Section 15 — Inspection
IPE Engineering Practice IPE-EP-15-1-2
Document number: IPE-EP-15-1-2 · Section: 15 — Inspection
1.0
1.1
1.2
1.3
1.4
2.0
3.0
3.1
3.2
3.3
3.4
3.5
3.6
3.7
This document describes the elements of a program necessary for IPE Plants to assure adequate quality assurance of purchased critical equipment.
Unless otherwise determined by the Owner’s Engineer, the manufacture of instrumentation and electrical equipment are not included in the scope of this document.
Any deviation to this Practice must be approved by the procedures described in EP 1–1–3.
An asterisk (*) indicates that a decision or approval by the Owner or the Owner’s Engineer is required, or that additional information is furnished by the Purchaser.
The latest editions of the following standards and publications are referred to herein.
| IPE Engineering Practices |
|---|
| EP 1–1–3 Deviations to IPE Engineering Practices EP 15–1–4 Positive Materials Identification (PMI) EP 15–1–6 Procedures for the Use of Inspection Checklists |
| Federal Register |
| OSHA 29CFR 1910.119 Process Safety Management of Highly Hazardous Materials |
Critical Equipment - Pressure vessels, process piping, utility piping, heat exchangers, process heaters, boilers, compressors, pumps, tanks, non–commodity valves other than instrumented control, structures, and foundations selected by the Owner’s Engineer.
Inspection Authority - An individual appointed or approved by the Owner who is responsible for the Owner’s quality assurance program and has the knowledge and training to resolve issues relating to inspection and quality.
Manufacturer - The recipient of a direct or indirect purchase order for materials and/or equipment. In this context, a direct order is one issued to a manufacturer by a contractor or the Owner. An indirect order is one issued to a manufacturer by a vendor (recipient of a direct order) for materials, fabricated components, or subassemblies.
Owner - Inflection Point Engineering, LLC .
Owner’s Engineer - A Inflection Point Engineering, LLC appointed engineer.
Purchase Order - The contractual document given to the Manufacturer to authorize a purchase.
Quality Assurance - All those planned and systematic actions necessary to ensure quality, i.e. to provide adequate confidence that a product or service will be fit to meet all requirements.
3.8
3.9
3.10
3.11
4.0
4.1
4.2
4.3
5.0
5.1
5.1.1
5.1.2
5.1.3
5.2
5.2.1
5.2.2
5.2.3
5.2.4
5.3
Quality Conformance – Conformance to specified quality requirements.
Quality Control - Performance of thorough inspections which measure the effectiveness of the Quality Assurance program.
Quality Program - Documented policies and procedures which establish the means by which quality is to be attained.
Shop Inspector - An engineer or inspector appointed by IPE to carry out shop inspection of plant equipment.
All critical equipment purchased by IPE Company or its representatives shall be manufactured in accordance with the requirements of IPE Engineering Practices and any other requirements of the Purchase Order. In order to assure these requirements are met, the manufacturer’s operations shall be subject to the Owner’s Quality Assurance Program.
With the approval of the Owner’s Engineer, other Quality Assurance programs may be substituted for the one described here; however, the program utilized shall contain at least the same level of control and documentation as described in this practice.
The documentation used to assure compliance with the program provides evidence necessary to demonstrate the Owner has complied with elements of mechanical integrity contained in OSHA 29 CFR 1910.119.
The Owner’s Engineer shall:
(*)Provide information in all bid and purchase order drawings and documents to adequately describe the design and manufacturing requirements necessary to properly produce equipment which will fulfill its intended use safely and reliably.
(*)Determine the amount and intensity of inspection to assure that the manufacturer has met the necessary requirements of the Purchase Order.
(*)Have the ultimate responsibility to review and resolve any problems associated with the equipment manufacture.
The Inspection Authority shall:
Consult with and assist the Owner’s Engineer in areas relating to shop inspection.
Appoint shop inspectors to follow manufacture of equipment in the manufacturer’s facility.
Coordinate and monitor shop inspectors and report to the Owner’s Engineer all relevant inspection activities.
Notify the Owner’s Engineer of any problems identified by the Shop Inspector that may require his attention.
The Shop Inspector shall:
Material Management.
11.2 If the Manufacturer is a vendor which the owner uses on a routine basis, the Inspection Authority may instruct the Shop Inspector not to perform a Shop Evaluation less frequently than for every order, such as once a year, unless the vendor’s performance is in question.
| FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | |||||
|---|---|---|---|---|---|---|---|---|
| PLANT INFORMATION | PLANT INFORMATION | PLANT INFORMATION | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | MANUFACTURER'S INFORMATION |
| PLANT LOC.: | PLANT LOC.: | PLANT LOC.: | INSP. NAME: | INSP. NAME: | INSP. NAME: | INSP. NAME: | INSP. NAME: | MFGR. NAME: |
| PROJECT: | PROJECT: | PROJECT: | INSP. COMPANY: | INSP. COMPANY: | INSP. COMPANY: | INSP. COMPANY: | INSP. COMPANY: | ADDRESS: |
| PROJ. ENG.: | PROJ. ENG.: | PROJ. ENG.: | INSP. P.O.: | INSP. P.O.: | INSP. P.O.: | INSP. P.O.: | INSP. P.O.: | EQUIP. DESCR.: |
| INSP. AUTH.: | INSP. AUTH.: | INSP. AUTH.: | INSP. SIGNATURE: | INSP. SIGNATURE: | INSP. SIGNATURE: | INSP. SIGNATURE: | INSP. SIGNATURE: | TAG NO.: |
| P.O. NO.: | P.O. NO.: | P.O. NO.: | DATE: | DATE: | DATE: | DATE: | DATE: | ITEM NO.: |
| PRIME SUBCONTRACTOR | ||||||||
| LOCATION: | LOCATION: | LOCATION: | CONTACT: | CONTACT: | CONTACT: | CONTACT: | CONTACT: | PHONE NO. |
| MATERIAL DESCRIPTION: | MATERIAL DESCRIPTION: | MATERIAL DESCRIPTION: | ITEM NO(S): | ITEM NO(S): | ITEM NO(S): | ITEM NO(S): | ITEM NO(S): | ITEM NO(S): |
| PURPOSE OF VISIT: PREFAB MTG. DOCUMENT REVIEW REVIEW ITEMS WITNESS POINT HOLD POINT FINAL INSPECTION OTHER |
PURPOSE OF VISIT: PREFAB MTG. DOCUMENT REVIEW REVIEW ITEMS WITNESS POINT HOLD POINT FINAL INSPECTION OTHER |
PURPOSE OF VISIT: PREFAB MTG. DOCUMENT REVIEW REVIEW ITEMS WITNESS POINT HOLD POINT FINAL INSPECTION OTHER |
PURPOSE OF VISIT: PREFAB MTG. DOCUMENT REVIEW REVIEW ITEMS WITNESS POINT HOLD POINT FINAL INSPECTION OTHER |
PURPOSE OF VISIT: PREFAB MTG. DOCUMENT REVIEW REVIEW ITEMS WITNESS POINT HOLD POINT FINAL INSPECTION OTHER |
PURPOSE OF VISIT: PREFAB MTG. DOCUMENT REVIEW REVIEW ITEMS WITNESS POINT HOLD POINT FINAL INSPECTION OTHER |
PURPOSE OF VISIT: PREFAB MTG. DOCUMENT REVIEW REVIEW ITEMS WITNESS POINT HOLD POINT FINAL INSPECTION OTHER |
PURPOSE OF VISIT: PREFAB MTG. DOCUMENT REVIEW REVIEW ITEMS WITNESS POINT HOLD POINT FINAL INSPECTION OTHER |
PURPOSE OF VISIT: PREFAB MTG. DOCUMENT REVIEW REVIEW ITEMS WITNESS POINT HOLD POINT FINAL INSPECTION OTHER |
| FREQUENCY LEVEL: | FREQUENCY LEVEL: | INSPECTION LEVEL:: | INSPECTION LEVEL:: | INSPECTION LEVEL:: | INSPECTION LEVEL:: | INSPECTION LEVEL:: | DATE: | DATE: |
| INSPECTION ITEMS PERFORMED: (CHECK ALL APPLICABLE) | INSPECTION ITEMS PERFORMED: (CHECK ALL APPLICABLE) | INSPECTION ITEMS PERFORMED: (CHECK ALL APPLICABLE) | INSPECTION ITEMS PERFORMED: (CHECK ALL APPLICABLE) | INSPECTION ITEMS PERFORMED: (CHECK ALL APPLICABLE) | INSPECTION ITEMS PERFORMED: (CHECK ALL APPLICABLE) | INSPECTION ITEMS PERFORMED: (CHECK ALL APPLICABLE) | INSPECTION ITEMS PERFORMED: (CHECK ALL APPLICABLE) | INSPECTION ITEMS PERFORMED: (CHECK ALL APPLICABLE) |
| PREFABRICATION REVIEW | PREFABRICATION REVIEW | PREFABRICATION REVIEW | PREFABRICATION REVIEW | DOCUMENTATION REVIEW | DOCUMENTATION REVIEW | DOCUMENTATION REVIEW | ||
| RECEIVING INSPECTION | RECEIVING INSPECTION | RECEIVING INSPECTION | RECEIVING INSPECTION | WITNESS/REVIEW NDE | WITNESS/REVIEW NDE | WITNESS/REVIEW NDE | ||
| POSITIVE MATERIAL IDENTIFICATION | POSITIVE MATERIAL IDENTIFICATION | POSITIVE MATERIAL IDENTIFICATION | POSITIVE MATERIAL IDENTIFICATION | VERIFY MATERIAL PREPARATION | VERIFY MATERIAL PREPARATION | VERIFY MATERIAL PREPARATION | ||
| WITNESS PQR TESTING | WITNESS PQR TESTING | WITNESS PQR TESTING | WITNESS PQR TESTING | VERIFY FIT-UPS | VERIFY FIT-UPS | VERIFY FIT-UPS | ||
| WITNESS WELDER QUALIFICATION | WITNESS WELDER QUALIFICATION | WITNESS WELDER QUALIFICATION | WITNESS WELDER QUALIFICATION | WITNESS ASSEMBLY | WITNESS ASSEMBLY | WITNESS ASSEMBLY | ||
| VERIFY DIMENSIONS | VERIFY DIMENSIONS | VERIFY DIMENSIONS | VERIFY DIMENSIONS | WITNESS TUBE ROLLING | WITNESS TUBE ROLLING | WITNESS TUBE ROLLING | ||
| VERIFY MACHINING/DRILLING | VERIFY MACHINING/DRILLING | VERIFY MACHINING/DRILLING | VERIFY MACHINING/DRILLING | WITNESS BALANCING/RUN-OUTS | WITNESS BALANCING/RUN-OUTS | WITNESS BALANCING/RUN-OUTS | ||
| HYDROSTATIC/PRESSURE TEST | HYDROSTATIC/PRESSURE TEST | HYDROSTATIC/PRESSURE TEST | HYDROSTATIC/PRESSURE TEST | WITNESS FUNCTIONAL/OPERATIONAL TEST | WITNESS FUNCTIONAL/OPERATIONAL TEST | WITNESS FUNCTIONAL/OPERATIONAL TEST | ||
| VERIFY PAINTING/COATING/LINING | VERIFY PAINTING/COATING/LINING | VERIFY PAINTING/COATING/LINING | VERIFY PAINTING/COATING/LINING | WITNESS PERFORMANCE TEST | WITNESS PERFORMANCE TEST | WITNESS PERFORMANCE TEST | ||
| VISUAL INSPECTION | VISUAL INSPECTION | VISUAL INSPECTION | VISUAL INSPECTION | WITNESS MECHANICAL RUN | WITNESS MECHANICAL RUN | WITNESS MECHANICAL RUN | ||
| VERIFY TAGGING/MARKING | VERIFY TAGGING/MARKING | VERIFY TAGGING/MARKING | VERIFY TAGGING/MARKING | VERIFY CRATING/PACKAGING | VERIFY CRATING/PACKAGING | VERIFY CRATING/PACKAGING | ||
| OTHER | OTHER | OTHER | OTHER | |||||
| ACTION REQUIRED BY IPE/PROJECT ACTION REQUIRED BY MANUFACTURER (CHECK ONE IF ACTION REQUIRED) | ACTION REQUIRED BY IPE/PROJECT ACTION REQUIRED BY MANUFACTURER (CHECK ONE IF ACTION REQUIRED) | ACTION REQUIRED BY IPE/PROJECT ACTION REQUIRED BY MANUFACTURER (CHECK ONE IF ACTION REQUIRED) | ACTION REQUIRED BY IPE/PROJECT ACTION REQUIRED BY MANUFACTURER (CHECK ONE IF ACTION REQUIRED) | ACTION REQUIRED BY IPE/PROJECT ACTION REQUIRED BY MANUFACTURER (CHECK ONE IF ACTION REQUIRED) | ACTION REQUIRED BY IPE/PROJECT ACTION REQUIRED BY MANUFACTURER (CHECK ONE IF ACTION REQUIRED) | ACTION REQUIRED BY IPE/PROJECT ACTION REQUIRED BY MANUFACTURER (CHECK ONE IF ACTION REQUIRED) | ACTION REQUIRED BY IPE/PROJECT ACTION REQUIRED BY MANUFACTURER (CHECK ONE IF ACTION REQUIRED) | ACTION REQUIRED BY IPE/PROJECT ACTION REQUIRED BY MANUFACTURER (CHECK ONE IF ACTION REQUIRED) |
| ACTION REQUIRED: | ACTION REQUIRED: | ACTION REQUIRED: | ACTION REQUIRED: | ACTION REQUIRED: | ACTION REQUIRED: | ACTION REQUIRED: | ACTION REQUIRED: | ACTION REQUIRED: |
| RESULTS OF VISIT: ACCEPTABLE CONDITIONAL UNACCEPTABLE | RESULTS OF VISIT: ACCEPTABLE CONDITIONAL UNACCEPTABLE | RESULTS OF VISIT: ACCEPTABLE CONDITIONAL UNACCEPTABLE | RESULTS OF VISIT: ACCEPTABLE CONDITIONAL UNACCEPTABLE | RESULTS OF VISIT: ACCEPTABLE CONDITIONAL UNACCEPTABLE | RESULTS OF VISIT: ACCEPTABLE CONDITIONAL UNACCEPTABLE | RESULTS OF VISIT: ACCEPTABLE CONDITIONAL UNACCEPTABLE | RESULTS OF VISIT: ACCEPTABLE CONDITIONAL UNACCEPTABLE | RESULTS OF VISIT: ACCEPTABLE CONDITIONAL UNACCEPTABLE |
| COMMENTS: | COMMENTS: | COMMENTS: | COMMENTS: | COMMENTS: | COMMENTS: | COMMENTS: | COMMENTS: | COMMENTS: |
| DEFICIENCIES AND/OR NONCOMFORMANCES OUTSTANDING YES NO | DEFICIENCIES AND/OR NONCOMFORMANCES OUTSTANDING YES NO | DEFICIENCIES AND/OR NONCOMFORMANCES OUTSTANDING YES NO | DEFICIENCIES AND/OR NONCOMFORMANCES OUTSTANDING YES NO | DEFICIENCIES AND/OR NONCOMFORMANCES OUTSTANDING YES NO | DEFICIENCIES AND/OR NONCOMFORMANCES OUTSTANDING YES NO | DEFICIENCIES AND/OR NONCOMFORMANCES OUTSTANDING YES NO | DEFICIENCIES AND/OR NONCOMFORMANCES OUTSTANDING YES NO | DEFICIENCIES AND/OR NONCOMFORMANCES OUTSTANDING YES NO |
| ATTACHED TO THIS REPORT: FINAL RELEASE DEFICIENCY NONCONFORMANCE QC DOCUMENTATION CLOSE OUT EVALUATION REQUEST FOR DEVIATION ALERT NOTICE OTHER |
ATTACHED TO THIS REPORT: FINAL RELEASE DEFICIENCY NONCONFORMANCE QC DOCUMENTATION CLOSE OUT EVALUATION REQUEST FOR DEVIATION ALERT NOTICE OTHER |
ATTACHED TO THIS REPORT: FINAL RELEASE DEFICIENCY NONCONFORMANCE QC DOCUMENTATION CLOSE OUT EVALUATION REQUEST FOR DEVIATION ALERT NOTICE OTHER |
ATTACHED TO THIS REPORT: FINAL RELEASE DEFICIENCY NONCONFORMANCE QC DOCUMENTATION CLOSE OUT EVALUATION REQUEST FOR DEVIATION ALERT NOTICE OTHER |
ATTACHED TO THIS REPORT: FINAL RELEASE DEFICIENCY NONCONFORMANCE QC DOCUMENTATION CLOSE OUT EVALUATION REQUEST FOR DEVIATION ALERT NOTICE OTHER |
ATTACHED TO THIS REPORT: FINAL RELEASE DEFICIENCY NONCONFORMANCE QC DOCUMENTATION CLOSE OUT EVALUATION REQUEST FOR DEVIATION ALERT NOTICE OTHER |
ATTACHED TO THIS REPORT: FINAL RELEASE DEFICIENCY NONCONFORMANCE QC DOCUMENTATION CLOSE OUT EVALUATION REQUEST FOR DEVIATION ALERT NOTICE OTHER |
ATTACHED TO THIS REPORT: FINAL RELEASE DEFICIENCY NONCONFORMANCE QC DOCUMENTATION CLOSE OUT EVALUATION REQUEST FOR DEVIATION ALERT NOTICE OTHER |
ATTACHED TO THIS REPORT: FINAL RELEASE DEFICIENCY NONCONFORMANCE QC DOCUMENTATION CLOSE OUT EVALUATION REQUEST FOR DEVIATION ALERT NOTICE OTHER |
| THIS IS THE FINAL REPORT: YES NO | THIS IS THE FINAL REPORT: YES NO | THIS IS THE FINAL REPORT: YES NO | THIS IS THE FINAL REPORT: YES NO | THIS IS THE FINAL REPORT: YES NO | THIS IS THE FINAL REPORT: YES NO | THIS IS THE FINAL REPORT: YES NO | THIS IS THE FINAL REPORT: YES NO | THIS IS THE FINAL REPORT: YES NO |
| COMMENTS: | COMMENTS: | COMMENTS: | COMMENTS: | COMMENTS: | COMMENTS: | COMMENTS: | COMMENTS: | COMMENTS: |
| RADIOGRAPHIC REPORT | RADIOGRAPHIC REPORT | RADIOGRAPHIC REPORT | RADIOGRAPHIC REPORT | RADIOGRAPHIC REPORT | ||||||
|---|---|---|---|---|---|---|---|---|---|---|
| PLANT INFORMATION | PLANT INFORMATION | PLANT INFORMATION | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | MANUFACTURER'S INFORMATION | MANUFACTURER'S INFORMATION | MANUFACTURER'S INFORMATION |
| PLANT LOC.: | PLANT LOC.: | PLANT LOC.: | INSP. NAME: | INSP. NAME: | INSP. NAME: | INSP. NAME: | INSP. NAME: | MFGR. NAME: | MFGR. NAME: | MFGR. NAME: |
| PROJECT: | PROJECT: | PROJECT: | INSP. COMPANY: | INSP. COMPANY: | INSP. COMPANY: | INSP. COMPANY: | INSP. COMPANY: | ADDRESS: | ADDRESS: | ADDRESS: |
| PROJ. ENG.: | PROJ. ENG.: | PROJ. ENG.: | INSP. P.O.: | INSP. P.O.: | INSP. P.O.: | INSP. P.O.: | INSP. P.O.: | EQUIP. DESCR.: | EQUIP. DESCR.: | EQUIP. DESCR.: |
| INSP. AUTH.: | INSP. AUTH.: | INSP. AUTH.: | INSP. SIGNATURE: | INSP. SIGNATURE: | INSP. SIGNATURE: | INSP. SIGNATURE: | INSP. SIGNATURE: | TAG NO.: | TAG NO.: | TAG NO.: |
| P.O. NO.: | P.O. NO.: | P.O. NO.: | DATE: | DATE: | DATE: | DATE: | DATE: | ITEM NO.: | ITEM NO.: | ITEM NO.: |
| PRIME SUBCONTRACTOR | PRIME SUBCONTRACTOR | PRIME SUBCONTRACTOR | ||||||||
| NOZZLE, SEAM NO OR PART NO.. | WELD/SPOOL NO. OR CASTING NO./PATTERN | LOCATION FILM | LOCATION FILM | DEFECT TYPE | DEFECT TYPE | ACCEPT | REJECT | REJECT | DENSITY | REMARKS |
S=SLAG P=POROSITY LF=LACK OF FUSION EP=EXCESSIVE PENETRATION I=INCLUSION C=CRACK HR=HOLLOW ROOT ILP=INLINE POROSITY IP= INCOMPLETE PENETRATION UC=UNDERCUT SHR=SHRINKAGE CHP=CHAPLET HT=HOT TEAR DR=DROSS S=SAND CS=CORE SHIFT
| PIPE SPOOL INSPECTION REPORT | PIPE SPOOL INSPECTION REPORT | ||
|---|---|---|---|
| PLANT INFORMATION | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | MANUFACTURER'S INFORMATION |
| PLANT LOC.: | INSP. NAME: | INSP. NAME: | MFGR. NAME: |
| PROJECT: | INSP. COMPANY: | INSP. COMPANY: | ADDRESS: |
| PROJ. ENG.: | INSP. P.O.: | INSP. P.O.: | EQUIP. DESCR.: |
| INSP. AUTH.: | INSP. SIGNATURE: | INSP. SIGNATURE: | TAG NO.: |
| P.O. NO.: | DATE: | DATE: | ITEM NO.: |
| PRIME SUBCONTRACTOR |
| ISO LINE NUMBER | SPOOL SHEET NUMBER | SPOOL SHEET REV.NO. | PIPE SIZE(S) | MATERIAL ASTM | PIPING CLASS | HEAT TREAT DATE | HARDNES S RESULTS | REVIEW RT. FILM DATE | HYDRO TEST PRESS | DIM. CHECKS | PAINTING/ MARKING | DOC. PACKAGE REVIEW | SPOOL RELEASE DATE |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| DEFICIENCY NOTICE | DEFICIENCY NOTICE | DEFICIENCY NOTICE | DEFICIENCY NOTICE | DEFICIENCY NOTICE | DEFICIENCY NOTICE | DEFICIENCY NOTICE | DEFICIENCY NOTICE | DEFICIENCY NOTICE | DEFICIENCY NOTICE | DEFICIENCY NOTICE | DEFICIENCY NOTICE | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| PLANT INFORMATION | PLANT INFORMATION | PLANT INFORMATION | PLANT INFORMATION | PLANT INFORMATION | PLANT INFORMATION | PLANT INFORMATION | PLANT INFORMATION | PLANT INFORMATION | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | MANUFACTURER'S INFORMATION | MANUFACTURER'S INFORMATION | MANUFACTURER'S INFORMATION | MANUFACTURER'S INFORMATION | MANUFACTURER'S INFORMATION | MANUFACTURER'S INFORMATION |
| PLANT LOC.: | PLANT LOC.: | PLANT LOC.: | PLANT LOC.: | PLANT LOC.: | PLANT LOC.: | PLANT LOC.: | PLANT LOC.: | PLANT LOC.: | INSP. NAME: | INSP. NAME: | INSP. NAME: | INSP. NAME: | INSP. NAME: | INSP. NAME: | INSP. NAME: | INSP. NAME: | MFGR. NAME: | MFGR. NAME: | MFGR. NAME: | MFGR. NAME: | MFGR. NAME: | MFGR. NAME: |
| PROJECT: | PROJECT: | PROJECT: | PROJECT: | PROJECT: | PROJECT: | PROJECT: | PROJECT: | PROJECT: | INSP. COMPANY: | INSP. COMPANY: | INSP. COMPANY: | INSP. COMPANY: | INSP. COMPANY: | INSP. COMPANY: | INSP. COMPANY: | INSP. COMPANY: | ADDRESS: | ADDRESS: | ADDRESS: | ADDRESS: | ADDRESS: | ADDRESS: |
| PROJ. ENG.: | PROJ. ENG.: | PROJ. ENG.: | PROJ. ENG.: | PROJ. ENG.: | PROJ. ENG.: | PROJ. ENG.: | PROJ. ENG.: | PROJ. ENG.: | INSP. P.O.: | INSP. P.O.: | INSP. P.O.: | INSP. P.O.: | INSP. P.O.: | INSP. P.O.: | INSP. P.O.: | INSP. P.O.: | EQUIP. DESCR.: | EQUIP. DESCR.: | EQUIP. DESCR.: | EQUIP. DESCR.: | EQUIP. DESCR.: | EQUIP. DESCR.: |
| INSP. AUTH.: | INSP. AUTH.: | INSP. AUTH.: | INSP. AUTH.: | INSP. AUTH.: | INSP. AUTH.: | INSP. AUTH.: | INSP. AUTH.: | INSP. AUTH.: | INSP. SIGNATURE: | INSP. SIGNATURE: | INSP. SIGNATURE: | INSP. SIGNATURE: | INSP. SIGNATURE: | INSP. SIGNATURE: | INSP. SIGNATURE: | INSP. SIGNATURE: | TAG NO.: | TAG NO.: | TAG NO.: | TAG NO.: | TAG NO.: | TAG NO.: |
| P.O. NO.: | P.O. NO.: | P.O. NO.: | P.O. NO.: | P.O. NO.: | P.O. NO.: | P.O. NO.: | P.O. NO.: | P.O. NO.: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | ITEM NO.: | ITEM NO.: | ITEM NO.: | ITEM NO.: | ITEM NO.: | ITEM NO.: |
| PRIME SUBCONTRACTOR | PRIME SUBCONTRACTOR | PRIME SUBCONTRACTOR | PRIME SUBCONTRACTOR | PRIME SUBCONTRACTOR | PRIME SUBCONTRACTOR | |||||||||||||||||
| DEFICIENCY NOTICE NO: | DEFICIENCY NOTICE NO: | DEFICIENCY NOTICE NO: | DEFICIENCY NOTICE NO: | DEFICIENCY NOTICE NO: | DEFICIENCY NOTICE NO: | DEFICIENCY NOTICE NO: | DEFICIENCY NOTICE NO: | DEFICIENCY NOTICE NO: | DEFICIENCY NOTICE NO: | DEFICIENCY NOTICE NO: | DEFICIENCY NOTICE NO: | DEFICIENCY NOTICE NO: | DEFICIENCY NOTICE NO: | (FIRST NOTICE FOR THIS ORDER = 01) | (FIRST NOTICE FOR THIS ORDER = 01) | (FIRST NOTICE FOR THIS ORDER = 01) | (FIRST NOTICE FOR THIS ORDER = 01) | (FIRST NOTICE FOR THIS ORDER = 01) | (FIRST NOTICE FOR THIS ORDER = 01) | (FIRST NOTICE FOR THIS ORDER = 01) | (FIRST NOTICE FOR THIS ORDER = 01) | (FIRST NOTICE FOR THIS ORDER = 01) |
| DESCRIPTION OF DEFICIENCY: | DESCRIPTION OF DEFICIENCY: | DESCRIPTION OF DEFICIENCY: | DESCRIPTION OF DEFICIENCY: | DESCRIPTION OF DEFICIENCY: | DESCRIPTION OF DEFICIENCY: | DESCRIPTION OF DEFICIENCY: | DESCRIPTION OF DEFICIENCY: | DESCRIPTION OF DEFICIENCY: | DESCRIPTION OF DEFICIENCY: | DESCRIPTION OF DEFICIENCY: | DESCRIPTION OF DEFICIENCY: | DESCRIPTION OF DEFICIENCY: | DESCRIPTION OF DEFICIENCY: | DESCRIPTION OF DEFICIENCY: | DESCRIPTION OF DEFICIENCY: | DESCRIPTION OF DEFICIENCY: | DESCRIPTION OF DEFICIENCY: | DESCRIPTION OF DEFICIENCY: | DESCRIPTION OF DEFICIENCY: | DESCRIPTION OF DEFICIENCY: | DESCRIPTION OF DEFICIENCY: | DESCRIPTION OF DEFICIENCY: |
| CATEGORY: | CATEGORY: | PROCEDURAL | PROCEDURAL | PROCEDURAL | QUANTITY | QUANTITY | QUANTITY | QUANTITY | QUANTITY | NDE | NDE | NDE | TESTING | TESTING | TESTING | WELDING | WELDING | WELDING | WORKMANSHIP | WORKMANSHIP | WORKMANSHIP | DESIGN |
| DOCUMENTATION | DOCUMENTATION | DOCUMENTATION | DOCUMENTATION | MATERIAL | MATERIAL | MATERIAL | DIMENSIONAL | DIMENSIONAL | DIMENSIONAL | DIMENSIONAL | DIMENSIONAL | PACKAGING | PACKAGING | PACKAGING | PACKAGING | SPECIFICATION/DATA SHEET | SPECIFICATION/DATA SHEET | SPECIFICATION/DATA SHEET | SPECIFICATION/DATA SHEET | SPECIFICATION/DATA SHEET | NOTIFICATION | NOTIFICATION |
| OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | |
| ROOT CAUSE: | MANUFACTURER SYSTEM FAILURE |
MANUFACTURER SYSTEM FAILURE |
MANUFACTURER SYSTEM FAILURE |
MANUFACTURER SYSTEM FAILURE |
MANUFACTURER SYSTEM FAILURE |
MANUFACTURER SYSTEM FAILURE |
MANUFACTURER SYSTEM FAILURE |
MANUFACTURER SYSTEM FAILURE |
MANUFACTURER SYSTEM FAILURE |
MANUFACTURER SYSTEM FAILURE |
MANUFACTURER QC FAILURE | MANUFACTURER QC FAILURE | MANUFACTURER QC FAILURE | MANUFACTURER QC FAILURE | MANUFACTURER QC FAILURE | MANUFACTURER QC FAILURE | MANUFACTURER QC FAILURE | REQUIREMENT DEFINITION | REQUIREMENT DEFINITION | REQUIREMENT DEFINITION | REQUIREMENT DEFINITION | REQUIREMENT DEFINITION |
| AMBIGUOUS REQUIREMENT | AMBIGUOUS REQUIREMENT | AMBIGUOUS REQUIREMENT | AMBIGUOUS REQUIREMENT | AMBIGUOUS REQUIREMENT | AMBIGUOUS REQUIREMENT | AMBIGUOUS REQUIREMENT | AMBIGUOUS REQUIREMENT | AMBIGUOUS REQUIREMENT | AMBIGUOUS REQUIREMENT | AMBIGUOUS REQUIREMENT | OWNER | OWNER | OWNER | OWNER | OWNER | OWNER | OWNER | OWNER | OWNER | OWNER | OWNER | |
| OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | |
| ACTION TO BE TAKEN BY: (CHECK ONE ONLY) | ACTION TO BE TAKEN BY: (CHECK ONE ONLY) | ACTION TO BE TAKEN BY: (CHECK ONE ONLY) | ACTION TO BE TAKEN BY: (CHECK ONE ONLY) | ACTION TO BE TAKEN BY: (CHECK ONE ONLY) | ACTION TO BE TAKEN BY: (CHECK ONE ONLY) | ACTION TO BE TAKEN BY: (CHECK ONE ONLY) | ACTION TO BE TAKEN BY: (CHECK ONE ONLY) | ACTION TO BE TAKEN BY: (CHECK ONE ONLY) | ACTION TO BE TAKEN BY: (CHECK ONE ONLY) | ACTION TO BE TAKEN BY: (CHECK ONE ONLY) | ACTION TO BE TAKEN BY: (CHECK ONE ONLY) | ACTION TO BE TAKEN BY: (CHECK ONE ONLY) | ACTION TO BE TAKEN BY: (CHECK ONE ONLY) | ACTION TO BE TAKEN BY: (CHECK ONE ONLY) | ACTION TO BE TAKEN BY: (CHECK ONE ONLY) | ACTION TO BE TAKEN BY: (CHECK ONE ONLY) | ACTION TO BE TAKEN BY: (CHECK ONE ONLY) | ACTION TO BE TAKEN BY: (CHECK ONE ONLY) | ACTION TO BE TAKEN BY: (CHECK ONE ONLY) | ACTION TO BE TAKEN BY: (CHECK ONE ONLY) | ACTION TO BE TAKEN BY: (CHECK ONE ONLY) | ACTION TO BE TAKEN BY: (CHECK ONE ONLY) |
| MANUFACTURER | MANUFACTURER | MANUFACTURER | OWNER | OWNER | OWNER | OTHER | OTHER | OTHER | OTHER | OTHER | OTHER | OTHER | OTHER | OTHER | DATE CORRECTION TO BE COMPLETED: | DATE CORRECTION TO BE COMPLETED: | DATE CORRECTION TO BE COMPLETED: | DATE CORRECTION TO BE COMPLETED: | DATE CORRECTION TO BE COMPLETED: | DATE CORRECTION TO BE COMPLETED: | DATE CORRECTION TO BE COMPLETED: | DATE CORRECTION TO BE COMPLETED: |
| NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT | NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT | NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT | NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT | NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT | NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT | NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT | NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT | NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT | NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT | NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT | NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT | NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT | NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT | NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT | NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT | NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT | NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT | NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT | NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT | NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT | NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT | NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT |
| DEFICIENCY IDENTIFIED BY: | DEFICIENCY IDENTIFIED BY: | DEFICIENCY IDENTIFIED BY: | DEFICIENCY IDENTIFIED BY: | DEFICIENCY IDENTIFIED BY: | DEFICIENCY IDENTIFIED BY: | DEFICIENCY IDENTIFIED BY: | DEFICIENCY IDENTIFIED BY: | DATE: | DATE: | DATE: | DATE: | ACKNOWLEDGED BY: | ACKNOWLEDGED BY: | ACKNOWLEDGED BY: | ACKNOWLEDGED BY: | ACKNOWLEDGED BY: | ACKNOWLEDGED BY: | ACKNOWLEDGED BY: | ACKNOWLEDGED BY: | DATE: | DATE: | DATE: |
| ACTION TAKEN TO CORRECT DEFICIENCY: | ACTION TAKEN TO CORRECT DEFICIENCY: | ACTION TAKEN TO CORRECT DEFICIENCY: | ACTION TAKEN TO CORRECT DEFICIENCY: | ACTION TAKEN TO CORRECT DEFICIENCY: | ACTION TAKEN TO CORRECT DEFICIENCY: | ACTION TAKEN TO CORRECT DEFICIENCY: | ACTION TAKEN TO CORRECT DEFICIENCY: | ACTION TAKEN TO CORRECT DEFICIENCY: | ACTION TAKEN TO CORRECT DEFICIENCY: | ACTION TAKEN TO CORRECT DEFICIENCY: | ACTION TAKEN TO CORRECT DEFICIENCY: | ACTION TAKEN TO CORRECT DEFICIENCY: | ACTION TAKEN TO CORRECT DEFICIENCY: | ACTION TAKEN TO CORRECT DEFICIENCY: | ACTION TAKEN TO CORRECT DEFICIENCY: | ACTION TAKEN TO CORRECT DEFICIENCY: | ACTION TAKEN TO CORRECT DEFICIENCY: | ACTION TAKEN TO CORRECT DEFICIENCY: | ACTION TAKEN TO CORRECT DEFICIENCY: | ACTION TAKEN TO CORRECT DEFICIENCY: | ACTION TAKEN TO CORRECT DEFICIENCY: | ACTION TAKEN TO CORRECT DEFICIENCY: |
| DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO | DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO | DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO | DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO | DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO | DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO | DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO | DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO | DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO | DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO | DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO | DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO | DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO | DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO | DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO | DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO | DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO | DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO | DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO | DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO | DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO | DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO | DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO |
| NONCONFORMANCE REPORT | NONCONFORMANCE REPORT | NONCONFORMANCE REPORT | NONCONFORMANCE REPORT | NONCONFORMANCE REPORT | NONCONFORMANCE REPORT | NONCONFORMANCE REPORT | NONCONFORMANCE REPORT | NONCONFORMANCE REPORT | NONCONFORMANCE REPORT | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| PLANT INFORMATION | PLANT INFORMATION | PLANT INFORMATION | PLANT INFORMATION | PLANT INFORMATION | PLANT INFORMATION | PLANT INFORMATION | PLANT INFORMATION | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | MANUFACTURER'S INFORMATION | MANUFACTURER'S INFORMATION | MANUFACTURER'S INFORMATION | MANUFACTURER'S INFORMATION |
| PLANT LOC.: | PLANT LOC.: | PLANT LOC.: | PLANT LOC.: | PLANT LOC.: | PLANT LOC.: | PLANT LOC.: | PLANT LOC.: | INSP. NAME: | INSP. NAME: | INSP. NAME: | INSP. NAME: | INSP. NAME: | INSP. NAME: | INSP. NAME: | INSP. NAME: | INSP. NAME: | MFGR. NAME: | MFGR. NAME: | MFGR. NAME: | MFGR. NAME: |
| PROJECT: | PROJECT: | PROJECT: | PROJECT: | PROJECT: | PROJECT: | PROJECT: | PROJECT: | INSP. COMPANY: | INSP. COMPANY: | INSP. COMPANY: | INSP. COMPANY: | INSP. COMPANY: | INSP. COMPANY: | INSP. COMPANY: | INSP. COMPANY: | INSP. COMPANY: | ADDRESS: | ADDRESS: | ADDRESS: | ADDRESS: |
| PROJ. ENG.: | PROJ. ENG.: | PROJ. ENG.: | PROJ. ENG.: | PROJ. ENG.: | PROJ. ENG.: | PROJ. ENG.: | PROJ. ENG.: | INSP. P.O.: | INSP. P.O.: | INSP. P.O.: | INSP. P.O.: | INSP. P.O.: | INSP. P.O.: | INSP. P.O.: | INSP. P.O.: | INSP. P.O.: | EQUIP. DESCR.: | EQUIP. DESCR.: | EQUIP. DESCR.: | EQUIP. DESCR.: |
| INSP. AUTH.: | INSP. AUTH.: | INSP. AUTH.: | INSP. AUTH.: | INSP. AUTH.: | INSP. AUTH.: | INSP. AUTH.: | INSP. AUTH.: | INSP. SIGNATURE: | INSP. SIGNATURE: | INSP. SIGNATURE: | INSP. SIGNATURE: | INSP. SIGNATURE: | INSP. SIGNATURE: | INSP. SIGNATURE: | INSP. SIGNATURE: | INSP. SIGNATURE: | TAG NO.: | TAG NO.: | TAG NO.: | TAG NO.: |
| P.O. NO.: | P.O. NO.: | P.O. NO.: | P.O. NO.: | P.O. NO.: | P.O. NO.: | P.O. NO.: | P.O. NO.: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | ITEM NO.: | ITEM NO.: | ITEM NO.: | ITEM NO.: |
| PRIME SUBCONTRACTOR | PRIME SUBCONTRACTOR | PRIME SUBCONTRACTOR | PRIME SUBCONTRACTOR | |||||||||||||||||
| NONCONFORMANCE REPORT NO: | NONCONFORMANCE REPORT NO: | NONCONFORMANCE REPORT NO: | NONCONFORMANCE REPORT NO: | NONCONFORMANCE REPORT NO: | NONCONFORMANCE REPORT NO: | NONCONFORMANCE REPORT NO: | NONCONFORMANCE REPORT NO: | (FIRST NOTICE FOR THIS ORDER = 01) |
(FIRST NOTICE FOR THIS ORDER = 01) |
(FIRST NOTICE FOR THIS ORDER = 01) |
(FIRST NOTICE FOR THIS ORDER = 01) |
(FIRST NOTICE FOR THIS ORDER = 01) |
(FIRST NOTICE FOR THIS ORDER = 01) |
(FIRST NOTICE FOR THIS ORDER = 01) |
(FIRST NOTICE FOR THIS ORDER = 01) |
(FIRST NOTICE FOR THIS ORDER = 01) |
STATUS OPEN CLOSED | STATUS OPEN CLOSED | STATUS OPEN CLOSED | STATUS OPEN CLOSED |
| DESCRIPTION OF NONCONFORMANCE: | DESCRIPTION OF NONCONFORMANCE: | DESCRIPTION OF NONCONFORMANCE: | DESCRIPTION OF NONCONFORMANCE: | DESCRIPTION OF NONCONFORMANCE: | DESCRIPTION OF NONCONFORMANCE: | DESCRIPTION OF NONCONFORMANCE: | DESCRIPTION OF NONCONFORMANCE: | DESCRIPTION OF NONCONFORMANCE: | DESCRIPTION OF NONCONFORMANCE: | DESCRIPTION OF NONCONFORMANCE: | DESCRIPTION OF NONCONFORMANCE: | DESCRIPTION OF NONCONFORMANCE: | DESCRIPTION OF NONCONFORMANCE: | DESCRIPTION OF NONCONFORMANCE: | DESCRIPTION OF NONCONFORMANCE: | DESCRIPTION OF NONCONFORMANCE: | DESCRIPTION OF NONCONFORMANCE: | DESCRIPTION OF NONCONFORMANCE: | DESCRIPTION OF NONCONFORMANCE: | DESCRIPTION OF NONCONFORMANCE: |
| CATEGORY: | CATEGORY: | PROCEDURAL | PROCEDURAL | PROCEDURAL | PROCEDURAL | QUANTITY | QUANTITY | QUANTITY | NDE | NDE | NDE | NDE | TESTING | TESTING | WELDING | WELDING | WELDING | WORKMANSHIP | WORKMANSHIP | DESIGN |
| DOCUMENTATION | DOCUMENTATION | DOCUMENTATION | DOCUMENTATION | MATERIAL | MATERIAL | MATERIAL | DIMENSIONAL | DIMENSIONAL | DIMENSIONAL | PACKAGING | PACKAGING | PACKAGING | PACKAGING | SPECIFICATION/DATA SHEET | SPECIFICATION/DATA SHEET | SPECIFICATION/DATA SHEET | SPECIFICATION/DATA SHEET | SPECIFICATION/DATA SHEET | NOTIFICATION | NOTIFICATION |
| OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | |
| ROOT CAUSE: | MANUFACTURER SYSTEM FAILURE | MANUFACTURER SYSTEM FAILURE | MANUFACTURER SYSTEM FAILURE | MANUFACTURER SYSTEM FAILURE | MANUFACTURER SYSTEM FAILURE | MANUFACTURER SYSTEM FAILURE | MANUFACTURER SYSTEM FAILURE | MANUFACTURER QC FAILURE | MANUFACTURER QC FAILURE | MANUFACTURER QC FAILURE | MANUFACTURER QC FAILURE | MANUFACTURER QC FAILURE | MANUFACTURER QC FAILURE | MANUFACTURER QC FAILURE | MANUFACTURER QC FAILURE | MANUFACTURER QC FAILURE | REQUIREMENT DEFINITION | REQUIREMENT DEFINITION | REQUIREMENT DEFINITION | REQUIREMENT DEFINITION |
| AMBIGUOUS REQUIREMENT | AMBIGUOUS REQUIREMENT | AMBIGUOUS REQUIREMENT | AMBIGUOUS REQUIREMENT | AMBIGUOUS REQUIREMENT | AMBIGUOUS REQUIREMENT | AMBIGUOUS REQUIREMENT | AMBIGUOUS REQUIREMENT | AMBIGUOUS REQUIREMENT | CUSTOMER | CUSTOMER | CUSTOMER | CUSTOMER | CUSTOMER | CUSTOMER | CUSTOMER | CUSTOMER | CUSTOMER | CUSTOMER | CUSTOMER | |
| OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | OTHERS (SPECIFY): | |
| NCR ISSUED BY: | NCR ISSUED BY: | NCR ISSUED BY: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: |
| RECOMMENDED DISPOSTION: | RECOMMENDED DISPOSTION: | RECOMMENDED DISPOSTION: | RECOMMENDED DISPOSTION: | RECOMMENDED DISPOSTION: | RECOMMENDED DISPOSTION: | RECOMMENDED DISPOSTION: | RECOMMENDED DISPOSTION: | RECOMMENDED DISPOSTION: | RECOMMENDED DISPOSTION: | RECOMMENDED DISPOSTION: | RECOMMENDED DISPOSTION: | RECOMMENDED DISPOSTION: | RECOMMENDED DISPOSTION: | RECOMMENDED DISPOSTION: | RECOMMENDED DISPOSTION: | RECOMMENDED DISPOSTION: | RECOMMENDED DISPOSTION: | RECOMMENDED DISPOSTION: | RECOMMENDED DISPOSTION: | RECOMMENDED DISPOSTION: |
| AUTHORIZED DISPOSTION: | AUTHORIZED DISPOSTION: | AUTHORIZED DISPOSTION: | AUTHORIZED DISPOSTION: | AUTHORIZED DISPOSTION: | AUTHORIZED DISPOSTION: | AUTHORIZED DISPOSTION: | AUTHORIZED DISPOSTION: | AUTHORIZED DISPOSTION: | AUTHORIZED DISPOSTION: | AUTHORIZED DISPOSTION: | AUTHORIZED DISPOSTION: | AUTHORIZED DISPOSTION: | AUTHORIZED DISPOSTION: | AUTHORIZED DISPOSTION: | AUTHORIZED DISPOSTION: | AUTHORIZED DISPOSTION: | AUTHORIZED DISPOSTION: | AUTHORIZED DISPOSTION: | AUTHORIZED DISPOSTION: | AUTHORIZED DISPOSTION: |
| DISPOSITION AUTHORIZED BY: |
DISPOSITION AUTHORIZED BY: |
DISPOSITION AUTHORIZED BY: |
DISPOSITION AUTHORIZED BY: |
DISPOSITION AUTHORIZED BY: |
DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | INSPECTOR: | INSPECTOR: | INSPECTOR: | INSPECTOR: | INSPECTOR: | DATE: | DATE: | DATE: | DATE: | DATE: |
| PROJECT ENGINEER: | PROJECT ENGINEER: | PROJECT ENGINEER: | PROJECT ENGINEER: | PROJECT ENGINEER: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | OTHER: | OTHER: | OTHER: | OTHER: | OTHER: | DATE: | DATE: | DATE: | DATE: | DATE: |
| DESCRIPTION OF CORRECTIVE ACTION TAKEN: | DESCRIPTION OF CORRECTIVE ACTION TAKEN: | DESCRIPTION OF CORRECTIVE ACTION TAKEN: | DESCRIPTION OF CORRECTIVE ACTION TAKEN: | DESCRIPTION OF CORRECTIVE ACTION TAKEN: | DESCRIPTION OF CORRECTIVE ACTION TAKEN: | DESCRIPTION OF CORRECTIVE ACTION TAKEN: | DESCRIPTION OF CORRECTIVE ACTION TAKEN: | DESCRIPTION OF CORRECTIVE ACTION TAKEN: | DESCRIPTION OF CORRECTIVE ACTION TAKEN: | DESCRIPTION OF CORRECTIVE ACTION TAKEN: | DESCRIPTION OF CORRECTIVE ACTION TAKEN: | DESCRIPTION OF CORRECTIVE ACTION TAKEN: | DESCRIPTION OF CORRECTIVE ACTION TAKEN: | DESCRIPTION OF CORRECTIVE ACTION TAKEN: | DESCRIPTION OF CORRECTIVE ACTION TAKEN: | DESCRIPTION OF CORRECTIVE ACTION TAKEN: | DESCRIPTION OF CORRECTIVE ACTION TAKEN: | DESCRIPTION OF CORRECTIVE ACTION TAKEN: | DESCRIPTION OF CORRECTIVE ACTION TAKEN: | DESCRIPTION OF CORRECTIVE ACTION TAKEN: |
| DISPOSTION APPROVED: | DISPOSTION APPROVED: | DISPOSTION APPROVED: | DISPOSTION APPROVED: | DISPOSTION APPROVED: | DISPOSTION APPROVED: | DISPOSTION APPROVED: | DISPOSTION APPROVED: | DISPOSTION APPROVED: | DISPOSTION APPROVED: | DISPOSTION APPROVED: | DISPOSTION APPROVED: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: | DATE: |
| ASSIGNED INSPECTOR | ASSIGNED INSPECTOR | ASSIGNED INSPECTOR | ASSIGNED INSPECTOR | ASSIGNED INSPECTOR | ASSIGNED INSPECTOR | ASSIGNED INSPECTOR | ASSIGNED INSPECTOR | ASSIGNED INSPECTOR | ASSIGNED INSPECTOR | ASSIGNED INSPECTOR | ASSIGNED INSPECTOR | ASSIGNED INSPECTOR | ASSIGNED INSPECTOR | ASSIGNED INSPECTOR | ASSIGNED INSPECTOR | ASSIGNED INSPECTOR | ASSIGNED INSPECTOR | ASSIGNED INSPECTOR | ASSIGNED INSPECTOR | ASSIGNED INSPECTOR |
| REMARKS | REMARKS | REMARKS | REMARKS | REMARKS | REMARKS | REMARKS | REMARKS | REMARKS | REMARKS | REMARKS | REMARKS | REMARKS | REMARKS | REMARKS | REMARKS | REMARKS | REMARKS | REMARKS | REMARKS | REMARKS |
| FINAL INSPECTION RELEASE | FINAL INSPECTION RELEASE | FINAL INSPECTION RELEASE | FINAL INSPECTION RELEASE | ||||
|---|---|---|---|---|---|---|---|
| PLANT INFORMATION | PLANT INFORMATION | PLANT INFORMATION | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | MANUFACTURER'S INFORMATION | MANUFACTURER'S INFORMATION |
| PLANT LOC.: | PLANT LOC.: | PLANT LOC.: | INSP. NAME: | INSP. NAME: | INSP. NAME: | MFGR. NAME: | MFGR. NAME: |
| PROJECT: | PROJECT: | PROJECT: | INSP. COMPANY: | INSP. COMPANY: | INSP. COMPANY: | ADDRESS: | ADDRESS: |
| PROJ. ENG.: | PROJ. ENG.: | PROJ. ENG.: | INSP. P.O.: | INSP. P.O.: | INSP. P.O.: | EQUIP. DESCR.: | EQUIP. DESCR.: |
| INSP. AUTH.: | INSP. AUTH.: | INSP. AUTH.: | INSP. SIGNATURE: | INSP. SIGNATURE: | INSP. SIGNATURE: | TAG NO.: | TAG NO.: |
| P.O. NO.: | P.O. NO.: | P.O. NO.: | DATE: | DATE: | DATE: | ITEM NO.: | ITEM NO.: |
| PRIME SASUBCONTRACTOR | PRIME SASUBCONTRACTOR | ||||||
| THIS FINAL INSPECTION RELEASE PROVIDES DOCUMETNATION THAT THE PURCHASE ORDER REQUIREMENTS FOR VERIFICATION OF PRODUCT THE ITEMS INDICATED BELOW. | THIS FINAL INSPECTION RELEASE PROVIDES DOCUMETNATION THAT THE PURCHASE ORDER REQUIREMENTS FOR VERIFICATION OF PRODUCT THE ITEMS INDICATED BELOW. | THIS FINAL INSPECTION RELEASE PROVIDES DOCUMETNATION THAT THE PURCHASE ORDER REQUIREMENTS FOR VERIFICATION OF PRODUCT THE ITEMS INDICATED BELOW. | THIS FINAL INSPECTION RELEASE PROVIDES DOCUMETNATION THAT THE PURCHASE ORDER REQUIREMENTS FOR VERIFICATION OF PRODUCT THE ITEMS INDICATED BELOW. | THIS FINAL INSPECTION RELEASE PROVIDES DOCUMETNATION THAT THE PURCHASE ORDER REQUIREMENTS FOR VERIFICATION OF PRODUCT THE ITEMS INDICATED BELOW. | THIS FINAL INSPECTION RELEASE PROVIDES DOCUMETNATION THAT THE PURCHASE ORDER REQUIREMENTS FOR VERIFICATION OF PRODUCT THE ITEMS INDICATED BELOW. | THIS FINAL INSPECTION RELEASE PROVIDES DOCUMETNATION THAT THE PURCHASE ORDER REQUIREMENTS FOR VERIFICATION OF PRODUCT THE ITEMS INDICATED BELOW. | THIS FINAL INSPECTION RELEASE PROVIDES DOCUMETNATION THAT THE PURCHASE ORDER REQUIREMENTS FOR VERIFICATION OF PRODUCT THE ITEMS INDICATED BELOW. |
| MANUFACTURER'S CONTACT: | MANUFACTURER'S CONTACT: | MANUFACTURER'S CONTACT: | SHIPPING LOCATION: | SHIPPING LOCATION: | SHIPPING LOCATION: | SHIPPING LOCATION: | SHIPPING LOCATION: |
| PURCHASE ORDER ITEMS RELEASED | PURCHASE ORDER ITEMS RELEASED | PURCHASE ORDER ITEMS RELEASED | PURCHASE ORDER ITEMS RELEASED | PURCHASE ORDER ITEMS RELEASED | PURCHASE ORDER ITEMS RELEASED | PURCHASE ORDER ITEMS RELEASED | PURCHASE ORDER ITEMS RELEASED |
| ITEM NO. | TAG/PART NO OR DESCRIPTION | ITEM NO. | ITEM NO. | TAG/PART NO. OR DESCRIPTION | ITEM NO. | ITEM NO. | TAG/PART NO. OR DESCRIPTION |
| REMARKS: | REMARKS: | REMARKS: | REMARKS: | REMARKS: | REMARKS: | REMARKS: | REMARKS: |
| FURTHER INSPECTION VISIT INTENDED? YES NO REMARKS: | FURTHER INSPECTION VISIT INTENDED? YES NO REMARKS: | FURTHER INSPECTION VISIT INTENDED? YES NO REMARKS: | FURTHER INSPECTION VISIT INTENDED? YES NO REMARKS: | FURTHER INSPECTION VISIT INTENDED? YES NO REMARKS: | FURTHER INSPECTION VISIT INTENDED? YES NO REMARKS: | FURTHER INSPECTION VISIT INTENDED? YES NO REMARKS: | FURTHER INSPECTION VISIT INTENDED? YES NO REMARKS: |
| MAIN/SUB ORDER COMPLETE? YES NO REMARKS: | MAIN/SUB ORDER COMPLETE? YES NO REMARKS: | MAIN/SUB ORDER COMPLETE? YES NO REMARKS: | MAIN/SUB ORDER COMPLETE? YES NO REMARKS: | MAIN/SUB ORDER COMPLETE? YES NO REMARKS: | MAIN/SUB ORDER COMPLETE? YES NO REMARKS: | MAIN/SUB ORDER COMPLETE? YES NO REMARKS: | MAIN/SUB ORDER COMPLETE? YES NO REMARKS: |
| MATERIAL READY FOR SHIPMENT? YES NO REMARKS: | MATERIAL READY FOR SHIPMENT? YES NO REMARKS: | MATERIAL READY FOR SHIPMENT? YES NO REMARKS: | MATERIAL READY FOR SHIPMENT? YES NO REMARKS: | MATERIAL READY FOR SHIPMENT? YES NO REMARKS: | MATERIAL READY FOR SHIPMENT? YES NO REMARKS: | MATERIAL READY FOR SHIPMENT? YES NO REMARKS: | MATERIAL READY FOR SHIPMENT? YES NO REMARKS: |
| VARIANCE REQUEST | VARIANCE REQUEST | VARIANCE REQUEST | |||||
|---|---|---|---|---|---|---|---|
| PLANT INFORMATION | PLANT INFORMATION | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | MANUFACTURER'S INFORMATION | MANUFACTURER'S INFORMATION |
| PLANT LOC.: | PLANT LOC.: | INSP. NAME: | INSP. NAME: | INSP. NAME: | INSP. NAME: | MFGR. NAME: | MFGR. NAME: |
| PROJECT: | PROJECT: | INSP. COMPANY: | INSP. COMPANY: | INSP. COMPANY: | INSP. COMPANY: | ADDRESS: | ADDRESS: |
| PROJ. ENG.: | PROJ. ENG.: | INSP. P.O.: | INSP. P.O.: | INSP. P.O.: | INSP. P.O.: | EQUIP. DESCR.: | EQUIP. DESCR.: |
| INSP. AUTH.: | INSP. AUTH.: | INSP. SIGNATURE: | INSP. SIGNATURE: | INSP. SIGNATURE: | INSP. SIGNATURE: | TAG NO.: | TAG NO.: |
| P.O. NO.: | P.O. NO.: | DATE: | DATE: | DATE: | DATE: | ITEM NO.: | ITEM NO.: |
| PRIME SUBCONTRACTOR | PRIME SUBCONTRACTOR | ||||||
| SECTIONS 1,2, AND 3 TO BE COMPLETED BY MANUFACTURER REQUESTING VARIANCE | SECTIONS 1,2, AND 3 TO BE COMPLETED BY MANUFACTURER REQUESTING VARIANCE | SECTIONS 1,2, AND 3 TO BE COMPLETED BY MANUFACTURER REQUESTING VARIANCE | SECTIONS 1,2, AND 3 TO BE COMPLETED BY MANUFACTURER REQUESTING VARIANCE | SECTIONS 1,2, AND 3 TO BE COMPLETED BY MANUFACTURER REQUESTING VARIANCE | SECTIONS 1,2, AND 3 TO BE COMPLETED BY MANUFACTURER REQUESTING VARIANCE | SECTIONS 1,2, AND 3 TO BE COMPLETED BY MANUFACTURER REQUESTING VARIANCE | SECTIONS 1,2, AND 3 TO BE COMPLETED BY MANUFACTURER REQUESTING VARIANCE |
| SECTION 1 | SECTION 1 | SECTION 1 | SECTION 1 | SECTION 1 | SECTION 1 | SECTION 1 | SECTION 1 |
| VARIANCE NO.: (START WITH 01) |
AFFECTING DRAWING NO.: | AFFECTING DRAWING NO.: | AFFECTING DRAWING NO.: | DWG. REV. NO.: | DWG. REV. NO.: | DWG. REV. NO.: | |
| AFFECTED ENGINEERING PRACTICE NO.: | AFFECTED ENGINEERING PRACTICE NO.: | AFFECTED ENGINEERING PRACTICE NO.: | REV. NO.: | REV. NO.: | REV. NO.: | PARA. NO.: | |
| MANUFACTURER'S REPRESENTATIVE REQUESTING VARIANCE: | MANUFACTURER'S REPRESENTATIVE REQUESTING VARIANCE: | MANUFACTURER'S REPRESENTATIVE REQUESTING VARIANCE: | MANUFACTURER'S REPRESENTATIVE REQUESTING VARIANCE: | MANUFACTURER'S REPRESENTATIVE REQUESTING VARIANCE: | POSITION: | POSITION: | POSITION: |
| SECTION 2 | SECTION 2 | SECTION 2 | SECTION 2 | SECTION 2 | SECTION 2 | SECTION 2 | SECTION 2 |
| DESCRIPTION OF VARIANCE: | DESCRIPTION OF VARIANCE: | DESCRIPTION OF VARIANCE: | DESCRIPTION OF VARIANCE: | DESCRIPTION OF VARIANCE: | DESCRIPTION OF VARIANCE: | DESCRIPTION OF VARIANCE: | DESCRIPTION OF VARIANCE: |
| REASON FOR VARIANCE: | REASON FOR VARIANCE: | REASON FOR VARIANCE: | REASON FOR VARIANCE: | REASON FOR VARIANCE: | REASON FOR VARIANCE: | REASON FOR VARIANCE: | REASON FOR VARIANCE: |
| SECTION 3 | SECTION 3 | SECTION 3 | SECTION 3 | SECTION 3 | SECTION 3 | SECTION 3 | SECTION 3 |
| P.O. ITEMS AND QUANTITIES AFFECTED BY VARIANCE: | P.O. ITEMS AND QUANTITIES AFFECTED BY VARIANCE: | P.O. ITEMS AND QUANTITIES AFFECTED BY VARIANCE: | P.O. ITEMS AND QUANTITIES AFFECTED BY VARIANCE: | P.O. ITEMS AND QUANTITIES AFFECTED BY VARIANCE: | P.O. ITEMS AND QUANTITIES AFFECTED BY VARIANCE: | P.O. ITEMS AND QUANTITIES AFFECTED BY VARIANCE: | P.O. ITEMS AND QUANTITIES AFFECTED BY VARIANCE: |
| DOLLAR VALUE OF VARIANCE: NO CHANGE DEDUCT:$ OR ADD $ ORIGINAL VALUE OF P.O. $ |
DOLLAR VALUE OF VARIANCE: NO CHANGE DEDUCT:$ OR ADD $ ORIGINAL VALUE OF P.O. $ |
DOLLAR VALUE OF VARIANCE: NO CHANGE DEDUCT:$ OR ADD $ ORIGINAL VALUE OF P.O. $ |
DOLLAR VALUE OF VARIANCE: NO CHANGE DEDUCT:$ OR ADD $ ORIGINAL VALUE OF P.O. $ |
DOLLAR VALUE OF VARIANCE: NO CHANGE DEDUCT:$ OR ADD $ ORIGINAL VALUE OF P.O. $ |
DOLLAR VALUE OF VARIANCE: NO CHANGE DEDUCT:$ OR ADD $ ORIGINAL VALUE OF P.O. $ |
DOLLAR VALUE OF VARIANCE: NO CHANGE DEDUCT:$ OR ADD $ ORIGINAL VALUE OF P.O. $ |
DOLLAR VALUE OF VARIANCE: NO CHANGE DEDUCT:$ OR ADD $ ORIGINAL VALUE OF P.O. $ |
| EFFECT ON SCHEDULE: NO CHANGE; DELAY: DAYS IMPROVE DAYS; ORIGINAL SHIPPING DATE: | EFFECT ON SCHEDULE: NO CHANGE; DELAY: DAYS IMPROVE DAYS; ORIGINAL SHIPPING DATE: | EFFECT ON SCHEDULE: NO CHANGE; DELAY: DAYS IMPROVE DAYS; ORIGINAL SHIPPING DATE: | EFFECT ON SCHEDULE: NO CHANGE; DELAY: DAYS IMPROVE DAYS; ORIGINAL SHIPPING DATE: | EFFECT ON SCHEDULE: NO CHANGE; DELAY: DAYS IMPROVE DAYS; ORIGINAL SHIPPING DATE: | EFFECT ON SCHEDULE: NO CHANGE; DELAY: DAYS IMPROVE DAYS; ORIGINAL SHIPPING DATE: | EFFECT ON SCHEDULE: NO CHANGE; DELAY: DAYS IMPROVE DAYS; ORIGINAL SHIPPING DATE: | EFFECT ON SCHEDULE: NO CHANGE; DELAY: DAYS IMPROVE DAYS; ORIGINAL SHIPPING DATE: |
| THE FOLLOWING SECTIONS TO BE COMPLETED BY IPE. REPRESENTATIVES | THE FOLLOWING SECTIONS TO BE COMPLETED BY IPE. REPRESENTATIVES | THE FOLLOWING SECTIONS TO BE COMPLETED BY IPE. REPRESENTATIVES | THE FOLLOWING SECTIONS TO BE COMPLETED BY IPE. REPRESENTATIVES | THE FOLLOWING SECTIONS TO BE COMPLETED BY IPE. REPRESENTATIVES | THE FOLLOWING SECTIONS TO BE COMPLETED BY IPE. REPRESENTATIVES | THE FOLLOWING SECTIONS TO BE COMPLETED BY IPE. REPRESENTATIVES | THE FOLLOWING SECTIONS TO BE COMPLETED BY IPE. REPRESENTATIVES |
| SECTION 4 | SECTION 4 | SECTION 4 | SECTION 4 | SECTION 4 | SECTION 4 | SECTION 4 | SECTION 4 |
| TECHNICAL EVALUATION OF VARIANCE REQUEST: | TECHNICAL EVALUATION OF VARIANCE REQUEST: | TECHNICAL EVALUATION OF VARIANCE REQUEST: | TECHNICAL EVALUATION OF VARIANCE REQUEST: | TECHNICAL EVALUATION OF VARIANCE REQUEST: | TECHNICAL EVALUATION OF VARIANCE REQUEST: | TECHNICAL EVALUATION OF VARIANCE REQUEST: | TECHNICAL EVALUATION OF VARIANCE REQUEST: |
| REQUEST DOES, DOES NOT REQUIRE TECHNICAL EVALUATION POSITION: | REQUEST DOES, DOES NOT REQUIRE TECHNICAL EVALUATION POSITION: | REQUEST DOES, DOES NOT REQUIRE TECHNICAL EVALUATION POSITION: | REQUEST DOES, DOES NOT REQUIRE TECHNICAL EVALUATION POSITION: | REQUEST DOES, DOES NOT REQUIRE TECHNICAL EVALUATION POSITION: | REQUEST DOES, DOES NOT REQUIRE TECHNICAL EVALUATION POSITION: | REQUEST DOES, DOES NOT REQUIRE TECHNICAL EVALUATION POSITION: | REQUEST DOES, DOES NOT REQUIRE TECHNICAL EVALUATION POSITION: |
| (IPE ENGINEER PERFORMING EVALUATION) | (IPE ENGINEER PERFORMING EVALUATION) | (IPE ENGINEER PERFORMING EVALUATION) | (IPE ENGINEER PERFORMING EVALUATION) | (IPE ENGINEER PERFORMING EVALUATION) | (IPE ENGINEER PERFORMING EVALUATION) | (IPE ENGINEER PERFORMING EVALUATION) | (IPE ENGINEER PERFORMING EVALUATION) |
| IF TECHNICAL EVALUATION REQUIRED, IS TECHNICAL BASIS FOR VARIANCE REQUEST JUSTIFIED? YES NO | IF TECHNICAL EVALUATION REQUIRED, IS TECHNICAL BASIS FOR VARIANCE REQUEST JUSTIFIED? YES NO | IF TECHNICAL EVALUATION REQUIRED, IS TECHNICAL BASIS FOR VARIANCE REQUEST JUSTIFIED? YES NO | IF TECHNICAL EVALUATION REQUIRED, IS TECHNICAL BASIS FOR VARIANCE REQUEST JUSTIFIED? YES NO | IF TECHNICAL EVALUATION REQUIRED, IS TECHNICAL BASIS FOR VARIANCE REQUEST JUSTIFIED? YES NO | IF TECHNICAL EVALUATION REQUIRED, IS TECHNICAL BASIS FOR VARIANCE REQUEST JUSTIFIED? YES NO | IF TECHNICAL EVALUATION REQUIRED, IS TECHNICAL BASIS FOR VARIANCE REQUEST JUSTIFIED? YES NO | IF TECHNICAL EVALUATION REQUIRED, IS TECHNICAL BASIS FOR VARIANCE REQUEST JUSTIFIED? YES NO |
| REASON(S): | REASON(S): | REASON(S): | REASON(S): | REASON(S): | REASON(S): | REASON(S): | REASON(S): |
| EP DEVIATION REQUIRED? YES NO; IF YES, LIST EP REFERENCES AFFECTED: | EP DEVIATION REQUIRED? YES NO; IF YES, LIST EP REFERENCES AFFECTED: | EP DEVIATION REQUIRED? YES NO; IF YES, LIST EP REFERENCES AFFECTED: | EP DEVIATION REQUIRED? YES NO; IF YES, LIST EP REFERENCES AFFECTED: | EP DEVIATION REQUIRED? YES NO; IF YES, LIST EP REFERENCES AFFECTED: | EP DEVIATION REQUIRED? YES NO; IF YES, LIST EP REFERENCES AFFECTED: | EP DEVIATION REQUIRED? YES NO; IF YES, LIST EP REFERENCES AFFECTED: | EP DEVIATION REQUIRED? YES NO; IF YES, LIST EP REFERENCES AFFECTED: |
| SECTION 5 | SECTION 5 | SECTION 5 | SECTION 5 | SECTION 5 | SECTION 5 | SECTION 5 | SECTION 5 |
| THIS REQUEST IS: ACCEPTED DENIED OTHER: | THIS REQUEST IS: ACCEPTED DENIED OTHER: | THIS REQUEST IS: ACCEPTED DENIED OTHER: | THIS REQUEST IS: ACCEPTED DENIED OTHER: | THIS REQUEST IS: ACCEPTED DENIED OTHER: | THIS REQUEST IS: ACCEPTED DENIED OTHER: | THIS REQUEST IS: ACCEPTED DENIED OTHER: | THIS REQUEST IS: ACCEPTED DENIED OTHER: |
| EP REPRESENTATIVE AUTHORIZING DECISION: POSITION: DATE: | EP REPRESENTATIVE AUTHORIZING DECISION: POSITION: DATE: | EP REPRESENTATIVE AUTHORIZING DECISION: POSITION: DATE: | EP REPRESENTATIVE AUTHORIZING DECISION: POSITION: DATE: | EP REPRESENTATIVE AUTHORIZING DECISION: POSITION: DATE: | EP REPRESENTATIVE AUTHORIZING DECISION: POSITION: DATE: | EP REPRESENTATIVE AUTHORIZING DECISION: POSITION: DATE: | EP REPRESENTATIVE AUTHORIZING DECISION: POSITION: DATE: |
8 - MANUFACTURER CLOSE OUT EVALUATION
| MANUFACTURER CLOSE OUT EVALUATION | MANUFACTURER CLOSE OUT EVALUATION | MANUFACTURER CLOSE OUT EVALUATION | ||
|---|---|---|---|---|
| PLANT INFORMATION | PLANT INFORMATION | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | MANUFACTURER'S INFORMATION |
| PLANT LOC.: | PLANT LOC.: | INSP. NAME: | INSP. NAME: | MFGR. NAME: |
| PROJECT: | PROJECT: | INSP. COMPANY: | INSP. COMPANY: | ADDRESS: |
| PROJ. ENG.: | PROJ. ENG.: | INSP. P.O.: | INSP. P.O.: | EQUIP. DESCR.: |
| INSP. AUTH.: | INSP. AUTH.: | INSP. SIGNATURE: | INSP. SIGNATURE: | TAG NO.: |
| P.O. NO.: | P.O. NO.: | DATE: | DATE: | ITEM NO.: |
| PRIME SUBCONTRACTOR | ||||
| EACH OF THE FOLLOWING CONDITIONS IS TO BE EVALUATED AND SCORED AT THE CLOSE OF THE FIELD INSPECTION ASSIGNMENT BY THE ASSIGNED INSPECTOR WHO CLOSES THE ASSIGNMENT. IFTHE ASSIGNMENT WAS TRANSFERRED AFTER MOST OF THE INSPECTION WAS COMPLETED, THE INSPECTOR WHO CLOSES THE ASSIGNMENT MUST COMPLETE THIS EVALUATION AND SUBMIT TO THE MANAGER OF THE CONTRACTED INSPECTION ORGANIZATION WITH NOTATION STATING THE NAME OF THE INSPECTOR WHO PERFORMED THE MAJORITY OF THE INSPECTION. THE MANAGER WILL ASSURE THE ORIGINAL INSPECTOR COMPLETES A SEPARATE EVALUATION REPORT. | EACH OF THE FOLLOWING CONDITIONS IS TO BE EVALUATED AND SCORED AT THE CLOSE OF THE FIELD INSPECTION ASSIGNMENT BY THE ASSIGNED INSPECTOR WHO CLOSES THE ASSIGNMENT. IFTHE ASSIGNMENT WAS TRANSFERRED AFTER MOST OF THE INSPECTION WAS COMPLETED, THE INSPECTOR WHO CLOSES THE ASSIGNMENT MUST COMPLETE THIS EVALUATION AND SUBMIT TO THE MANAGER OF THE CONTRACTED INSPECTION ORGANIZATION WITH NOTATION STATING THE NAME OF THE INSPECTOR WHO PERFORMED THE MAJORITY OF THE INSPECTION. THE MANAGER WILL ASSURE THE ORIGINAL INSPECTOR COMPLETES A SEPARATE EVALUATION REPORT. | EACH OF THE FOLLOWING CONDITIONS IS TO BE EVALUATED AND SCORED AT THE CLOSE OF THE FIELD INSPECTION ASSIGNMENT BY THE ASSIGNED INSPECTOR WHO CLOSES THE ASSIGNMENT. IFTHE ASSIGNMENT WAS TRANSFERRED AFTER MOST OF THE INSPECTION WAS COMPLETED, THE INSPECTOR WHO CLOSES THE ASSIGNMENT MUST COMPLETE THIS EVALUATION AND SUBMIT TO THE MANAGER OF THE CONTRACTED INSPECTION ORGANIZATION WITH NOTATION STATING THE NAME OF THE INSPECTOR WHO PERFORMED THE MAJORITY OF THE INSPECTION. THE MANAGER WILL ASSURE THE ORIGINAL INSPECTOR COMPLETES A SEPARATE EVALUATION REPORT. | EACH OF THE FOLLOWING CONDITIONS IS TO BE EVALUATED AND SCORED AT THE CLOSE OF THE FIELD INSPECTION ASSIGNMENT BY THE ASSIGNED INSPECTOR WHO CLOSES THE ASSIGNMENT. IFTHE ASSIGNMENT WAS TRANSFERRED AFTER MOST OF THE INSPECTION WAS COMPLETED, THE INSPECTOR WHO CLOSES THE ASSIGNMENT MUST COMPLETE THIS EVALUATION AND SUBMIT TO THE MANAGER OF THE CONTRACTED INSPECTION ORGANIZATION WITH NOTATION STATING THE NAME OF THE INSPECTOR WHO PERFORMED THE MAJORITY OF THE INSPECTION. THE MANAGER WILL ASSURE THE ORIGINAL INSPECTOR COMPLETES A SEPARATE EVALUATION REPORT. | EACH OF THE FOLLOWING CONDITIONS IS TO BE EVALUATED AND SCORED AT THE CLOSE OF THE FIELD INSPECTION ASSIGNMENT BY THE ASSIGNED INSPECTOR WHO CLOSES THE ASSIGNMENT. IFTHE ASSIGNMENT WAS TRANSFERRED AFTER MOST OF THE INSPECTION WAS COMPLETED, THE INSPECTOR WHO CLOSES THE ASSIGNMENT MUST COMPLETE THIS EVALUATION AND SUBMIT TO THE MANAGER OF THE CONTRACTED INSPECTION ORGANIZATION WITH NOTATION STATING THE NAME OF THE INSPECTOR WHO PERFORMED THE MAJORITY OF THE INSPECTION. THE MANAGER WILL ASSURE THE ORIGINAL INSPECTOR COMPLETES A SEPARATE EVALUATION REPORT. |
| THE FOLLOWING CONIDITONS ARE SCORED FROM “1” TO “5”. A SCORE OF “1”IS THE LOWEST OR POOREST RATING AND “5" IS EXCELLENT. IF ANY CONDITION DOES NOT APPLY, ENTER A SCORE OF “0”. THIS SCORE WILL NOT COUNT AGAINST THE MANUFACTURER'S FINAL SCORE. IF A MANUFACTURER PERFOMRED AVERAGE WITH NO PROBLEMS, OR SIGNIFICANT NCR'S NOTED, OR DELAYS EXPERIENCED, THEN ENTER A SCORE OF “3". SUPPORT ANY INDIVIDUAL SCORE OF “2" OR LESS OR “4" OR MORE WITH A WRITTEN EXPLANATION. | THE FOLLOWING CONIDITONS ARE SCORED FROM “1” TO “5”. A SCORE OF “1”IS THE LOWEST OR POOREST RATING AND “5" IS EXCELLENT. IF ANY CONDITION DOES NOT APPLY, ENTER A SCORE OF “0”. THIS SCORE WILL NOT COUNT AGAINST THE MANUFACTURER'S FINAL SCORE. IF A MANUFACTURER PERFOMRED AVERAGE WITH NO PROBLEMS, OR SIGNIFICANT NCR'S NOTED, OR DELAYS EXPERIENCED, THEN ENTER A SCORE OF “3". SUPPORT ANY INDIVIDUAL SCORE OF “2" OR LESS OR “4" OR MORE WITH A WRITTEN EXPLANATION. | THE FOLLOWING CONIDITONS ARE SCORED FROM “1” TO “5”. A SCORE OF “1”IS THE LOWEST OR POOREST RATING AND “5" IS EXCELLENT. IF ANY CONDITION DOES NOT APPLY, ENTER A SCORE OF “0”. THIS SCORE WILL NOT COUNT AGAINST THE MANUFACTURER'S FINAL SCORE. IF A MANUFACTURER PERFOMRED AVERAGE WITH NO PROBLEMS, OR SIGNIFICANT NCR'S NOTED, OR DELAYS EXPERIENCED, THEN ENTER A SCORE OF “3". SUPPORT ANY INDIVIDUAL SCORE OF “2" OR LESS OR “4" OR MORE WITH A WRITTEN EXPLANATION. | THE FOLLOWING CONIDITONS ARE SCORED FROM “1” TO “5”. A SCORE OF “1”IS THE LOWEST OR POOREST RATING AND “5" IS EXCELLENT. IF ANY CONDITION DOES NOT APPLY, ENTER A SCORE OF “0”. THIS SCORE WILL NOT COUNT AGAINST THE MANUFACTURER'S FINAL SCORE. IF A MANUFACTURER PERFOMRED AVERAGE WITH NO PROBLEMS, OR SIGNIFICANT NCR'S NOTED, OR DELAYS EXPERIENCED, THEN ENTER A SCORE OF “3". SUPPORT ANY INDIVIDUAL SCORE OF “2" OR LESS OR “4" OR MORE WITH A WRITTEN EXPLANATION. | THE FOLLOWING CONIDITONS ARE SCORED FROM “1” TO “5”. A SCORE OF “1”IS THE LOWEST OR POOREST RATING AND “5" IS EXCELLENT. IF ANY CONDITION DOES NOT APPLY, ENTER A SCORE OF “0”. THIS SCORE WILL NOT COUNT AGAINST THE MANUFACTURER'S FINAL SCORE. IF A MANUFACTURER PERFOMRED AVERAGE WITH NO PROBLEMS, OR SIGNIFICANT NCR'S NOTED, OR DELAYS EXPERIENCED, THEN ENTER A SCORE OF “3". SUPPORT ANY INDIVIDUAL SCORE OF “2" OR LESS OR “4" OR MORE WITH A WRITTEN EXPLANATION. |
| EVALUATION CONDITIONS: | EVALUATION CONDITIONS: | EVALUATION CONDITIONS: | EVALUATION CONDITIONS: | EVALUATION CONDITIONS: |
| SCORE | ||||
| 1. QUALITY SYSTEM MAINTAINED ADEQUATE CONTROL OF MANUFACTURING, INSPECTION AND TESTING. | 1. QUALITY SYSTEM MAINTAINED ADEQUATE CONTROL OF MANUFACTURING, INSPECTION AND TESTING. | 1. QUALITY SYSTEM MAINTAINED ADEQUATE CONTROL OF MANUFACTURING, INSPECTION AND TESTING. | 1. QUALITY SYSTEM MAINTAINED ADEQUATE CONTROL OF MANUFACTURING, INSPECTION AND TESTING. | |
| 2. IDENTIFIED QUALITY PROBLEMS AND TOOK POSITIVE CORRECTIVE ACTION. | 2. IDENTIFIED QUALITY PROBLEMS AND TOOK POSITIVE CORRECTIVE ACTION. | 2. IDENTIFIED QUALITY PROBLEMS AND TOOK POSITIVE CORRECTIVE ACTION. | 2. IDENTIFIED QUALITY PROBLEMS AND TOOK POSITIVE CORRECTIVE ACTION. | |
| 3. PERSONNEL KNOWLEDGEABLE OF P.O. AND PRACTICE REQUIREMENTS | 3. PERSONNEL KNOWLEDGEABLE OF P.O. AND PRACTICE REQUIREMENTS | 3. PERSONNEL KNOWLEDGEABLE OF P.O. AND PRACTICE REQUIREMENTS | 3. PERSONNEL KNOWLEDGEABLE OF P.O. AND PRACTICE REQUIREMENTS | |
| 4. PERSONNEL KNOWLEDGEABLE OF APPLICABLE CODE(S) AND STANDARDS | 4. PERSONNEL KNOWLEDGEABLE OF APPLICABLE CODE(S) AND STANDARDS | 4. PERSONNEL KNOWLEDGEABLE OF APPLICABLE CODE(S) AND STANDARDS | 4. PERSONNEL KNOWLEDGEABLE OF APPLICABLE CODE(S) AND STANDARDS | |
| 5. P.O. AND PRACTICE REQUIREMENTS IMPOSED ON SUBCONTRACTORS | 5. P.O. AND PRACTICE REQUIREMENTS IMPOSED ON SUBCONTRACTORS | 5. P.O. AND PRACTICE REQUIREMENTS IMPOSED ON SUBCONTRACTORS | 5. P.O. AND PRACTICE REQUIREMENTS IMPOSED ON SUBCONTRACTORS | |
| 6. LEVEL OF CONTROL AND INSPECTION AT SUBCONTRACTOR(S) | 6. LEVEL OF CONTROL AND INSPECTION AT SUBCONTRACTOR(S) | 6. LEVEL OF CONTROL AND INSPECTION AT SUBCONTRACTOR(S) | 6. LEVEL OF CONTROL AND INSPECTION AT SUBCONTRACTOR(S) | |
| 7. CONTROL TO ESTABLISHED PROCEDURES INCLUDING WELDING, NDE, AND TESTING | 7. CONTROL TO ESTABLISHED PROCEDURES INCLUDING WELDING, NDE, AND TESTING | 7. CONTROL TO ESTABLISHED PROCEDURES INCLUDING WELDING, NDE, AND TESTING | 7. CONTROL TO ESTABLISHED PROCEDURES INCLUDING WELDING, NDE, AND TESTING | |
| 8. CONTROL OF MATERIAL AT RECEIVING, IN-PROCESS AND FINAL INSPECTION (TRACEABILITY, HANDLING, ETC.) | 8. CONTROL OF MATERIAL AT RECEIVING, IN-PROCESS AND FINAL INSPECTION (TRACEABILITY, HANDLING, ETC.) | 8. CONTROL OF MATERIAL AT RECEIVING, IN-PROCESS AND FINAL INSPECTION (TRACEABILITY, HANDLING, ETC.) | 8. CONTROL OF MATERIAL AT RECEIVING, IN-PROCESS AND FINAL INSPECTION (TRACEABILITY, HANDLING, ETC.) | |
| 9. EQUIPMENT CALIBRATION MAINTAINED AND CURRENT | 9. EQUIPMENT CALIBRATION MAINTAINED AND CURRENT | 9. EQUIPMENT CALIBRATION MAINTAINED AND CURRENT | 9. EQUIPMENT CALIBRATION MAINTAINED AND CURRENT | |
| 10. COMMUNICATION/COORDINATION BETWEEN OFFICE AND SHOP PERSONNEL | 10. COMMUNICATION/COORDINATION BETWEEN OFFICE AND SHOP PERSONNEL | 10. COMMUNICATION/COORDINATION BETWEEN OFFICE AND SHOP PERSONNEL | 10. COMMUNICATION/COORDINATION BETWEEN OFFICE AND SHOP PERSONNEL | |
| 11. DRAWING AND DOCUMENT CONTROL INCLUDING REVISION UPDATES | 11. DRAWING AND DOCUMENT CONTROL INCLUDING REVISION UPDATES | 11. DRAWING AND DOCUMENT CONTROL INCLUDING REVISION UPDATES | 11. DRAWING AND DOCUMENT CONTROL INCLUDING REVISION UPDATES | |
| 12. PROBLEM SOLVING BY OFFICE AND SHOP PERSONNEL | 12. PROBLEM SOLVING BY OFFICE AND SHOP PERSONNEL | 12. PROBLEM SOLVING BY OFFICE AND SHOP PERSONNEL | 12. PROBLEM SOLVING BY OFFICE AND SHOP PERSONNEL | |
| 13. QUALIFICATION AND CERTIFICATION FOR WELDERS AND QC PERSONNEL MAINTAINED AND CURRENT | 13. QUALIFICATION AND CERTIFICATION FOR WELDERS AND QC PERSONNEL MAINTAINED AND CURRENT | 13. QUALIFICATION AND CERTIFICATION FOR WELDERS AND QC PERSONNEL MAINTAINED AND CURRENT | 13. QUALIFICATION AND CERTIFICATION FOR WELDERS AND QC PERSONNEL MAINTAINED AND CURRENT | |
| 14. QA/QC GIVEN ADEQUATE AUTHORITY | 14. QA/QC GIVEN ADEQUATE AUTHORITY | 14. QA/QC GIVEN ADEQUATE AUTHORITY | 14. QA/QC GIVEN ADEQUATE AUTHORITY | |
| 15. PREFABRICATION MEETING OUTCOME/SUCCESS | 15. PREFABRICATION MEETING OUTCOME/SUCCESS | 15. PREFABRICATION MEETING OUTCOME/SUCCESS | 15. PREFABRICATION MEETING OUTCOME/SUCCESS | |
| 16. PROTECTION OF FINISHED EQUIPMENT (FLANGE PROTECTION, PACKAGING, ETC.) | 16. PROTECTION OF FINISHED EQUIPMENT (FLANGE PROTECTION, PACKAGING, ETC.) | 16. PROTECTION OF FINISHED EQUIPMENT (FLANGE PROTECTION, PACKAGING, ETC.) | 16. PROTECTION OF FINISHED EQUIPMENT (FLANGE PROTECTION, PACKAGING, ETC.) | |
| 17. CONDITION OF IN-HOUSE TESTING EQUIPMENT | 17. CONDITION OF IN-HOUSE TESTING EQUIPMENT | 17. CONDITION OF IN-HOUSE TESTING EQUIPMENT | 17. CONDITION OF IN-HOUSE TESTING EQUIPMENT | |
| 18. MAINTENANCE OF QC DOCUMENTATION AND PRESENTATION OF FINAL PACKAGE | 18. MAINTENANCE OF QC DOCUMENTATION AND PRESENTATION OF FINAL PACKAGE | 18. MAINTENANCE OF QC DOCUMENTATION AND PRESENTATION OF FINAL PACKAGE | 18. MAINTENANCE OF QC DOCUMENTATION AND PRESENTATION OF FINAL PACKAGE |
| 19. AMOUNT OF CONTROL OF MANUFACTURING PROCESS IMPOSED BY MANUFACTURER'S QC ADEQUATE | |
|---|---|
| 20. AMOUNT OF REJECTS/NONCOMFORMANCES | |
| 21. OVERALL COOPERATION EXHIBITED BY MANUFACTURER'S PERSONNEL | |
| 22. OVERALL PERFORMANCE OF PRIME CONTRACTOR'S QC PERSONNEL | |
| 23. OVERALL PERFORMANCE OF SUBCONTRACTOR'S QC PERSONNEL | |
| 24. OVERALL MANUFACTURER'S PERFORMANCE | |
| 25. OTHER FACTORS NOT DISCUSSED ABOVE WHICH IMPACT THIS ORDER: | |
| NO. OF NONCONFORMANCES ISSUED ON THIS ASSIGNMENT: NO. OF DEFICIENCIES ISSUED ON THIS ASSIGNMENT: | NO. OF NONCONFORMANCES ISSUED ON THIS ASSIGNMENT: NO. OF DEFICIENCIES ISSUED ON THIS ASSIGNMENT: |
| REMARKS: | REMARKS: |
| ATTACH ADDITIONAL SHEETS AS NECESSARY | ATTACH ADDITIONAL SHEETS AS NECESSARY |
| PLANT INFORMATION | PLANT INFORMATION | PLANT INFORMATION | PLANT INFORMATION | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | MANUFACTURER'S INFORMATION | MANUFACTURER'S INFORMATION |
|---|---|---|---|---|---|---|---|---|
| PLANT LOC.: | PLANT LOC.: | PLANT LOC.: | PLANT LOC.: | INSP. NAME: | INSP. NAME: | INSP. NAME: | MFGR. NAME: | MFGR. NAME: |
| PROJECT: | PROJECT: | PROJECT: | PROJECT: | INSP. COMPANY: | INSP. COMPANY: | INSP. COMPANY: | ADDRESS: | ADDRESS: |
| PROJ. ENG.: | PROJ. ENG.: | PROJ. ENG.: | PROJ. ENG.: | INSP. P.O.: | INSP. P.O.: | INSP. P.O.: | EQUIP. DESCR.: | EQUIP. DESCR.: |
| INSP. AUTH.: | INSP. AUTH.: | INSP. AUTH.: | INSP. AUTH.: | INSP. SIGNATURE: | INSP. SIGNATURE: | INSP. SIGNATURE: | TAG NO.: | TAG NO.: |
| P.O. NO.: | P.O. NO.: | P.O. NO.: | P.O. NO.: | DATE: | DATE: | DATE: | ITEM NO.: | ITEM NO.: |
| PRIME SUBCONTRACTOR | PRIME SUBCONTRACTOR | |||||||
| DATE OF FIRST CONTACT: | DATE OF FIRST CONTACT: | DATE OF FIRST CONTACT: | DATE OF FIRST CONTACT: | DATE OF FIRST CONTACT: | DATE OF FIRST CONTACT: | DATE OF PREFAB. MTG.: | DATE OF PREFAB. MTG.: | DATE OF PREFAB. MTG.: |
| DATE OF FINAL INSPECTION: | DATE OF FINAL INSPECTION: | DATE OF FINAL INSPECTION: | DATE OF FINAL INSPECTION: | DATE OF FINAL INSPECTION: | DATE OF FINAL INSPECTION: | DATE OF SHIPMENT: | DATE OF SHIPMENT: | DATE OF SHIPMENT: |
| SHOP INSPECTION DOCUMENTATION PACKAGE | SHOP INSPECTION DOCUMENTATION PACKAGE | SHOP INSPECTION DOCUMENTATION PACKAGE | SHOP INSPECTION DOCUMENTATION PACKAGE | SHOP INSPECTION DOCUMENTATION PACKAGE | SHOP INSPECTION DOCUMENTATION PACKAGE | SHOP INSPECTION DOCUMENTATION PACKAGE | SHOP INSPECTION DOCUMENTATION PACKAGE | SHOP INSPECTION DOCUMENTATION PACKAGE |
| SHOP INSPECTION DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: | SHOP INSPECTION DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: | SHOP INSPECTION DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: | SHOP INSPECTION DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: | SHOP INSPECTION DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: | SHOP INSPECTION DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: | SHOP INSPECTION DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: | SHOP INSPECTION DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: | SHOP INSPECTION DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: |
| COMPLETED INSPECTION CHECKLISTS (BY CHECKLIST NO.): | COMPLETED INSPECTION CHECKLISTS (BY CHECKLIST NO.): | COMPLETED INSPECTION CHECKLISTS (BY CHECKLIST NO.): | COMPLETED INSPECTION CHECKLISTS (BY CHECKLIST NO.): | COMPLETED INSPECTION CHECKLISTS (BY CHECKLIST NO.): | COMPLETED INSPECTION CHECKLISTS (BY CHECKLIST NO.): | COMPLETED INSPECTION CHECKLISTS (BY CHECKLIST NO.): | COMPLETED INSPECTION CHECKLISTS (BY CHECKLIST NO.): | COMPLETED INSPECTION CHECKLISTS (BY CHECKLIST NO.): |
| NUMBER ATTACHED | NUMBER ATTACHED | DESCRIPTION OF FORM | DESCRIPTION OF FORM | DESCRIPTION OF FORM | DESCRIPTION OF FORM | DESCRIPTION OF FORM | DESCRIPTION OF FORM | DESCRIPTION OF FORM |
| FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | FIELD INSPECTION REPORT | ||
| RADIOGRAPHIC FILM REPORT | RADIOGRAPHIC FILM REPORT | RADIOGRAPHIC FILM REPORT | RADIOGRAPHIC FILM REPORT | RADIOGRAPHIC FILM REPORT | RADIOGRAPHIC FILM REPORT | RADIOGRAPHIC FILM REPORT | ||
| PIPE SPOOL INSPECTION REPORT | PIPE SPOOL INSPECTION REPORT | PIPE SPOOL INSPECTION REPORT | PIPE SPOOL INSPECTION REPORT | PIPE SPOOL INSPECTION REPORT | PIPE SPOOL INSPECTION REPORT | PIPE SPOOL INSPECTION REPORT | ||
| MANUFACTURER DEFICIENCY NOTICE | MANUFACTURER DEFICIENCY NOTICE | MANUFACTURER DEFICIENCY NOTICE | MANUFACTURER DEFICIENCY NOTICE | MANUFACTURER DEFICIENCY NOTICE | MANUFACTURER DEFICIENCY NOTICE | MANUFACTURER DEFICIENCY NOTICE | ||
| MANUFACTURER NONCONFORMANCE REPORT | MANUFACTURER NONCONFORMANCE REPORT | MANUFACTURER NONCONFORMANCE REPORT | MANUFACTURER NONCONFORMANCE REPORT | MANUFACTURER NONCONFORMANCE REPORT | MANUFACTURER NONCONFORMANCE REPORT | MANUFACTURER NONCONFORMANCE REPORT | ||
| FINAL INSPECTION RELEASE | FINAL INSPECTION RELEASE | FINAL INSPECTION RELEASE | FINAL INSPECTION RELEASE | FINAL INSPECTION RELEASE | FINAL INSPECTION RELEASE | FINAL INSPECTION RELEASE | ||
| MANUFACTURER REQUEST FOR VARIANCE | MANUFACTURER REQUEST FOR VARIANCE | MANUFACTURER REQUEST FOR VARIANCE | MANUFACTURER REQUEST FOR VARIANCE | MANUFACTURER REQUEST FOR VARIANCE | MANUFACTURER REQUEST FOR VARIANCE | MANUFACTURER REQUEST FOR VARIANCE | ||
| MANUFACTURER CLOSE OUT EVALUATION | MANUFACTURER CLOSE OUT EVALUATION | MANUFACTURER CLOSE OUT EVALUATION | MANUFACTURER CLOSE OUT EVALUATION | MANUFACTURER CLOSE OUT EVALUATION | MANUFACTURER CLOSE OUT EVALUATION | MANUFACTURER CLOSE OUT EVALUATION | ||
| MANUFACTURER ALERT NOTICE | MANUFACTURER ALERT NOTICE | MANUFACTURER ALERT NOTICE | MANUFACTURER ALERT NOTICE | MANUFACTURER ALERT NOTICE | MANUFACTURER ALERT NOTICE | MANUFACTURER ALERT NOTICE | ||
| ADDITIONAL COMMENTS REGARDING INSPECTION DOCUMENTATION: | ADDITIONAL COMMENTS REGARDING INSPECTION DOCUMENTATION: | ADDITIONAL COMMENTS REGARDING INSPECTION DOCUMENTATION: | ADDITIONAL COMMENTS REGARDING INSPECTION DOCUMENTATION: | ADDITIONAL COMMENTS REGARDING INSPECTION DOCUMENTATION: | ADDITIONAL COMMENTS REGARDING INSPECTION DOCUMENTATION: | ADDITIONAL COMMENTS REGARDING INSPECTION DOCUMENTATION: | ADDITIONAL COMMENTS REGARDING INSPECTION DOCUMENTATION: | ADDITIONAL COMMENTS REGARDING INSPECTION DOCUMENTATION: |
| EQUIPMENT DOCUMENTATION PACKAGE | EQUIPMENT DOCUMENTATION PACKAGE | EQUIPMENT DOCUMENTATION PACKAGE | EQUIPMENT DOCUMENTATION PACKAGE | EQUIPMENT DOCUMENTATION PACKAGE | EQUIPMENT DOCUMENTATION PACKAGE | EQUIPMENT DOCUMENTATION PACKAGE | EQUIPMENT DOCUMENTATION PACKAGE | EQUIPMENT DOCUMENTATION PACKAGE |
| EQUIPMENT DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: | EQUIPMENT DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: | EQUIPMENT DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: | EQUIPMENT DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: | EQUIPMENT DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: | EQUIPMENT DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: | EQUIPMENT DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: | EQUIPMENT DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: | EQUIPMENT DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: |
| REQUI RED | COMPLET ED | COMPLET ED | NO. OF COPIES INCLUDED | NO. OF COPIES INCLUDED | DESCRIPTION | DESCRIPTION | DESCRIPTION | COMMENTS |
| MANUFACTURER'S DATA REPORT | MANUFACTURER'S DATA REPORT | MANUFACTURER'S DATA REPORT | ||||||
| MATERIAL TEST REPORTS | MATERIAL TEST REPORTS | MATERIAL TEST REPORTS | ||||||
| WELDING PROCEDURES | WELDING PROCEDURES | WELDING PROCEDURES | ||||||
| HYDROTEST REPORTS | HYDROTEST REPORTS | HYDROTEST REPORTS | ||||||
| U-1 REPORTS | U-1 REPORTS | U-1 REPORTS | ||||||
| R-1 REPORTS | R-1 REPORTS | R-1 REPORTS | ||||||
| BASELINE THICKNESS | BASELINE THICKNESS | BASELINE THICKNESS | ||||||
| CONSTRUCTION DRAWINGS | CONSTRUCTION DRAWINGS | CONSTRUCTION DRAWINGS | ||||||
| OTHER (SPECIFY) | OTHER (SPECIFY) | OTHER (SPECIFY) | ||||||
| OTHER DOCUMENTATION INCLUDED (PROVIDE BRIEF DESCRIPTION): | OTHER DOCUMENTATION INCLUDED (PROVIDE BRIEF DESCRIPTION): |
|---|---|
| THE DOCUMENTATION ATTACHED TO THIS FORM REPRESENTS FOR THIS ORDER ALL THE MANUFACTURING DOCUMENTATION REQUIRED BY THE APPLICABLE ENGINEERING PRACTICES AND ALL SHOP INSPECTION RELATED FORMS AND REPORTS REQUIRED BY THIS ENGINEERING PRACTICE. | THE DOCUMENTATION ATTACHED TO THIS FORM REPRESENTS FOR THIS ORDER ALL THE MANUFACTURING DOCUMENTATION REQUIRED BY THE APPLICABLE ENGINEERING PRACTICES AND ALL SHOP INSPECTION RELATED FORMS AND REPORTS REQUIRED BY THIS ENGINEERING PRACTICE. |
| SIGNED: | DATE: |
| (INSPECTOR PRIMARILY RESPONSIBLE FOR SHOP INSPECTION) | (INSPECTOR PRIMARILY RESPONSIBLE FOR SHOP INSPECTION) |
| THE ATTACHED DOCUMENTATION HAS BEEN REVIEWED AND ACCEPTED AS BEING COMPLETE AND CORRECT FOR THIS ORDER. | THE ATTACHED DOCUMENTATION HAS BEEN REVIEWED AND ACCEPTED AS BEING COMPLETE AND CORRECT FOR THIS ORDER. |
| SIGNED: | DATE: |
| (IPE REPRESENTATIVE ACCEPTING DOCUMENTATION) | (IPE REPRESENTATIVE ACCEPTING DOCUMENTATION) |
© 2026 Inflection Point Engineering, LLC. All rights reserved. The content of this page — including calculation methods, reference data, written analysis, interactive tools, and source code — is the intellectual property of Inflection Point Engineering, LLC and is protected under applicable copyright, trademark, and trade secret laws. Unauthorized reproduction, redistribution, modification, or derivative use in whole or in part is prohibited without prior written consent.
Disclaimer. This material is provided for informational and educational purposes only and does not constitute professional engineering advice. Calculations, reference data, and methodologies are based on published standards and accepted engineering practice but are not a substitute for engineering judgment, site-specific analysis, or review by a licensed Professional Engineer. Inflection Point Engineering, LLC makes no warranties, express or implied, regarding the accuracy, completeness, or fitness for a particular purpose of any content presented here, and shall not be liable for any direct, indirect, incidental, or consequential damages arising from its use. Users assume all risk associated with applying this content to real-world design, operations, or decisions.
© 2026 Inflection Point Engineering, LLC. All rights reserved.