.
© 2026 Inflection Point Engineering, LLC. All rights reserved.