Inflection Point Engineering Section 15 — Inspection

Quality Assurance for the Manufacture of Refinery Equipment

IPE Engineering Practice IPE-EP-15-1-2

Document number: IPE-EP-15-1-2 · Section: 15 — Inspection

1.0

1.1

1.2

1.3

1.4

2.0

3.0

3.1

3.2

3.3

3.4

3.5

3.6

3.7

SCOPE

This document describes the elements of a program necessary for IPE Plants to assure adequate quality assurance of purchased critical equipment.

Unless otherwise determined by the Owner’s Engineer, the manufacture of instrumentation and electrical equipment are not included in the scope of this document.

Any deviation to this Practice must be approved by the procedures described in EP 1–1–3.

An asterisk (*) indicates that a decision or approval by the Owner or the Owner’s Engineer is required, or that additional information is furnished by the Purchaser.

REFERENCES

The latest editions of the following standards and publications are referred to herein.

STANDARDS AND PUBLICATIONS

IPE Engineering Practices
EP 1–1–3 Deviations to IPE Engineering Practices EP 15–1–4 Positive Materials Identification (PMI)
EP 15–1–6 Procedures for the Use of Inspection Checklists
Federal Register
OSHA
29CFR 1910.119 Process Safety Management of Highly Hazardous Materials

DEFINITIONS

Critical Equipment - Pressure vessels, process piping, utility piping, heat exchangers, process heaters, boilers, compressors, pumps, tanks, non–commodity valves other than instrumented control, structures, and foundations selected by the Owner’s Engineer.

Inspection Authority - An individual appointed or approved by the Owner who is responsible for the Owner’s quality assurance program and has the knowledge and training to resolve issues relating to inspection and quality.

Manufacturer - The recipient of a direct or indirect purchase order for materials and/or equipment. In this context, a direct order is one issued to a manufacturer by a contractor or the Owner. An indirect order is one issued to a manufacturer by a vendor (recipient of a direct order) for materials, fabricated components, or subassemblies.

Owner - Inflection Point Engineering, LLC .

Owner’s Engineer - A Inflection Point Engineering, LLC appointed engineer.

Purchase Order - The contractual document given to the Manufacturer to authorize a purchase.

Quality Assurance - All those planned and systematic actions necessary to ensure quality, i.e. to provide adequate confidence that a product or service will be fit to meet all requirements.

3.8

3.9

3.10

3.11

4.0

4.1

4.2

4.3

5.0

5.1

5.1.1

5.1.2

5.1.3

5.2

5.2.1

5.2.2

5.2.3

5.2.4

5.3

Quality Conformance – Conformance to specified quality requirements.

Quality Control - Performance of thorough inspections which measure the effectiveness of the Quality Assurance program.

Quality Program - Documented policies and procedures which establish the means by which quality is to be attained.

Shop Inspector - An engineer or inspector appointed by IPE to carry out shop inspection of plant equipment.

GENERAL

All critical equipment purchased by IPE Company or its representatives shall be manufactured in accordance with the requirements of IPE Engineering Practices and any other requirements of the Purchase Order. In order to assure these requirements are met, the manufacturer’s operations shall be subject to the Owner’s Quality Assurance Program.

With the approval of the Owner’s Engineer, other Quality Assurance programs may be substituted for the one described here; however, the program utilized shall contain at least the same level of control and documentation as described in this practice.

The documentation used to assure compliance with the program provides evidence necessary to demonstrate the Owner has complied with elements of mechanical integrity contained in OSHA 29 CFR 1910.119.

RESPONSIBILITIES

The Owner’s Engineer shall:

(*)Provide information in all bid and purchase order drawings and documents to adequately describe the design and manufacturing requirements necessary to properly produce equipment which will fulfill its intended use safely and reliably.

(*)Determine the amount and intensity of inspection to assure that the manufacturer has met the necessary requirements of the Purchase Order.

(*)Have the ultimate responsibility to review and resolve any problems associated with the equipment manufacture.

The Inspection Authority shall:

Consult with and assist the Owner’s Engineer in areas relating to shop inspection.

Appoint shop inspectors to follow manufacture of equipment in the manufacturer’s facility.

Coordinate and monitor shop inspectors and report to the Owner’s Engineer all relevant inspection activities.

Notify the Owner’s Engineer of any problems identified by the Shop Inspector that may require his attention.

The Shop Inspector shall:

PREPARING BID INFORMATION

PREFABRICATION MEETING

ELEMENTS OF SHOP INSPECTION

SHOP INSPECTION DOCUMENTATION AND PROCEDURES

REQUESTING CHANGES

VENDOR PERFORMANCE EVALUATION

Material Management.

11.2 If the Manufacturer is a vendor which the owner uses on a routine basis, the Inspection Authority may instruct the Shop Inspector not to perform a Shop Evaluation less frequently than for every order, such as once a year, unless the vendor’s performance is in question.

SHOP INSPECTION DOCUMENT CONTROL

13.0 QUALITY ASSURANCE FORMS

FORM 1 - FIELD INSPECTION REPORT

FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT
PLANT INFORMATION PLANT INFORMATION PLANT INFORMATION FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT MANUFACTURER'S INFORMATION
PLANT LOC.: PLANT LOC.: PLANT LOC.: INSP. NAME: INSP. NAME: INSP. NAME: INSP. NAME: INSP. NAME: MFGR. NAME:
PROJECT: PROJECT: PROJECT: INSP. COMPANY: INSP. COMPANY: INSP. COMPANY: INSP. COMPANY: INSP. COMPANY: ADDRESS:
PROJ. ENG.: PROJ. ENG.: PROJ. ENG.: INSP. P.O.: INSP. P.O.: INSP. P.O.: INSP. P.O.: INSP. P.O.: EQUIP. DESCR.:
INSP. AUTH.: INSP. AUTH.: INSP. AUTH.: INSP. SIGNATURE: INSP. SIGNATURE: INSP. SIGNATURE: INSP. SIGNATURE: INSP. SIGNATURE: TAG NO.:
P.O. NO.: P.O. NO.: P.O. NO.: DATE: DATE: DATE: DATE: DATE: ITEM NO.:
PRIME SUBCONTRACTOR
LOCATION: LOCATION: LOCATION: CONTACT: CONTACT: CONTACT: CONTACT: CONTACT: PHONE NO.
MATERIAL DESCRIPTION: MATERIAL DESCRIPTION: MATERIAL DESCRIPTION: ITEM NO(S): ITEM NO(S): ITEM NO(S): ITEM NO(S): ITEM NO(S): ITEM NO(S):
PURPOSE OF VISIT: PREFAB MTG. DOCUMENT REVIEW REVIEW ITEMS WITNESS POINT
HOLD POINT FINAL INSPECTION OTHER
PURPOSE OF VISIT: PREFAB MTG. DOCUMENT REVIEW REVIEW ITEMS WITNESS POINT
HOLD POINT FINAL INSPECTION OTHER
PURPOSE OF VISIT: PREFAB MTG. DOCUMENT REVIEW REVIEW ITEMS WITNESS POINT
HOLD POINT FINAL INSPECTION OTHER
PURPOSE OF VISIT: PREFAB MTG. DOCUMENT REVIEW REVIEW ITEMS WITNESS POINT
HOLD POINT FINAL INSPECTION OTHER
PURPOSE OF VISIT: PREFAB MTG. DOCUMENT REVIEW REVIEW ITEMS WITNESS POINT
HOLD POINT FINAL INSPECTION OTHER
PURPOSE OF VISIT: PREFAB MTG. DOCUMENT REVIEW REVIEW ITEMS WITNESS POINT
HOLD POINT FINAL INSPECTION OTHER
PURPOSE OF VISIT: PREFAB MTG. DOCUMENT REVIEW REVIEW ITEMS WITNESS POINT
HOLD POINT FINAL INSPECTION OTHER
PURPOSE OF VISIT: PREFAB MTG. DOCUMENT REVIEW REVIEW ITEMS WITNESS POINT
HOLD POINT FINAL INSPECTION OTHER
PURPOSE OF VISIT: PREFAB MTG. DOCUMENT REVIEW REVIEW ITEMS WITNESS POINT
HOLD POINT FINAL INSPECTION OTHER
FREQUENCY LEVEL: FREQUENCY LEVEL: INSPECTION LEVEL:: INSPECTION LEVEL:: INSPECTION LEVEL:: INSPECTION LEVEL:: INSPECTION LEVEL:: DATE: DATE:
INSPECTION ITEMS PERFORMED: (CHECK ALL APPLICABLE) INSPECTION ITEMS PERFORMED: (CHECK ALL APPLICABLE) INSPECTION ITEMS PERFORMED: (CHECK ALL APPLICABLE) INSPECTION ITEMS PERFORMED: (CHECK ALL APPLICABLE) INSPECTION ITEMS PERFORMED: (CHECK ALL APPLICABLE) INSPECTION ITEMS PERFORMED: (CHECK ALL APPLICABLE) INSPECTION ITEMS PERFORMED: (CHECK ALL APPLICABLE) INSPECTION ITEMS PERFORMED: (CHECK ALL APPLICABLE) INSPECTION ITEMS PERFORMED: (CHECK ALL APPLICABLE)
PREFABRICATION REVIEW PREFABRICATION REVIEW PREFABRICATION REVIEW PREFABRICATION REVIEW DOCUMENTATION REVIEW DOCUMENTATION REVIEW DOCUMENTATION REVIEW
RECEIVING INSPECTION RECEIVING INSPECTION RECEIVING INSPECTION RECEIVING INSPECTION WITNESS/REVIEW NDE WITNESS/REVIEW NDE WITNESS/REVIEW NDE
POSITIVE MATERIAL IDENTIFICATION POSITIVE MATERIAL IDENTIFICATION POSITIVE MATERIAL IDENTIFICATION POSITIVE MATERIAL IDENTIFICATION VERIFY MATERIAL PREPARATION VERIFY MATERIAL PREPARATION VERIFY MATERIAL PREPARATION
WITNESS PQR TESTING WITNESS PQR TESTING WITNESS PQR TESTING WITNESS PQR TESTING VERIFY FIT-UPS VERIFY FIT-UPS VERIFY FIT-UPS
WITNESS WELDER QUALIFICATION WITNESS WELDER QUALIFICATION WITNESS WELDER QUALIFICATION WITNESS WELDER QUALIFICATION WITNESS ASSEMBLY WITNESS ASSEMBLY WITNESS ASSEMBLY
VERIFY DIMENSIONS VERIFY DIMENSIONS VERIFY DIMENSIONS VERIFY DIMENSIONS WITNESS TUBE ROLLING WITNESS TUBE ROLLING WITNESS TUBE ROLLING
VERIFY MACHINING/DRILLING VERIFY MACHINING/DRILLING VERIFY MACHINING/DRILLING VERIFY MACHINING/DRILLING WITNESS BALANCING/RUN-OUTS WITNESS BALANCING/RUN-OUTS WITNESS BALANCING/RUN-OUTS
HYDROSTATIC/PRESSURE TEST HYDROSTATIC/PRESSURE TEST HYDROSTATIC/PRESSURE TEST HYDROSTATIC/PRESSURE TEST WITNESS FUNCTIONAL/OPERATIONAL TEST WITNESS FUNCTIONAL/OPERATIONAL TEST WITNESS FUNCTIONAL/OPERATIONAL TEST
VERIFY PAINTING/COATING/LINING VERIFY PAINTING/COATING/LINING VERIFY PAINTING/COATING/LINING VERIFY PAINTING/COATING/LINING WITNESS PERFORMANCE TEST WITNESS PERFORMANCE TEST WITNESS PERFORMANCE TEST
VISUAL INSPECTION VISUAL INSPECTION VISUAL INSPECTION VISUAL INSPECTION WITNESS MECHANICAL RUN WITNESS MECHANICAL RUN WITNESS MECHANICAL RUN
VERIFY TAGGING/MARKING VERIFY TAGGING/MARKING VERIFY TAGGING/MARKING VERIFY TAGGING/MARKING VERIFY CRATING/PACKAGING VERIFY CRATING/PACKAGING VERIFY CRATING/PACKAGING
OTHER OTHER OTHER OTHER
ACTION REQUIRED BY IPE/PROJECT ACTION REQUIRED BY MANUFACTURER (CHECK ONE IF ACTION REQUIRED) ACTION REQUIRED BY IPE/PROJECT ACTION REQUIRED BY MANUFACTURER (CHECK ONE IF ACTION REQUIRED) ACTION REQUIRED BY IPE/PROJECT ACTION REQUIRED BY MANUFACTURER (CHECK ONE IF ACTION REQUIRED) ACTION REQUIRED BY IPE/PROJECT ACTION REQUIRED BY MANUFACTURER (CHECK ONE IF ACTION REQUIRED) ACTION REQUIRED BY IPE/PROJECT ACTION REQUIRED BY MANUFACTURER (CHECK ONE IF ACTION REQUIRED) ACTION REQUIRED BY IPE/PROJECT ACTION REQUIRED BY MANUFACTURER (CHECK ONE IF ACTION REQUIRED) ACTION REQUIRED BY IPE/PROJECT ACTION REQUIRED BY MANUFACTURER (CHECK ONE IF ACTION REQUIRED) ACTION REQUIRED BY IPE/PROJECT ACTION REQUIRED BY MANUFACTURER (CHECK ONE IF ACTION REQUIRED) ACTION REQUIRED BY IPE/PROJECT ACTION REQUIRED BY MANUFACTURER (CHECK ONE IF ACTION REQUIRED)
ACTION REQUIRED: ACTION REQUIRED: ACTION REQUIRED: ACTION REQUIRED: ACTION REQUIRED: ACTION REQUIRED: ACTION REQUIRED: ACTION REQUIRED: ACTION REQUIRED:
RESULTS OF VISIT: ACCEPTABLE CONDITIONAL UNACCEPTABLE RESULTS OF VISIT: ACCEPTABLE CONDITIONAL UNACCEPTABLE RESULTS OF VISIT: ACCEPTABLE CONDITIONAL UNACCEPTABLE RESULTS OF VISIT: ACCEPTABLE CONDITIONAL UNACCEPTABLE RESULTS OF VISIT: ACCEPTABLE CONDITIONAL UNACCEPTABLE RESULTS OF VISIT: ACCEPTABLE CONDITIONAL UNACCEPTABLE RESULTS OF VISIT: ACCEPTABLE CONDITIONAL UNACCEPTABLE RESULTS OF VISIT: ACCEPTABLE CONDITIONAL UNACCEPTABLE RESULTS OF VISIT: ACCEPTABLE CONDITIONAL UNACCEPTABLE
COMMENTS: COMMENTS: COMMENTS: COMMENTS: COMMENTS: COMMENTS: COMMENTS: COMMENTS: COMMENTS:
DEFICIENCIES AND/OR NONCOMFORMANCES OUTSTANDING YES NO DEFICIENCIES AND/OR NONCOMFORMANCES OUTSTANDING YES NO DEFICIENCIES AND/OR NONCOMFORMANCES OUTSTANDING YES NO DEFICIENCIES AND/OR NONCOMFORMANCES OUTSTANDING YES NO DEFICIENCIES AND/OR NONCOMFORMANCES OUTSTANDING YES NO DEFICIENCIES AND/OR NONCOMFORMANCES OUTSTANDING YES NO DEFICIENCIES AND/OR NONCOMFORMANCES OUTSTANDING YES NO DEFICIENCIES AND/OR NONCOMFORMANCES OUTSTANDING YES NO DEFICIENCIES AND/OR NONCOMFORMANCES OUTSTANDING YES NO
ATTACHED TO THIS REPORT: FINAL RELEASE DEFICIENCY NONCONFORMANCE QC DOCUMENTATION
CLOSE OUT EVALUATION REQUEST FOR DEVIATION ALERT NOTICE OTHER
ATTACHED TO THIS REPORT: FINAL RELEASE DEFICIENCY NONCONFORMANCE QC DOCUMENTATION
CLOSE OUT EVALUATION REQUEST FOR DEVIATION ALERT NOTICE OTHER
ATTACHED TO THIS REPORT: FINAL RELEASE DEFICIENCY NONCONFORMANCE QC DOCUMENTATION
CLOSE OUT EVALUATION REQUEST FOR DEVIATION ALERT NOTICE OTHER
ATTACHED TO THIS REPORT: FINAL RELEASE DEFICIENCY NONCONFORMANCE QC DOCUMENTATION
CLOSE OUT EVALUATION REQUEST FOR DEVIATION ALERT NOTICE OTHER
ATTACHED TO THIS REPORT: FINAL RELEASE DEFICIENCY NONCONFORMANCE QC DOCUMENTATION
CLOSE OUT EVALUATION REQUEST FOR DEVIATION ALERT NOTICE OTHER
ATTACHED TO THIS REPORT: FINAL RELEASE DEFICIENCY NONCONFORMANCE QC DOCUMENTATION
CLOSE OUT EVALUATION REQUEST FOR DEVIATION ALERT NOTICE OTHER
ATTACHED TO THIS REPORT: FINAL RELEASE DEFICIENCY NONCONFORMANCE QC DOCUMENTATION
CLOSE OUT EVALUATION REQUEST FOR DEVIATION ALERT NOTICE OTHER
ATTACHED TO THIS REPORT: FINAL RELEASE DEFICIENCY NONCONFORMANCE QC DOCUMENTATION
CLOSE OUT EVALUATION REQUEST FOR DEVIATION ALERT NOTICE OTHER
ATTACHED TO THIS REPORT: FINAL RELEASE DEFICIENCY NONCONFORMANCE QC DOCUMENTATION
CLOSE OUT EVALUATION REQUEST FOR DEVIATION ALERT NOTICE OTHER
THIS IS THE FINAL REPORT: YES NO THIS IS THE FINAL REPORT: YES NO THIS IS THE FINAL REPORT: YES NO THIS IS THE FINAL REPORT: YES NO THIS IS THE FINAL REPORT: YES NO THIS IS THE FINAL REPORT: YES NO THIS IS THE FINAL REPORT: YES NO THIS IS THE FINAL REPORT: YES NO THIS IS THE FINAL REPORT: YES NO
COMMENTS: COMMENTS: COMMENTS: COMMENTS: COMMENTS: COMMENTS: COMMENTS: COMMENTS: COMMENTS:

FORM 2 - RADIOGRAPHIC REPORT

RADIOGRAPHIC REPORT RADIOGRAPHIC REPORT RADIOGRAPHIC REPORT RADIOGRAPHIC REPORT RADIOGRAPHIC REPORT
PLANT INFORMATION PLANT INFORMATION PLANT INFORMATION FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT MANUFACTURER'S INFORMATION MANUFACTURER'S INFORMATION MANUFACTURER'S INFORMATION
PLANT LOC.: PLANT LOC.: PLANT LOC.: INSP. NAME: INSP. NAME: INSP. NAME: INSP. NAME: INSP. NAME: MFGR. NAME: MFGR. NAME: MFGR. NAME:
PROJECT: PROJECT: PROJECT: INSP. COMPANY: INSP. COMPANY: INSP. COMPANY: INSP. COMPANY: INSP. COMPANY: ADDRESS: ADDRESS: ADDRESS:
PROJ. ENG.: PROJ. ENG.: PROJ. ENG.: INSP. P.O.: INSP. P.O.: INSP. P.O.: INSP. P.O.: INSP. P.O.: EQUIP. DESCR.: EQUIP. DESCR.: EQUIP. DESCR.:
INSP. AUTH.: INSP. AUTH.: INSP. AUTH.: INSP. SIGNATURE: INSP. SIGNATURE: INSP. SIGNATURE: INSP. SIGNATURE: INSP. SIGNATURE: TAG NO.: TAG NO.: TAG NO.:
P.O. NO.: P.O. NO.: P.O. NO.: DATE: DATE: DATE: DATE: DATE: ITEM NO.: ITEM NO.: ITEM NO.:
PRIME SUBCONTRACTOR PRIME SUBCONTRACTOR PRIME SUBCONTRACTOR
NOZZLE, SEAM NO OR PART NO.. WELD/SPOOL NO. OR CASTING NO./PATTERN LOCATION FILM LOCATION FILM DEFECT TYPE DEFECT TYPE ACCEPT REJECT REJECT DENSITY REMARKS

DEFECT LEGEND:

S=SLAG P=POROSITY LF=LACK OF FUSION EP=EXCESSIVE PENETRATION I=INCLUSION C=CRACK HR=HOLLOW ROOT ILP=INLINE POROSITY IP= INCOMPLETE PENETRATION UC=UNDERCUT SHR=SHRINKAGE CHP=CHAPLET HT=HOT TEAR DR=DROSS S=SAND CS=CORE SHIFT

FORM 3 - PIPE SPOOL INSPECTION REPORT

PIPE SPOOL INSPECTION REPORT PIPE SPOOL INSPECTION REPORT
PLANT INFORMATION FIELD INSPECTION REPORT FIELD INSPECTION REPORT MANUFACTURER'S INFORMATION
PLANT LOC.: INSP. NAME: INSP. NAME: MFGR. NAME:
PROJECT: INSP. COMPANY: INSP. COMPANY: ADDRESS:
PROJ. ENG.: INSP. P.O.: INSP. P.O.: EQUIP. DESCR.:
INSP. AUTH.: INSP. SIGNATURE: INSP. SIGNATURE: TAG NO.:
P.O. NO.: DATE: DATE: ITEM NO.:
PRIME SUBCONTRACTOR
ISO LINE NUMBER SPOOL SHEET NUMBER SPOOL SHEET REV.NO. PIPE SIZE(S) MATERIAL ASTM PIPING CLASS HEAT TREAT DATE HARDNES S RESULTS REVIEW RT. FILM DATE HYDRO TEST PRESS DIM. CHECKS PAINTING/ MARKING DOC. PACKAGE REVIEW SPOOL RELEASE DATE

FORM 4 - DEFICIENCY NOTICE

DEFICIENCY NOTICE DEFICIENCY NOTICE DEFICIENCY NOTICE DEFICIENCY NOTICE DEFICIENCY NOTICE DEFICIENCY NOTICE DEFICIENCY NOTICE DEFICIENCY NOTICE DEFICIENCY NOTICE DEFICIENCY NOTICE DEFICIENCY NOTICE DEFICIENCY NOTICE
PLANT INFORMATION PLANT INFORMATION PLANT INFORMATION PLANT INFORMATION PLANT INFORMATION PLANT INFORMATION PLANT INFORMATION PLANT INFORMATION PLANT INFORMATION FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT MANUFACTURER'S INFORMATION MANUFACTURER'S INFORMATION MANUFACTURER'S INFORMATION MANUFACTURER'S INFORMATION MANUFACTURER'S INFORMATION MANUFACTURER'S INFORMATION
PLANT LOC.: PLANT LOC.: PLANT LOC.: PLANT LOC.: PLANT LOC.: PLANT LOC.: PLANT LOC.: PLANT LOC.: PLANT LOC.: INSP. NAME: INSP. NAME: INSP. NAME: INSP. NAME: INSP. NAME: INSP. NAME: INSP. NAME: INSP. NAME: MFGR. NAME: MFGR. NAME: MFGR. NAME: MFGR. NAME: MFGR. NAME: MFGR. NAME:
PROJECT: PROJECT: PROJECT: PROJECT: PROJECT: PROJECT: PROJECT: PROJECT: PROJECT: INSP. COMPANY: INSP. COMPANY: INSP. COMPANY: INSP. COMPANY: INSP. COMPANY: INSP. COMPANY: INSP. COMPANY: INSP. COMPANY: ADDRESS: ADDRESS: ADDRESS: ADDRESS: ADDRESS: ADDRESS:
PROJ. ENG.: PROJ. ENG.: PROJ. ENG.: PROJ. ENG.: PROJ. ENG.: PROJ. ENG.: PROJ. ENG.: PROJ. ENG.: PROJ. ENG.: INSP. P.O.: INSP. P.O.: INSP. P.O.: INSP. P.O.: INSP. P.O.: INSP. P.O.: INSP. P.O.: INSP. P.O.: EQUIP. DESCR.: EQUIP. DESCR.: EQUIP. DESCR.: EQUIP. DESCR.: EQUIP. DESCR.: EQUIP. DESCR.:
INSP. AUTH.: INSP. AUTH.: INSP. AUTH.: INSP. AUTH.: INSP. AUTH.: INSP. AUTH.: INSP. AUTH.: INSP. AUTH.: INSP. AUTH.: INSP. SIGNATURE: INSP. SIGNATURE: INSP. SIGNATURE: INSP. SIGNATURE: INSP. SIGNATURE: INSP. SIGNATURE: INSP. SIGNATURE: INSP. SIGNATURE: TAG NO.: TAG NO.: TAG NO.: TAG NO.: TAG NO.: TAG NO.:
P.O. NO.: P.O. NO.: P.O. NO.: P.O. NO.: P.O. NO.: P.O. NO.: P.O. NO.: P.O. NO.: P.O. NO.: DATE: DATE: DATE: DATE: DATE: DATE: DATE: DATE: ITEM NO.: ITEM NO.: ITEM NO.: ITEM NO.: ITEM NO.: ITEM NO.:
PRIME SUBCONTRACTOR PRIME SUBCONTRACTOR PRIME SUBCONTRACTOR PRIME SUBCONTRACTOR PRIME SUBCONTRACTOR PRIME SUBCONTRACTOR
DEFICIENCY NOTICE NO: DEFICIENCY NOTICE NO: DEFICIENCY NOTICE NO: DEFICIENCY NOTICE NO: DEFICIENCY NOTICE NO: DEFICIENCY NOTICE NO: DEFICIENCY NOTICE NO: DEFICIENCY NOTICE NO: DEFICIENCY NOTICE NO: DEFICIENCY NOTICE NO: DEFICIENCY NOTICE NO: DEFICIENCY NOTICE NO: DEFICIENCY NOTICE NO: DEFICIENCY NOTICE NO: (FIRST NOTICE FOR THIS ORDER = 01) (FIRST NOTICE FOR THIS ORDER = 01) (FIRST NOTICE FOR THIS ORDER = 01) (FIRST NOTICE FOR THIS ORDER = 01) (FIRST NOTICE FOR THIS ORDER = 01) (FIRST NOTICE FOR THIS ORDER = 01) (FIRST NOTICE FOR THIS ORDER = 01) (FIRST NOTICE FOR THIS ORDER = 01) (FIRST NOTICE FOR THIS ORDER = 01)
DESCRIPTION OF DEFICIENCY: DESCRIPTION OF DEFICIENCY: DESCRIPTION OF DEFICIENCY: DESCRIPTION OF DEFICIENCY: DESCRIPTION OF DEFICIENCY: DESCRIPTION OF DEFICIENCY: DESCRIPTION OF DEFICIENCY: DESCRIPTION OF DEFICIENCY: DESCRIPTION OF DEFICIENCY: DESCRIPTION OF DEFICIENCY: DESCRIPTION OF DEFICIENCY: DESCRIPTION OF DEFICIENCY: DESCRIPTION OF DEFICIENCY: DESCRIPTION OF DEFICIENCY: DESCRIPTION OF DEFICIENCY: DESCRIPTION OF DEFICIENCY: DESCRIPTION OF DEFICIENCY: DESCRIPTION OF DEFICIENCY: DESCRIPTION OF DEFICIENCY: DESCRIPTION OF DEFICIENCY: DESCRIPTION OF DEFICIENCY: DESCRIPTION OF DEFICIENCY: DESCRIPTION OF DEFICIENCY:
CATEGORY: CATEGORY: PROCEDURAL PROCEDURAL PROCEDURAL QUANTITY QUANTITY QUANTITY QUANTITY QUANTITY NDE NDE NDE TESTING TESTING TESTING WELDING WELDING WELDING WORKMANSHIP WORKMANSHIP WORKMANSHIP DESIGN
DOCUMENTATION DOCUMENTATION DOCUMENTATION DOCUMENTATION MATERIAL MATERIAL MATERIAL DIMENSIONAL DIMENSIONAL DIMENSIONAL DIMENSIONAL DIMENSIONAL PACKAGING PACKAGING PACKAGING PACKAGING SPECIFICATION/DATA SHEET SPECIFICATION/DATA SHEET SPECIFICATION/DATA SHEET SPECIFICATION/DATA SHEET SPECIFICATION/DATA SHEET NOTIFICATION NOTIFICATION
OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY):
ROOT CAUSE: MANUFACTURER SYSTEM
FAILURE
MANUFACTURER SYSTEM
FAILURE
MANUFACTURER SYSTEM
FAILURE
MANUFACTURER SYSTEM
FAILURE
MANUFACTURER SYSTEM
FAILURE
MANUFACTURER SYSTEM
FAILURE
MANUFACTURER SYSTEM
FAILURE
MANUFACTURER SYSTEM
FAILURE
MANUFACTURER SYSTEM
FAILURE
MANUFACTURER SYSTEM
FAILURE
MANUFACTURER QC FAILURE MANUFACTURER QC FAILURE MANUFACTURER QC FAILURE MANUFACTURER QC FAILURE MANUFACTURER QC FAILURE MANUFACTURER QC FAILURE MANUFACTURER QC FAILURE REQUIREMENT DEFINITION REQUIREMENT DEFINITION REQUIREMENT DEFINITION REQUIREMENT DEFINITION REQUIREMENT DEFINITION
AMBIGUOUS REQUIREMENT AMBIGUOUS REQUIREMENT AMBIGUOUS REQUIREMENT AMBIGUOUS REQUIREMENT AMBIGUOUS REQUIREMENT AMBIGUOUS REQUIREMENT AMBIGUOUS REQUIREMENT AMBIGUOUS REQUIREMENT AMBIGUOUS REQUIREMENT AMBIGUOUS REQUIREMENT AMBIGUOUS REQUIREMENT OWNER OWNER OWNER OWNER OWNER OWNER OWNER OWNER OWNER OWNER OWNER
OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY):
ACTION TO BE TAKEN BY: (CHECK ONE ONLY) ACTION TO BE TAKEN BY: (CHECK ONE ONLY) ACTION TO BE TAKEN BY: (CHECK ONE ONLY) ACTION TO BE TAKEN BY: (CHECK ONE ONLY) ACTION TO BE TAKEN BY: (CHECK ONE ONLY) ACTION TO BE TAKEN BY: (CHECK ONE ONLY) ACTION TO BE TAKEN BY: (CHECK ONE ONLY) ACTION TO BE TAKEN BY: (CHECK ONE ONLY) ACTION TO BE TAKEN BY: (CHECK ONE ONLY) ACTION TO BE TAKEN BY: (CHECK ONE ONLY) ACTION TO BE TAKEN BY: (CHECK ONE ONLY) ACTION TO BE TAKEN BY: (CHECK ONE ONLY) ACTION TO BE TAKEN BY: (CHECK ONE ONLY) ACTION TO BE TAKEN BY: (CHECK ONE ONLY) ACTION TO BE TAKEN BY: (CHECK ONE ONLY) ACTION TO BE TAKEN BY: (CHECK ONE ONLY) ACTION TO BE TAKEN BY: (CHECK ONE ONLY) ACTION TO BE TAKEN BY: (CHECK ONE ONLY) ACTION TO BE TAKEN BY: (CHECK ONE ONLY) ACTION TO BE TAKEN BY: (CHECK ONE ONLY) ACTION TO BE TAKEN BY: (CHECK ONE ONLY) ACTION TO BE TAKEN BY: (CHECK ONE ONLY) ACTION TO BE TAKEN BY: (CHECK ONE ONLY)
MANUFACTURER MANUFACTURER MANUFACTURER OWNER OWNER OWNER OTHER OTHER OTHER OTHER OTHER OTHER OTHER OTHER OTHER DATE CORRECTION TO BE COMPLETED: DATE CORRECTION TO BE COMPLETED: DATE CORRECTION TO BE COMPLETED: DATE CORRECTION TO BE COMPLETED: DATE CORRECTION TO BE COMPLETED: DATE CORRECTION TO BE COMPLETED: DATE CORRECTION TO BE COMPLETED: DATE CORRECTION TO BE COMPLETED:
NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT NOTE: IF CORRECTION NOT COMPLETED BY ABOVE DATE, ISSUE NON–CONFORMANCE REPORT
DEFICIENCY IDENTIFIED BY: DEFICIENCY IDENTIFIED BY: DEFICIENCY IDENTIFIED BY: DEFICIENCY IDENTIFIED BY: DEFICIENCY IDENTIFIED BY: DEFICIENCY IDENTIFIED BY: DEFICIENCY IDENTIFIED BY: DEFICIENCY IDENTIFIED BY: DATE: DATE: DATE: DATE: ACKNOWLEDGED BY: ACKNOWLEDGED BY: ACKNOWLEDGED BY: ACKNOWLEDGED BY: ACKNOWLEDGED BY: ACKNOWLEDGED BY: ACKNOWLEDGED BY: ACKNOWLEDGED BY: DATE: DATE: DATE:
ACTION TAKEN TO CORRECT DEFICIENCY: ACTION TAKEN TO CORRECT DEFICIENCY: ACTION TAKEN TO CORRECT DEFICIENCY: ACTION TAKEN TO CORRECT DEFICIENCY: ACTION TAKEN TO CORRECT DEFICIENCY: ACTION TAKEN TO CORRECT DEFICIENCY: ACTION TAKEN TO CORRECT DEFICIENCY: ACTION TAKEN TO CORRECT DEFICIENCY: ACTION TAKEN TO CORRECT DEFICIENCY: ACTION TAKEN TO CORRECT DEFICIENCY: ACTION TAKEN TO CORRECT DEFICIENCY: ACTION TAKEN TO CORRECT DEFICIENCY: ACTION TAKEN TO CORRECT DEFICIENCY: ACTION TAKEN TO CORRECT DEFICIENCY: ACTION TAKEN TO CORRECT DEFICIENCY: ACTION TAKEN TO CORRECT DEFICIENCY: ACTION TAKEN TO CORRECT DEFICIENCY: ACTION TAKEN TO CORRECT DEFICIENCY: ACTION TAKEN TO CORRECT DEFICIENCY: ACTION TAKEN TO CORRECT DEFICIENCY: ACTION TAKEN TO CORRECT DEFICIENCY: ACTION TAKEN TO CORRECT DEFICIENCY: ACTION TAKEN TO CORRECT DEFICIENCY:
DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO DEFICIENCY CLEARED BY: DATE: COPY GIVEN TO MANUFACTURER: YES NO

FORM 5- NONCONFORMANCE REPORT

NONCONFORMANCE REPORT NONCONFORMANCE REPORT NONCONFORMANCE REPORT NONCONFORMANCE REPORT NONCONFORMANCE REPORT NONCONFORMANCE REPORT NONCONFORMANCE REPORT NONCONFORMANCE REPORT NONCONFORMANCE REPORT NONCONFORMANCE REPORT
PLANT INFORMATION PLANT INFORMATION PLANT INFORMATION PLANT INFORMATION PLANT INFORMATION PLANT INFORMATION PLANT INFORMATION PLANT INFORMATION FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT MANUFACTURER'S INFORMATION MANUFACTURER'S INFORMATION MANUFACTURER'S INFORMATION MANUFACTURER'S INFORMATION
PLANT LOC.: PLANT LOC.: PLANT LOC.: PLANT LOC.: PLANT LOC.: PLANT LOC.: PLANT LOC.: PLANT LOC.: INSP. NAME: INSP. NAME: INSP. NAME: INSP. NAME: INSP. NAME: INSP. NAME: INSP. NAME: INSP. NAME: INSP. NAME: MFGR. NAME: MFGR. NAME: MFGR. NAME: MFGR. NAME:
PROJECT: PROJECT: PROJECT: PROJECT: PROJECT: PROJECT: PROJECT: PROJECT: INSP. COMPANY: INSP. COMPANY: INSP. COMPANY: INSP. COMPANY: INSP. COMPANY: INSP. COMPANY: INSP. COMPANY: INSP. COMPANY: INSP. COMPANY: ADDRESS: ADDRESS: ADDRESS: ADDRESS:
PROJ. ENG.: PROJ. ENG.: PROJ. ENG.: PROJ. ENG.: PROJ. ENG.: PROJ. ENG.: PROJ. ENG.: PROJ. ENG.: INSP. P.O.: INSP. P.O.: INSP. P.O.: INSP. P.O.: INSP. P.O.: INSP. P.O.: INSP. P.O.: INSP. P.O.: INSP. P.O.: EQUIP. DESCR.: EQUIP. DESCR.: EQUIP. DESCR.: EQUIP. DESCR.:
INSP. AUTH.: INSP. AUTH.: INSP. AUTH.: INSP. AUTH.: INSP. AUTH.: INSP. AUTH.: INSP. AUTH.: INSP. AUTH.: INSP. SIGNATURE: INSP. SIGNATURE: INSP. SIGNATURE: INSP. SIGNATURE: INSP. SIGNATURE: INSP. SIGNATURE: INSP. SIGNATURE: INSP. SIGNATURE: INSP. SIGNATURE: TAG NO.: TAG NO.: TAG NO.: TAG NO.:
P.O. NO.: P.O. NO.: P.O. NO.: P.O. NO.: P.O. NO.: P.O. NO.: P.O. NO.: P.O. NO.: DATE: DATE: DATE: DATE: DATE: DATE: DATE: DATE: DATE: ITEM NO.: ITEM NO.: ITEM NO.: ITEM NO.:
PRIME SUBCONTRACTOR PRIME SUBCONTRACTOR PRIME SUBCONTRACTOR PRIME SUBCONTRACTOR
NONCONFORMANCE REPORT NO: NONCONFORMANCE REPORT NO: NONCONFORMANCE REPORT NO: NONCONFORMANCE REPORT NO: NONCONFORMANCE REPORT NO: NONCONFORMANCE REPORT NO: NONCONFORMANCE REPORT NO: NONCONFORMANCE REPORT NO: (FIRST NOTICE FOR THIS ORDER
= 01)
(FIRST NOTICE FOR THIS ORDER
= 01)
(FIRST NOTICE FOR THIS ORDER
= 01)
(FIRST NOTICE FOR THIS ORDER
= 01)
(FIRST NOTICE FOR THIS ORDER
= 01)
(FIRST NOTICE FOR THIS ORDER
= 01)
(FIRST NOTICE FOR THIS ORDER
= 01)
(FIRST NOTICE FOR THIS ORDER
= 01)
(FIRST NOTICE FOR THIS ORDER
= 01)
STATUS OPEN CLOSED STATUS OPEN CLOSED STATUS OPEN CLOSED STATUS OPEN CLOSED
DESCRIPTION OF NONCONFORMANCE: DESCRIPTION OF NONCONFORMANCE: DESCRIPTION OF NONCONFORMANCE: DESCRIPTION OF NONCONFORMANCE: DESCRIPTION OF NONCONFORMANCE: DESCRIPTION OF NONCONFORMANCE: DESCRIPTION OF NONCONFORMANCE: DESCRIPTION OF NONCONFORMANCE: DESCRIPTION OF NONCONFORMANCE: DESCRIPTION OF NONCONFORMANCE: DESCRIPTION OF NONCONFORMANCE: DESCRIPTION OF NONCONFORMANCE: DESCRIPTION OF NONCONFORMANCE: DESCRIPTION OF NONCONFORMANCE: DESCRIPTION OF NONCONFORMANCE: DESCRIPTION OF NONCONFORMANCE: DESCRIPTION OF NONCONFORMANCE: DESCRIPTION OF NONCONFORMANCE: DESCRIPTION OF NONCONFORMANCE: DESCRIPTION OF NONCONFORMANCE: DESCRIPTION OF NONCONFORMANCE:
CATEGORY: CATEGORY: PROCEDURAL PROCEDURAL PROCEDURAL PROCEDURAL QUANTITY QUANTITY QUANTITY NDE NDE NDE NDE TESTING TESTING WELDING WELDING WELDING WORKMANSHIP WORKMANSHIP DESIGN
DOCUMENTATION DOCUMENTATION DOCUMENTATION DOCUMENTATION MATERIAL MATERIAL MATERIAL DIMENSIONAL DIMENSIONAL DIMENSIONAL PACKAGING PACKAGING PACKAGING PACKAGING SPECIFICATION/DATA SHEET SPECIFICATION/DATA SHEET SPECIFICATION/DATA SHEET SPECIFICATION/DATA SHEET SPECIFICATION/DATA SHEET NOTIFICATION NOTIFICATION
OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY):
ROOT CAUSE: MANUFACTURER SYSTEM FAILURE MANUFACTURER SYSTEM FAILURE MANUFACTURER SYSTEM FAILURE MANUFACTURER SYSTEM FAILURE MANUFACTURER SYSTEM FAILURE MANUFACTURER SYSTEM FAILURE MANUFACTURER SYSTEM FAILURE MANUFACTURER QC FAILURE MANUFACTURER QC FAILURE MANUFACTURER QC FAILURE MANUFACTURER QC FAILURE MANUFACTURER QC FAILURE MANUFACTURER QC FAILURE MANUFACTURER QC FAILURE MANUFACTURER QC FAILURE MANUFACTURER QC FAILURE REQUIREMENT DEFINITION REQUIREMENT DEFINITION REQUIREMENT DEFINITION REQUIREMENT DEFINITION
AMBIGUOUS REQUIREMENT AMBIGUOUS REQUIREMENT AMBIGUOUS REQUIREMENT AMBIGUOUS REQUIREMENT AMBIGUOUS REQUIREMENT AMBIGUOUS REQUIREMENT AMBIGUOUS REQUIREMENT AMBIGUOUS REQUIREMENT AMBIGUOUS REQUIREMENT CUSTOMER CUSTOMER CUSTOMER CUSTOMER CUSTOMER CUSTOMER CUSTOMER CUSTOMER CUSTOMER CUSTOMER CUSTOMER
OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY): OTHERS (SPECIFY):
NCR ISSUED BY: NCR ISSUED BY: NCR ISSUED BY: DATE: DATE: DATE: DATE: DATE: DATE: DATE: DATE: DATE: DATE: DATE: DATE: DATE: DATE: DATE: DATE: DATE: DATE:
RECOMMENDED DISPOSTION: RECOMMENDED DISPOSTION: RECOMMENDED DISPOSTION: RECOMMENDED DISPOSTION: RECOMMENDED DISPOSTION: RECOMMENDED DISPOSTION: RECOMMENDED DISPOSTION: RECOMMENDED DISPOSTION: RECOMMENDED DISPOSTION: RECOMMENDED DISPOSTION: RECOMMENDED DISPOSTION: RECOMMENDED DISPOSTION: RECOMMENDED DISPOSTION: RECOMMENDED DISPOSTION: RECOMMENDED DISPOSTION: RECOMMENDED DISPOSTION: RECOMMENDED DISPOSTION: RECOMMENDED DISPOSTION: RECOMMENDED DISPOSTION: RECOMMENDED DISPOSTION: RECOMMENDED DISPOSTION:
AUTHORIZED DISPOSTION: AUTHORIZED DISPOSTION: AUTHORIZED DISPOSTION: AUTHORIZED DISPOSTION: AUTHORIZED DISPOSTION: AUTHORIZED DISPOSTION: AUTHORIZED DISPOSTION: AUTHORIZED DISPOSTION: AUTHORIZED DISPOSTION: AUTHORIZED DISPOSTION: AUTHORIZED DISPOSTION: AUTHORIZED DISPOSTION: AUTHORIZED DISPOSTION: AUTHORIZED DISPOSTION: AUTHORIZED DISPOSTION: AUTHORIZED DISPOSTION: AUTHORIZED DISPOSTION: AUTHORIZED DISPOSTION: AUTHORIZED DISPOSTION: AUTHORIZED DISPOSTION: AUTHORIZED DISPOSTION:
DISPOSITION AUTHORIZED
BY:
DISPOSITION AUTHORIZED
BY:
DISPOSITION AUTHORIZED
BY:
DISPOSITION AUTHORIZED
BY:
DISPOSITION AUTHORIZED
BY:
DATE: DATE: DATE: DATE: DATE: DATE: INSPECTOR: INSPECTOR: INSPECTOR: INSPECTOR: INSPECTOR: DATE: DATE: DATE: DATE: DATE:
PROJECT ENGINEER: PROJECT ENGINEER: PROJECT ENGINEER: PROJECT ENGINEER: PROJECT ENGINEER: DATE: DATE: DATE: DATE: DATE: DATE: OTHER: OTHER: OTHER: OTHER: OTHER: DATE: DATE: DATE: DATE: DATE:
DESCRIPTION OF CORRECTIVE ACTION TAKEN: DESCRIPTION OF CORRECTIVE ACTION TAKEN: DESCRIPTION OF CORRECTIVE ACTION TAKEN: DESCRIPTION OF CORRECTIVE ACTION TAKEN: DESCRIPTION OF CORRECTIVE ACTION TAKEN: DESCRIPTION OF CORRECTIVE ACTION TAKEN: DESCRIPTION OF CORRECTIVE ACTION TAKEN: DESCRIPTION OF CORRECTIVE ACTION TAKEN: DESCRIPTION OF CORRECTIVE ACTION TAKEN: DESCRIPTION OF CORRECTIVE ACTION TAKEN: DESCRIPTION OF CORRECTIVE ACTION TAKEN: DESCRIPTION OF CORRECTIVE ACTION TAKEN: DESCRIPTION OF CORRECTIVE ACTION TAKEN: DESCRIPTION OF CORRECTIVE ACTION TAKEN: DESCRIPTION OF CORRECTIVE ACTION TAKEN: DESCRIPTION OF CORRECTIVE ACTION TAKEN: DESCRIPTION OF CORRECTIVE ACTION TAKEN: DESCRIPTION OF CORRECTIVE ACTION TAKEN: DESCRIPTION OF CORRECTIVE ACTION TAKEN: DESCRIPTION OF CORRECTIVE ACTION TAKEN: DESCRIPTION OF CORRECTIVE ACTION TAKEN:
DISPOSTION APPROVED: DISPOSTION APPROVED: DISPOSTION APPROVED: DISPOSTION APPROVED: DISPOSTION APPROVED: DISPOSTION APPROVED: DISPOSTION APPROVED: DISPOSTION APPROVED: DISPOSTION APPROVED: DISPOSTION APPROVED: DISPOSTION APPROVED: DISPOSTION APPROVED: DATE: DATE: DATE: DATE: DATE: DATE: DATE: DATE: DATE:
ASSIGNED INSPECTOR ASSIGNED INSPECTOR ASSIGNED INSPECTOR ASSIGNED INSPECTOR ASSIGNED INSPECTOR ASSIGNED INSPECTOR ASSIGNED INSPECTOR ASSIGNED INSPECTOR ASSIGNED INSPECTOR ASSIGNED INSPECTOR ASSIGNED INSPECTOR ASSIGNED INSPECTOR ASSIGNED INSPECTOR ASSIGNED INSPECTOR ASSIGNED INSPECTOR ASSIGNED INSPECTOR ASSIGNED INSPECTOR ASSIGNED INSPECTOR ASSIGNED INSPECTOR ASSIGNED INSPECTOR ASSIGNED INSPECTOR
REMARKS REMARKS REMARKS REMARKS REMARKS REMARKS REMARKS REMARKS REMARKS REMARKS REMARKS REMARKS REMARKS REMARKS REMARKS REMARKS REMARKS REMARKS REMARKS REMARKS REMARKS

FORM 6 - FINAL INSPECTION RELEASE

FINAL INSPECTION RELEASE FINAL INSPECTION RELEASE FINAL INSPECTION RELEASE FINAL INSPECTION RELEASE
PLANT INFORMATION PLANT INFORMATION PLANT INFORMATION FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT MANUFACTURER'S INFORMATION MANUFACTURER'S INFORMATION
PLANT LOC.: PLANT LOC.: PLANT LOC.: INSP. NAME: INSP. NAME: INSP. NAME: MFGR. NAME: MFGR. NAME:
PROJECT: PROJECT: PROJECT: INSP. COMPANY: INSP. COMPANY: INSP. COMPANY: ADDRESS: ADDRESS:
PROJ. ENG.: PROJ. ENG.: PROJ. ENG.: INSP. P.O.: INSP. P.O.: INSP. P.O.: EQUIP. DESCR.: EQUIP. DESCR.:
INSP. AUTH.: INSP. AUTH.: INSP. AUTH.: INSP. SIGNATURE: INSP. SIGNATURE: INSP. SIGNATURE: TAG NO.: TAG NO.:
P.O. NO.: P.O. NO.: P.O. NO.: DATE: DATE: DATE: ITEM NO.: ITEM NO.:
PRIME SASUBCONTRACTOR PRIME SASUBCONTRACTOR
THIS FINAL INSPECTION RELEASE PROVIDES DOCUMETNATION THAT THE PURCHASE ORDER REQUIREMENTS FOR VERIFICATION OF PRODUCT THE ITEMS INDICATED BELOW. THIS FINAL INSPECTION RELEASE PROVIDES DOCUMETNATION THAT THE PURCHASE ORDER REQUIREMENTS FOR VERIFICATION OF PRODUCT THE ITEMS INDICATED BELOW. THIS FINAL INSPECTION RELEASE PROVIDES DOCUMETNATION THAT THE PURCHASE ORDER REQUIREMENTS FOR VERIFICATION OF PRODUCT THE ITEMS INDICATED BELOW. THIS FINAL INSPECTION RELEASE PROVIDES DOCUMETNATION THAT THE PURCHASE ORDER REQUIREMENTS FOR VERIFICATION OF PRODUCT THE ITEMS INDICATED BELOW. THIS FINAL INSPECTION RELEASE PROVIDES DOCUMETNATION THAT THE PURCHASE ORDER REQUIREMENTS FOR VERIFICATION OF PRODUCT THE ITEMS INDICATED BELOW. THIS FINAL INSPECTION RELEASE PROVIDES DOCUMETNATION THAT THE PURCHASE ORDER REQUIREMENTS FOR VERIFICATION OF PRODUCT THE ITEMS INDICATED BELOW. THIS FINAL INSPECTION RELEASE PROVIDES DOCUMETNATION THAT THE PURCHASE ORDER REQUIREMENTS FOR VERIFICATION OF PRODUCT THE ITEMS INDICATED BELOW. THIS FINAL INSPECTION RELEASE PROVIDES DOCUMETNATION THAT THE PURCHASE ORDER REQUIREMENTS FOR VERIFICATION OF PRODUCT THE ITEMS INDICATED BELOW.
MANUFACTURER'S CONTACT: MANUFACTURER'S CONTACT: MANUFACTURER'S CONTACT: SHIPPING LOCATION: SHIPPING LOCATION: SHIPPING LOCATION: SHIPPING LOCATION: SHIPPING LOCATION:
PURCHASE ORDER ITEMS RELEASED PURCHASE ORDER ITEMS RELEASED PURCHASE ORDER ITEMS RELEASED PURCHASE ORDER ITEMS RELEASED PURCHASE ORDER ITEMS RELEASED PURCHASE ORDER ITEMS RELEASED PURCHASE ORDER ITEMS RELEASED PURCHASE ORDER ITEMS RELEASED
ITEM NO. TAG/PART NO OR DESCRIPTION ITEM NO. ITEM NO. TAG/PART NO. OR DESCRIPTION ITEM NO. ITEM NO. TAG/PART NO. OR DESCRIPTION
REMARKS: REMARKS: REMARKS: REMARKS: REMARKS: REMARKS: REMARKS: REMARKS:
FURTHER INSPECTION VISIT INTENDED? YES NO REMARKS: FURTHER INSPECTION VISIT INTENDED? YES NO REMARKS: FURTHER INSPECTION VISIT INTENDED? YES NO REMARKS: FURTHER INSPECTION VISIT INTENDED? YES NO REMARKS: FURTHER INSPECTION VISIT INTENDED? YES NO REMARKS: FURTHER INSPECTION VISIT INTENDED? YES NO REMARKS: FURTHER INSPECTION VISIT INTENDED? YES NO REMARKS: FURTHER INSPECTION VISIT INTENDED? YES NO REMARKS:
MAIN/SUB ORDER COMPLETE? YES NO REMARKS: MAIN/SUB ORDER COMPLETE? YES NO REMARKS: MAIN/SUB ORDER COMPLETE? YES NO REMARKS: MAIN/SUB ORDER COMPLETE? YES NO REMARKS: MAIN/SUB ORDER COMPLETE? YES NO REMARKS: MAIN/SUB ORDER COMPLETE? YES NO REMARKS: MAIN/SUB ORDER COMPLETE? YES NO REMARKS: MAIN/SUB ORDER COMPLETE? YES NO REMARKS:
MATERIAL READY FOR SHIPMENT? YES NO REMARKS: MATERIAL READY FOR SHIPMENT? YES NO REMARKS: MATERIAL READY FOR SHIPMENT? YES NO REMARKS: MATERIAL READY FOR SHIPMENT? YES NO REMARKS: MATERIAL READY FOR SHIPMENT? YES NO REMARKS: MATERIAL READY FOR SHIPMENT? YES NO REMARKS: MATERIAL READY FOR SHIPMENT? YES NO REMARKS: MATERIAL READY FOR SHIPMENT? YES NO REMARKS:

FORM 7 - VARIANCE REQUEST

VARIANCE REQUEST VARIANCE REQUEST VARIANCE REQUEST
PLANT INFORMATION PLANT INFORMATION FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT MANUFACTURER'S INFORMATION MANUFACTURER'S INFORMATION
PLANT LOC.: PLANT LOC.: INSP. NAME: INSP. NAME: INSP. NAME: INSP. NAME: MFGR. NAME: MFGR. NAME:
PROJECT: PROJECT: INSP. COMPANY: INSP. COMPANY: INSP. COMPANY: INSP. COMPANY: ADDRESS: ADDRESS:
PROJ. ENG.: PROJ. ENG.: INSP. P.O.: INSP. P.O.: INSP. P.O.: INSP. P.O.: EQUIP. DESCR.: EQUIP. DESCR.:
INSP. AUTH.: INSP. AUTH.: INSP. SIGNATURE: INSP. SIGNATURE: INSP. SIGNATURE: INSP. SIGNATURE: TAG NO.: TAG NO.:
P.O. NO.: P.O. NO.: DATE: DATE: DATE: DATE: ITEM NO.: ITEM NO.:
PRIME SUBCONTRACTOR PRIME SUBCONTRACTOR
SECTIONS 1,2, AND 3 TO BE COMPLETED BY MANUFACTURER REQUESTING VARIANCE SECTIONS 1,2, AND 3 TO BE COMPLETED BY MANUFACTURER REQUESTING VARIANCE SECTIONS 1,2, AND 3 TO BE COMPLETED BY MANUFACTURER REQUESTING VARIANCE SECTIONS 1,2, AND 3 TO BE COMPLETED BY MANUFACTURER REQUESTING VARIANCE SECTIONS 1,2, AND 3 TO BE COMPLETED BY MANUFACTURER REQUESTING VARIANCE SECTIONS 1,2, AND 3 TO BE COMPLETED BY MANUFACTURER REQUESTING VARIANCE SECTIONS 1,2, AND 3 TO BE COMPLETED BY MANUFACTURER REQUESTING VARIANCE SECTIONS 1,2, AND 3 TO BE COMPLETED BY MANUFACTURER REQUESTING VARIANCE
SECTION 1 SECTION 1 SECTION 1 SECTION 1 SECTION 1 SECTION 1 SECTION 1 SECTION 1
VARIANCE NO.:
(START WITH 01)
AFFECTING DRAWING NO.: AFFECTING DRAWING NO.: AFFECTING DRAWING NO.: DWG. REV. NO.: DWG. REV. NO.: DWG. REV. NO.:
AFFECTED ENGINEERING PRACTICE NO.: AFFECTED ENGINEERING PRACTICE NO.: AFFECTED ENGINEERING PRACTICE NO.: REV. NO.: REV. NO.: REV. NO.: PARA. NO.:
MANUFACTURER'S REPRESENTATIVE REQUESTING VARIANCE: MANUFACTURER'S REPRESENTATIVE REQUESTING VARIANCE: MANUFACTURER'S REPRESENTATIVE REQUESTING VARIANCE: MANUFACTURER'S REPRESENTATIVE REQUESTING VARIANCE: MANUFACTURER'S REPRESENTATIVE REQUESTING VARIANCE: POSITION: POSITION: POSITION:
SECTION 2 SECTION 2 SECTION 2 SECTION 2 SECTION 2 SECTION 2 SECTION 2 SECTION 2
DESCRIPTION OF VARIANCE: DESCRIPTION OF VARIANCE: DESCRIPTION OF VARIANCE: DESCRIPTION OF VARIANCE: DESCRIPTION OF VARIANCE: DESCRIPTION OF VARIANCE: DESCRIPTION OF VARIANCE: DESCRIPTION OF VARIANCE:
REASON FOR VARIANCE: REASON FOR VARIANCE: REASON FOR VARIANCE: REASON FOR VARIANCE: REASON FOR VARIANCE: REASON FOR VARIANCE: REASON FOR VARIANCE: REASON FOR VARIANCE:
SECTION 3 SECTION 3 SECTION 3 SECTION 3 SECTION 3 SECTION 3 SECTION 3 SECTION 3
P.O. ITEMS AND QUANTITIES AFFECTED BY VARIANCE: P.O. ITEMS AND QUANTITIES AFFECTED BY VARIANCE: P.O. ITEMS AND QUANTITIES AFFECTED BY VARIANCE: P.O. ITEMS AND QUANTITIES AFFECTED BY VARIANCE: P.O. ITEMS AND QUANTITIES AFFECTED BY VARIANCE: P.O. ITEMS AND QUANTITIES AFFECTED BY VARIANCE: P.O. ITEMS AND QUANTITIES AFFECTED BY VARIANCE: P.O. ITEMS AND QUANTITIES AFFECTED BY VARIANCE:
DOLLAR VALUE OF VARIANCE: NO CHANGE DEDUCT:$ OR ADD $ ORIGINAL VALUE OF P.O.
$
DOLLAR VALUE OF VARIANCE: NO CHANGE DEDUCT:$ OR ADD $ ORIGINAL VALUE OF P.O.
$
DOLLAR VALUE OF VARIANCE: NO CHANGE DEDUCT:$ OR ADD $ ORIGINAL VALUE OF P.O.
$
DOLLAR VALUE OF VARIANCE: NO CHANGE DEDUCT:$ OR ADD $ ORIGINAL VALUE OF P.O.
$
DOLLAR VALUE OF VARIANCE: NO CHANGE DEDUCT:$ OR ADD $ ORIGINAL VALUE OF P.O.
$
DOLLAR VALUE OF VARIANCE: NO CHANGE DEDUCT:$ OR ADD $ ORIGINAL VALUE OF P.O.
$
DOLLAR VALUE OF VARIANCE: NO CHANGE DEDUCT:$ OR ADD $ ORIGINAL VALUE OF P.O.
$
DOLLAR VALUE OF VARIANCE: NO CHANGE DEDUCT:$ OR ADD $ ORIGINAL VALUE OF P.O.
$
EFFECT ON SCHEDULE: NO CHANGE; DELAY: DAYS IMPROVE DAYS; ORIGINAL SHIPPING DATE: EFFECT ON SCHEDULE: NO CHANGE; DELAY: DAYS IMPROVE DAYS; ORIGINAL SHIPPING DATE: EFFECT ON SCHEDULE: NO CHANGE; DELAY: DAYS IMPROVE DAYS; ORIGINAL SHIPPING DATE: EFFECT ON SCHEDULE: NO CHANGE; DELAY: DAYS IMPROVE DAYS; ORIGINAL SHIPPING DATE: EFFECT ON SCHEDULE: NO CHANGE; DELAY: DAYS IMPROVE DAYS; ORIGINAL SHIPPING DATE: EFFECT ON SCHEDULE: NO CHANGE; DELAY: DAYS IMPROVE DAYS; ORIGINAL SHIPPING DATE: EFFECT ON SCHEDULE: NO CHANGE; DELAY: DAYS IMPROVE DAYS; ORIGINAL SHIPPING DATE: EFFECT ON SCHEDULE: NO CHANGE; DELAY: DAYS IMPROVE DAYS; ORIGINAL SHIPPING DATE:
THE FOLLOWING SECTIONS TO BE COMPLETED BY IPE. REPRESENTATIVES THE FOLLOWING SECTIONS TO BE COMPLETED BY IPE. REPRESENTATIVES THE FOLLOWING SECTIONS TO BE COMPLETED BY IPE. REPRESENTATIVES THE FOLLOWING SECTIONS TO BE COMPLETED BY IPE. REPRESENTATIVES THE FOLLOWING SECTIONS TO BE COMPLETED BY IPE. REPRESENTATIVES THE FOLLOWING SECTIONS TO BE COMPLETED BY IPE. REPRESENTATIVES THE FOLLOWING SECTIONS TO BE COMPLETED BY IPE. REPRESENTATIVES THE FOLLOWING SECTIONS TO BE COMPLETED BY IPE. REPRESENTATIVES
SECTION 4 SECTION 4 SECTION 4 SECTION 4 SECTION 4 SECTION 4 SECTION 4 SECTION 4
TECHNICAL EVALUATION OF VARIANCE REQUEST: TECHNICAL EVALUATION OF VARIANCE REQUEST: TECHNICAL EVALUATION OF VARIANCE REQUEST: TECHNICAL EVALUATION OF VARIANCE REQUEST: TECHNICAL EVALUATION OF VARIANCE REQUEST: TECHNICAL EVALUATION OF VARIANCE REQUEST: TECHNICAL EVALUATION OF VARIANCE REQUEST: TECHNICAL EVALUATION OF VARIANCE REQUEST:
REQUEST DOES, DOES NOT REQUIRE TECHNICAL EVALUATION POSITION: REQUEST DOES, DOES NOT REQUIRE TECHNICAL EVALUATION POSITION: REQUEST DOES, DOES NOT REQUIRE TECHNICAL EVALUATION POSITION: REQUEST DOES, DOES NOT REQUIRE TECHNICAL EVALUATION POSITION: REQUEST DOES, DOES NOT REQUIRE TECHNICAL EVALUATION POSITION: REQUEST DOES, DOES NOT REQUIRE TECHNICAL EVALUATION POSITION: REQUEST DOES, DOES NOT REQUIRE TECHNICAL EVALUATION POSITION: REQUEST DOES, DOES NOT REQUIRE TECHNICAL EVALUATION POSITION:
(IPE ENGINEER PERFORMING EVALUATION) (IPE ENGINEER PERFORMING EVALUATION) (IPE ENGINEER PERFORMING EVALUATION) (IPE ENGINEER PERFORMING EVALUATION) (IPE ENGINEER PERFORMING EVALUATION) (IPE ENGINEER PERFORMING EVALUATION) (IPE ENGINEER PERFORMING EVALUATION) (IPE ENGINEER PERFORMING EVALUATION)
IF TECHNICAL EVALUATION REQUIRED, IS TECHNICAL BASIS FOR VARIANCE REQUEST JUSTIFIED? YES NO IF TECHNICAL EVALUATION REQUIRED, IS TECHNICAL BASIS FOR VARIANCE REQUEST JUSTIFIED? YES NO IF TECHNICAL EVALUATION REQUIRED, IS TECHNICAL BASIS FOR VARIANCE REQUEST JUSTIFIED? YES NO IF TECHNICAL EVALUATION REQUIRED, IS TECHNICAL BASIS FOR VARIANCE REQUEST JUSTIFIED? YES NO IF TECHNICAL EVALUATION REQUIRED, IS TECHNICAL BASIS FOR VARIANCE REQUEST JUSTIFIED? YES NO IF TECHNICAL EVALUATION REQUIRED, IS TECHNICAL BASIS FOR VARIANCE REQUEST JUSTIFIED? YES NO IF TECHNICAL EVALUATION REQUIRED, IS TECHNICAL BASIS FOR VARIANCE REQUEST JUSTIFIED? YES NO IF TECHNICAL EVALUATION REQUIRED, IS TECHNICAL BASIS FOR VARIANCE REQUEST JUSTIFIED? YES NO
REASON(S): REASON(S): REASON(S): REASON(S): REASON(S): REASON(S): REASON(S): REASON(S):
EP DEVIATION REQUIRED? YES NO; IF YES, LIST EP REFERENCES AFFECTED: EP DEVIATION REQUIRED? YES NO; IF YES, LIST EP REFERENCES AFFECTED: EP DEVIATION REQUIRED? YES NO; IF YES, LIST EP REFERENCES AFFECTED: EP DEVIATION REQUIRED? YES NO; IF YES, LIST EP REFERENCES AFFECTED: EP DEVIATION REQUIRED? YES NO; IF YES, LIST EP REFERENCES AFFECTED: EP DEVIATION REQUIRED? YES NO; IF YES, LIST EP REFERENCES AFFECTED: EP DEVIATION REQUIRED? YES NO; IF YES, LIST EP REFERENCES AFFECTED: EP DEVIATION REQUIRED? YES NO; IF YES, LIST EP REFERENCES AFFECTED:
SECTION 5 SECTION 5 SECTION 5 SECTION 5 SECTION 5 SECTION 5 SECTION 5 SECTION 5
THIS REQUEST IS: ACCEPTED DENIED OTHER: THIS REQUEST IS: ACCEPTED DENIED OTHER: THIS REQUEST IS: ACCEPTED DENIED OTHER: THIS REQUEST IS: ACCEPTED DENIED OTHER: THIS REQUEST IS: ACCEPTED DENIED OTHER: THIS REQUEST IS: ACCEPTED DENIED OTHER: THIS REQUEST IS: ACCEPTED DENIED OTHER: THIS REQUEST IS: ACCEPTED DENIED OTHER:
EP REPRESENTATIVE AUTHORIZING DECISION: POSITION: DATE: EP REPRESENTATIVE AUTHORIZING DECISION: POSITION: DATE: EP REPRESENTATIVE AUTHORIZING DECISION: POSITION: DATE: EP REPRESENTATIVE AUTHORIZING DECISION: POSITION: DATE: EP REPRESENTATIVE AUTHORIZING DECISION: POSITION: DATE: EP REPRESENTATIVE AUTHORIZING DECISION: POSITION: DATE: EP REPRESENTATIVE AUTHORIZING DECISION: POSITION: DATE: EP REPRESENTATIVE AUTHORIZING DECISION: POSITION: DATE:

8 - MANUFACTURER CLOSE OUT EVALUATION

MANUFACTURER CLOSE OUT EVALUATION MANUFACTURER CLOSE OUT EVALUATION MANUFACTURER CLOSE OUT EVALUATION
PLANT INFORMATION PLANT INFORMATION FIELD INSPECTION REPORT FIELD INSPECTION REPORT MANUFACTURER'S INFORMATION
PLANT LOC.: PLANT LOC.: INSP. NAME: INSP. NAME: MFGR. NAME:
PROJECT: PROJECT: INSP. COMPANY: INSP. COMPANY: ADDRESS:
PROJ. ENG.: PROJ. ENG.: INSP. P.O.: INSP. P.O.: EQUIP. DESCR.:
INSP. AUTH.: INSP. AUTH.: INSP. SIGNATURE: INSP. SIGNATURE: TAG NO.:
P.O. NO.: P.O. NO.: DATE: DATE: ITEM NO.:
PRIME SUBCONTRACTOR
EACH OF THE FOLLOWING CONDITIONS IS TO BE EVALUATED AND SCORED AT THE CLOSE OF THE FIELD INSPECTION ASSIGNMENT BY THE ASSIGNED INSPECTOR WHO CLOSES THE ASSIGNMENT. IFTHE ASSIGNMENT WAS TRANSFERRED AFTER MOST OF THE INSPECTION WAS COMPLETED, THE INSPECTOR WHO CLOSES THE ASSIGNMENT MUST COMPLETE THIS EVALUATION AND SUBMIT TO THE MANAGER OF THE CONTRACTED INSPECTION ORGANIZATION WITH NOTATION STATING THE NAME OF THE INSPECTOR WHO PERFORMED THE MAJORITY OF THE INSPECTION. THE MANAGER WILL ASSURE THE ORIGINAL INSPECTOR COMPLETES A SEPARATE EVALUATION REPORT. EACH OF THE FOLLOWING CONDITIONS IS TO BE EVALUATED AND SCORED AT THE CLOSE OF THE FIELD INSPECTION ASSIGNMENT BY THE ASSIGNED INSPECTOR WHO CLOSES THE ASSIGNMENT. IFTHE ASSIGNMENT WAS TRANSFERRED AFTER MOST OF THE INSPECTION WAS COMPLETED, THE INSPECTOR WHO CLOSES THE ASSIGNMENT MUST COMPLETE THIS EVALUATION AND SUBMIT TO THE MANAGER OF THE CONTRACTED INSPECTION ORGANIZATION WITH NOTATION STATING THE NAME OF THE INSPECTOR WHO PERFORMED THE MAJORITY OF THE INSPECTION. THE MANAGER WILL ASSURE THE ORIGINAL INSPECTOR COMPLETES A SEPARATE EVALUATION REPORT. EACH OF THE FOLLOWING CONDITIONS IS TO BE EVALUATED AND SCORED AT THE CLOSE OF THE FIELD INSPECTION ASSIGNMENT BY THE ASSIGNED INSPECTOR WHO CLOSES THE ASSIGNMENT. IFTHE ASSIGNMENT WAS TRANSFERRED AFTER MOST OF THE INSPECTION WAS COMPLETED, THE INSPECTOR WHO CLOSES THE ASSIGNMENT MUST COMPLETE THIS EVALUATION AND SUBMIT TO THE MANAGER OF THE CONTRACTED INSPECTION ORGANIZATION WITH NOTATION STATING THE NAME OF THE INSPECTOR WHO PERFORMED THE MAJORITY OF THE INSPECTION. THE MANAGER WILL ASSURE THE ORIGINAL INSPECTOR COMPLETES A SEPARATE EVALUATION REPORT. EACH OF THE FOLLOWING CONDITIONS IS TO BE EVALUATED AND SCORED AT THE CLOSE OF THE FIELD INSPECTION ASSIGNMENT BY THE ASSIGNED INSPECTOR WHO CLOSES THE ASSIGNMENT. IFTHE ASSIGNMENT WAS TRANSFERRED AFTER MOST OF THE INSPECTION WAS COMPLETED, THE INSPECTOR WHO CLOSES THE ASSIGNMENT MUST COMPLETE THIS EVALUATION AND SUBMIT TO THE MANAGER OF THE CONTRACTED INSPECTION ORGANIZATION WITH NOTATION STATING THE NAME OF THE INSPECTOR WHO PERFORMED THE MAJORITY OF THE INSPECTION. THE MANAGER WILL ASSURE THE ORIGINAL INSPECTOR COMPLETES A SEPARATE EVALUATION REPORT. EACH OF THE FOLLOWING CONDITIONS IS TO BE EVALUATED AND SCORED AT THE CLOSE OF THE FIELD INSPECTION ASSIGNMENT BY THE ASSIGNED INSPECTOR WHO CLOSES THE ASSIGNMENT. IFTHE ASSIGNMENT WAS TRANSFERRED AFTER MOST OF THE INSPECTION WAS COMPLETED, THE INSPECTOR WHO CLOSES THE ASSIGNMENT MUST COMPLETE THIS EVALUATION AND SUBMIT TO THE MANAGER OF THE CONTRACTED INSPECTION ORGANIZATION WITH NOTATION STATING THE NAME OF THE INSPECTOR WHO PERFORMED THE MAJORITY OF THE INSPECTION. THE MANAGER WILL ASSURE THE ORIGINAL INSPECTOR COMPLETES A SEPARATE EVALUATION REPORT.
THE FOLLOWING CONIDITONS ARE SCORED FROM “1” TO “5”. A SCORE OF “1”IS THE LOWEST OR POOREST RATING AND “5" IS EXCELLENT. IF ANY CONDITION DOES NOT APPLY, ENTER A SCORE OF “0”. THIS SCORE WILL NOT COUNT AGAINST THE MANUFACTURER'S FINAL SCORE. IF A MANUFACTURER PERFOMRED AVERAGE WITH NO PROBLEMS, OR SIGNIFICANT NCR'S NOTED, OR DELAYS EXPERIENCED, THEN ENTER A SCORE OF “3". SUPPORT ANY INDIVIDUAL SCORE OF “2" OR LESS OR “4" OR MORE WITH A WRITTEN EXPLANATION. THE FOLLOWING CONIDITONS ARE SCORED FROM “1” TO “5”. A SCORE OF “1”IS THE LOWEST OR POOREST RATING AND “5" IS EXCELLENT. IF ANY CONDITION DOES NOT APPLY, ENTER A SCORE OF “0”. THIS SCORE WILL NOT COUNT AGAINST THE MANUFACTURER'S FINAL SCORE. IF A MANUFACTURER PERFOMRED AVERAGE WITH NO PROBLEMS, OR SIGNIFICANT NCR'S NOTED, OR DELAYS EXPERIENCED, THEN ENTER A SCORE OF “3". SUPPORT ANY INDIVIDUAL SCORE OF “2" OR LESS OR “4" OR MORE WITH A WRITTEN EXPLANATION. THE FOLLOWING CONIDITONS ARE SCORED FROM “1” TO “5”. A SCORE OF “1”IS THE LOWEST OR POOREST RATING AND “5" IS EXCELLENT. IF ANY CONDITION DOES NOT APPLY, ENTER A SCORE OF “0”. THIS SCORE WILL NOT COUNT AGAINST THE MANUFACTURER'S FINAL SCORE. IF A MANUFACTURER PERFOMRED AVERAGE WITH NO PROBLEMS, OR SIGNIFICANT NCR'S NOTED, OR DELAYS EXPERIENCED, THEN ENTER A SCORE OF “3". SUPPORT ANY INDIVIDUAL SCORE OF “2" OR LESS OR “4" OR MORE WITH A WRITTEN EXPLANATION. THE FOLLOWING CONIDITONS ARE SCORED FROM “1” TO “5”. A SCORE OF “1”IS THE LOWEST OR POOREST RATING AND “5" IS EXCELLENT. IF ANY CONDITION DOES NOT APPLY, ENTER A SCORE OF “0”. THIS SCORE WILL NOT COUNT AGAINST THE MANUFACTURER'S FINAL SCORE. IF A MANUFACTURER PERFOMRED AVERAGE WITH NO PROBLEMS, OR SIGNIFICANT NCR'S NOTED, OR DELAYS EXPERIENCED, THEN ENTER A SCORE OF “3". SUPPORT ANY INDIVIDUAL SCORE OF “2" OR LESS OR “4" OR MORE WITH A WRITTEN EXPLANATION. THE FOLLOWING CONIDITONS ARE SCORED FROM “1” TO “5”. A SCORE OF “1”IS THE LOWEST OR POOREST RATING AND “5" IS EXCELLENT. IF ANY CONDITION DOES NOT APPLY, ENTER A SCORE OF “0”. THIS SCORE WILL NOT COUNT AGAINST THE MANUFACTURER'S FINAL SCORE. IF A MANUFACTURER PERFOMRED AVERAGE WITH NO PROBLEMS, OR SIGNIFICANT NCR'S NOTED, OR DELAYS EXPERIENCED, THEN ENTER A SCORE OF “3". SUPPORT ANY INDIVIDUAL SCORE OF “2" OR LESS OR “4" OR MORE WITH A WRITTEN EXPLANATION.
EVALUATION CONDITIONS: EVALUATION CONDITIONS: EVALUATION CONDITIONS: EVALUATION CONDITIONS: EVALUATION CONDITIONS:
SCORE
1. QUALITY SYSTEM MAINTAINED ADEQUATE CONTROL OF MANUFACTURING, INSPECTION AND TESTING. 1. QUALITY SYSTEM MAINTAINED ADEQUATE CONTROL OF MANUFACTURING, INSPECTION AND TESTING. 1. QUALITY SYSTEM MAINTAINED ADEQUATE CONTROL OF MANUFACTURING, INSPECTION AND TESTING. 1. QUALITY SYSTEM MAINTAINED ADEQUATE CONTROL OF MANUFACTURING, INSPECTION AND TESTING.
2. IDENTIFIED QUALITY PROBLEMS AND TOOK POSITIVE CORRECTIVE ACTION. 2. IDENTIFIED QUALITY PROBLEMS AND TOOK POSITIVE CORRECTIVE ACTION. 2. IDENTIFIED QUALITY PROBLEMS AND TOOK POSITIVE CORRECTIVE ACTION. 2. IDENTIFIED QUALITY PROBLEMS AND TOOK POSITIVE CORRECTIVE ACTION.
3. PERSONNEL KNOWLEDGEABLE OF P.O. AND PRACTICE REQUIREMENTS 3. PERSONNEL KNOWLEDGEABLE OF P.O. AND PRACTICE REQUIREMENTS 3. PERSONNEL KNOWLEDGEABLE OF P.O. AND PRACTICE REQUIREMENTS 3. PERSONNEL KNOWLEDGEABLE OF P.O. AND PRACTICE REQUIREMENTS
4. PERSONNEL KNOWLEDGEABLE OF APPLICABLE CODE(S) AND STANDARDS 4. PERSONNEL KNOWLEDGEABLE OF APPLICABLE CODE(S) AND STANDARDS 4. PERSONNEL KNOWLEDGEABLE OF APPLICABLE CODE(S) AND STANDARDS 4. PERSONNEL KNOWLEDGEABLE OF APPLICABLE CODE(S) AND STANDARDS
5. P.O. AND PRACTICE REQUIREMENTS IMPOSED ON SUBCONTRACTORS 5. P.O. AND PRACTICE REQUIREMENTS IMPOSED ON SUBCONTRACTORS 5. P.O. AND PRACTICE REQUIREMENTS IMPOSED ON SUBCONTRACTORS 5. P.O. AND PRACTICE REQUIREMENTS IMPOSED ON SUBCONTRACTORS
6. LEVEL OF CONTROL AND INSPECTION AT SUBCONTRACTOR(S) 6. LEVEL OF CONTROL AND INSPECTION AT SUBCONTRACTOR(S) 6. LEVEL OF CONTROL AND INSPECTION AT SUBCONTRACTOR(S) 6. LEVEL OF CONTROL AND INSPECTION AT SUBCONTRACTOR(S)
7. CONTROL TO ESTABLISHED PROCEDURES INCLUDING WELDING, NDE, AND TESTING 7. CONTROL TO ESTABLISHED PROCEDURES INCLUDING WELDING, NDE, AND TESTING 7. CONTROL TO ESTABLISHED PROCEDURES INCLUDING WELDING, NDE, AND TESTING 7. CONTROL TO ESTABLISHED PROCEDURES INCLUDING WELDING, NDE, AND TESTING
8. CONTROL OF MATERIAL AT RECEIVING, IN-PROCESS AND FINAL INSPECTION (TRACEABILITY, HANDLING, ETC.) 8. CONTROL OF MATERIAL AT RECEIVING, IN-PROCESS AND FINAL INSPECTION (TRACEABILITY, HANDLING, ETC.) 8. CONTROL OF MATERIAL AT RECEIVING, IN-PROCESS AND FINAL INSPECTION (TRACEABILITY, HANDLING, ETC.) 8. CONTROL OF MATERIAL AT RECEIVING, IN-PROCESS AND FINAL INSPECTION (TRACEABILITY, HANDLING, ETC.)
9. EQUIPMENT CALIBRATION MAINTAINED AND CURRENT 9. EQUIPMENT CALIBRATION MAINTAINED AND CURRENT 9. EQUIPMENT CALIBRATION MAINTAINED AND CURRENT 9. EQUIPMENT CALIBRATION MAINTAINED AND CURRENT
10. COMMUNICATION/COORDINATION BETWEEN OFFICE AND SHOP PERSONNEL 10. COMMUNICATION/COORDINATION BETWEEN OFFICE AND SHOP PERSONNEL 10. COMMUNICATION/COORDINATION BETWEEN OFFICE AND SHOP PERSONNEL 10. COMMUNICATION/COORDINATION BETWEEN OFFICE AND SHOP PERSONNEL
11. DRAWING AND DOCUMENT CONTROL INCLUDING REVISION UPDATES 11. DRAWING AND DOCUMENT CONTROL INCLUDING REVISION UPDATES 11. DRAWING AND DOCUMENT CONTROL INCLUDING REVISION UPDATES 11. DRAWING AND DOCUMENT CONTROL INCLUDING REVISION UPDATES
12. PROBLEM SOLVING BY OFFICE AND SHOP PERSONNEL 12. PROBLEM SOLVING BY OFFICE AND SHOP PERSONNEL 12. PROBLEM SOLVING BY OFFICE AND SHOP PERSONNEL 12. PROBLEM SOLVING BY OFFICE AND SHOP PERSONNEL
13. QUALIFICATION AND CERTIFICATION FOR WELDERS AND QC PERSONNEL MAINTAINED AND CURRENT 13. QUALIFICATION AND CERTIFICATION FOR WELDERS AND QC PERSONNEL MAINTAINED AND CURRENT 13. QUALIFICATION AND CERTIFICATION FOR WELDERS AND QC PERSONNEL MAINTAINED AND CURRENT 13. QUALIFICATION AND CERTIFICATION FOR WELDERS AND QC PERSONNEL MAINTAINED AND CURRENT
14. QA/QC GIVEN ADEQUATE AUTHORITY 14. QA/QC GIVEN ADEQUATE AUTHORITY 14. QA/QC GIVEN ADEQUATE AUTHORITY 14. QA/QC GIVEN ADEQUATE AUTHORITY
15. PREFABRICATION MEETING OUTCOME/SUCCESS 15. PREFABRICATION MEETING OUTCOME/SUCCESS 15. PREFABRICATION MEETING OUTCOME/SUCCESS 15. PREFABRICATION MEETING OUTCOME/SUCCESS
16. PROTECTION OF FINISHED EQUIPMENT (FLANGE PROTECTION, PACKAGING, ETC.) 16. PROTECTION OF FINISHED EQUIPMENT (FLANGE PROTECTION, PACKAGING, ETC.) 16. PROTECTION OF FINISHED EQUIPMENT (FLANGE PROTECTION, PACKAGING, ETC.) 16. PROTECTION OF FINISHED EQUIPMENT (FLANGE PROTECTION, PACKAGING, ETC.)
17. CONDITION OF IN-HOUSE TESTING EQUIPMENT 17. CONDITION OF IN-HOUSE TESTING EQUIPMENT 17. CONDITION OF IN-HOUSE TESTING EQUIPMENT 17. CONDITION OF IN-HOUSE TESTING EQUIPMENT
18. MAINTENANCE OF QC DOCUMENTATION AND PRESENTATION OF FINAL PACKAGE 18. MAINTENANCE OF QC DOCUMENTATION AND PRESENTATION OF FINAL PACKAGE 18. MAINTENANCE OF QC DOCUMENTATION AND PRESENTATION OF FINAL PACKAGE 18. MAINTENANCE OF QC DOCUMENTATION AND PRESENTATION OF FINAL PACKAGE
19. AMOUNT OF CONTROL OF MANUFACTURING PROCESS IMPOSED BY MANUFACTURER'S QC ADEQUATE
20. AMOUNT OF REJECTS/NONCOMFORMANCES
21. OVERALL COOPERATION EXHIBITED BY MANUFACTURER'S PERSONNEL
22. OVERALL PERFORMANCE OF PRIME CONTRACTOR'S QC PERSONNEL
23. OVERALL PERFORMANCE OF SUBCONTRACTOR'S QC PERSONNEL
24. OVERALL MANUFACTURER'S PERFORMANCE
25. OTHER FACTORS NOT DISCUSSED ABOVE WHICH IMPACT THIS ORDER:
NO. OF NONCONFORMANCES ISSUED ON THIS ASSIGNMENT: NO. OF DEFICIENCIES ISSUED ON THIS ASSIGNMENT: NO. OF NONCONFORMANCES ISSUED ON THIS ASSIGNMENT: NO. OF DEFICIENCIES ISSUED ON THIS ASSIGNMENT:
REMARKS: REMARKS:
ATTACH ADDITIONAL SHEETS AS NECESSARY ATTACH ADDITIONAL SHEETS AS NECESSARY

FORM 9 - MANUFACTURER INSPECTION DOCUMENTATION SUMMARY FORM

PLANT INFORMATION PLANT INFORMATION PLANT INFORMATION PLANT INFORMATION FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT MANUFACTURER'S INFORMATION MANUFACTURER'S INFORMATION
PLANT LOC.: PLANT LOC.: PLANT LOC.: PLANT LOC.: INSP. NAME: INSP. NAME: INSP. NAME: MFGR. NAME: MFGR. NAME:
PROJECT: PROJECT: PROJECT: PROJECT: INSP. COMPANY: INSP. COMPANY: INSP. COMPANY: ADDRESS: ADDRESS:
PROJ. ENG.: PROJ. ENG.: PROJ. ENG.: PROJ. ENG.: INSP. P.O.: INSP. P.O.: INSP. P.O.: EQUIP. DESCR.: EQUIP. DESCR.:
INSP. AUTH.: INSP. AUTH.: INSP. AUTH.: INSP. AUTH.: INSP. SIGNATURE: INSP. SIGNATURE: INSP. SIGNATURE: TAG NO.: TAG NO.:
P.O. NO.: P.O. NO.: P.O. NO.: P.O. NO.: DATE: DATE: DATE: ITEM NO.: ITEM NO.:
PRIME SUBCONTRACTOR PRIME SUBCONTRACTOR
DATE OF FIRST CONTACT: DATE OF FIRST CONTACT: DATE OF FIRST CONTACT: DATE OF FIRST CONTACT: DATE OF FIRST CONTACT: DATE OF FIRST CONTACT: DATE OF PREFAB. MTG.: DATE OF PREFAB. MTG.: DATE OF PREFAB. MTG.:
DATE OF FINAL INSPECTION: DATE OF FINAL INSPECTION: DATE OF FINAL INSPECTION: DATE OF FINAL INSPECTION: DATE OF FINAL INSPECTION: DATE OF FINAL INSPECTION: DATE OF SHIPMENT: DATE OF SHIPMENT: DATE OF SHIPMENT:
SHOP INSPECTION DOCUMENTATION PACKAGE SHOP INSPECTION DOCUMENTATION PACKAGE SHOP INSPECTION DOCUMENTATION PACKAGE SHOP INSPECTION DOCUMENTATION PACKAGE SHOP INSPECTION DOCUMENTATION PACKAGE SHOP INSPECTION DOCUMENTATION PACKAGE SHOP INSPECTION DOCUMENTATION PACKAGE SHOP INSPECTION DOCUMENTATION PACKAGE SHOP INSPECTION DOCUMENTATION PACKAGE
SHOP INSPECTION DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: SHOP INSPECTION DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: SHOP INSPECTION DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: SHOP INSPECTION DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: SHOP INSPECTION DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: SHOP INSPECTION DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: SHOP INSPECTION DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: SHOP INSPECTION DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: SHOP INSPECTION DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET:
COMPLETED INSPECTION CHECKLISTS (BY CHECKLIST NO.): COMPLETED INSPECTION CHECKLISTS (BY CHECKLIST NO.): COMPLETED INSPECTION CHECKLISTS (BY CHECKLIST NO.): COMPLETED INSPECTION CHECKLISTS (BY CHECKLIST NO.): COMPLETED INSPECTION CHECKLISTS (BY CHECKLIST NO.): COMPLETED INSPECTION CHECKLISTS (BY CHECKLIST NO.): COMPLETED INSPECTION CHECKLISTS (BY CHECKLIST NO.): COMPLETED INSPECTION CHECKLISTS (BY CHECKLIST NO.): COMPLETED INSPECTION CHECKLISTS (BY CHECKLIST NO.):
NUMBER ATTACHED NUMBER ATTACHED DESCRIPTION OF FORM DESCRIPTION OF FORM DESCRIPTION OF FORM DESCRIPTION OF FORM DESCRIPTION OF FORM DESCRIPTION OF FORM DESCRIPTION OF FORM
FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT FIELD INSPECTION REPORT
RADIOGRAPHIC FILM REPORT RADIOGRAPHIC FILM REPORT RADIOGRAPHIC FILM REPORT RADIOGRAPHIC FILM REPORT RADIOGRAPHIC FILM REPORT RADIOGRAPHIC FILM REPORT RADIOGRAPHIC FILM REPORT
PIPE SPOOL INSPECTION REPORT PIPE SPOOL INSPECTION REPORT PIPE SPOOL INSPECTION REPORT PIPE SPOOL INSPECTION REPORT PIPE SPOOL INSPECTION REPORT PIPE SPOOL INSPECTION REPORT PIPE SPOOL INSPECTION REPORT
MANUFACTURER DEFICIENCY NOTICE MANUFACTURER DEFICIENCY NOTICE MANUFACTURER DEFICIENCY NOTICE MANUFACTURER DEFICIENCY NOTICE MANUFACTURER DEFICIENCY NOTICE MANUFACTURER DEFICIENCY NOTICE MANUFACTURER DEFICIENCY NOTICE
MANUFACTURER NONCONFORMANCE REPORT MANUFACTURER NONCONFORMANCE REPORT MANUFACTURER NONCONFORMANCE REPORT MANUFACTURER NONCONFORMANCE REPORT MANUFACTURER NONCONFORMANCE REPORT MANUFACTURER NONCONFORMANCE REPORT MANUFACTURER NONCONFORMANCE REPORT
FINAL INSPECTION RELEASE FINAL INSPECTION RELEASE FINAL INSPECTION RELEASE FINAL INSPECTION RELEASE FINAL INSPECTION RELEASE FINAL INSPECTION RELEASE FINAL INSPECTION RELEASE
MANUFACTURER REQUEST FOR VARIANCE MANUFACTURER REQUEST FOR VARIANCE MANUFACTURER REQUEST FOR VARIANCE MANUFACTURER REQUEST FOR VARIANCE MANUFACTURER REQUEST FOR VARIANCE MANUFACTURER REQUEST FOR VARIANCE MANUFACTURER REQUEST FOR VARIANCE
MANUFACTURER CLOSE OUT EVALUATION MANUFACTURER CLOSE OUT EVALUATION MANUFACTURER CLOSE OUT EVALUATION MANUFACTURER CLOSE OUT EVALUATION MANUFACTURER CLOSE OUT EVALUATION MANUFACTURER CLOSE OUT EVALUATION MANUFACTURER CLOSE OUT EVALUATION
MANUFACTURER ALERT NOTICE MANUFACTURER ALERT NOTICE MANUFACTURER ALERT NOTICE MANUFACTURER ALERT NOTICE MANUFACTURER ALERT NOTICE MANUFACTURER ALERT NOTICE MANUFACTURER ALERT NOTICE
ADDITIONAL COMMENTS REGARDING INSPECTION DOCUMENTATION: ADDITIONAL COMMENTS REGARDING INSPECTION DOCUMENTATION: ADDITIONAL COMMENTS REGARDING INSPECTION DOCUMENTATION: ADDITIONAL COMMENTS REGARDING INSPECTION DOCUMENTATION: ADDITIONAL COMMENTS REGARDING INSPECTION DOCUMENTATION: ADDITIONAL COMMENTS REGARDING INSPECTION DOCUMENTATION: ADDITIONAL COMMENTS REGARDING INSPECTION DOCUMENTATION: ADDITIONAL COMMENTS REGARDING INSPECTION DOCUMENTATION: ADDITIONAL COMMENTS REGARDING INSPECTION DOCUMENTATION:
EQUIPMENT DOCUMENTATION PACKAGE EQUIPMENT DOCUMENTATION PACKAGE EQUIPMENT DOCUMENTATION PACKAGE EQUIPMENT DOCUMENTATION PACKAGE EQUIPMENT DOCUMENTATION PACKAGE EQUIPMENT DOCUMENTATION PACKAGE EQUIPMENT DOCUMENTATION PACKAGE EQUIPMENT DOCUMENTATION PACKAGE EQUIPMENT DOCUMENTATION PACKAGE
EQUIPMENT DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: EQUIPMENT DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: EQUIPMENT DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: EQUIPMENT DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: EQUIPMENT DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: EQUIPMENT DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: EQUIPMENT DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: EQUIPMENT DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET: EQUIPMENT DOCUMENTS INCLUDED WITH THIS SUMMARY SHEET:
REQUI RED COMPLET ED COMPLET ED NO. OF COPIES INCLUDED NO. OF COPIES INCLUDED DESCRIPTION DESCRIPTION DESCRIPTION COMMENTS
MANUFACTURER'S DATA REPORT MANUFACTURER'S DATA REPORT MANUFACTURER'S DATA REPORT
MATERIAL TEST REPORTS MATERIAL TEST REPORTS MATERIAL TEST REPORTS
WELDING PROCEDURES WELDING PROCEDURES WELDING PROCEDURES
HYDROTEST REPORTS HYDROTEST REPORTS HYDROTEST REPORTS
U-1 REPORTS U-1 REPORTS U-1 REPORTS
R-1 REPORTS R-1 REPORTS R-1 REPORTS
BASELINE THICKNESS BASELINE THICKNESS BASELINE THICKNESS
CONSTRUCTION DRAWINGS CONSTRUCTION DRAWINGS CONSTRUCTION DRAWINGS
OTHER (SPECIFY) OTHER (SPECIFY) OTHER (SPECIFY)
OTHER DOCUMENTATION INCLUDED (PROVIDE BRIEF DESCRIPTION): OTHER DOCUMENTATION INCLUDED (PROVIDE BRIEF DESCRIPTION):
THE DOCUMENTATION ATTACHED TO THIS FORM REPRESENTS FOR THIS ORDER ALL THE MANUFACTURING DOCUMENTATION REQUIRED BY THE APPLICABLE ENGINEERING PRACTICES AND ALL SHOP INSPECTION RELATED FORMS AND REPORTS REQUIRED BY THIS ENGINEERING PRACTICE. THE DOCUMENTATION ATTACHED TO THIS FORM REPRESENTS FOR THIS ORDER ALL THE MANUFACTURING DOCUMENTATION REQUIRED BY THE APPLICABLE ENGINEERING PRACTICES AND ALL SHOP INSPECTION RELATED FORMS AND REPORTS REQUIRED BY THIS ENGINEERING PRACTICE.
SIGNED: DATE:
(INSPECTOR PRIMARILY RESPONSIBLE FOR SHOP INSPECTION) (INSPECTOR PRIMARILY RESPONSIBLE FOR SHOP INSPECTION)
THE ATTACHED DOCUMENTATION HAS BEEN REVIEWED AND ACCEPTED AS BEING COMPLETE AND CORRECT FOR THIS ORDER. THE ATTACHED DOCUMENTATION HAS BEEN REVIEWED AND ACCEPTED AS BEING COMPLETE AND CORRECT FOR THIS ORDER.
SIGNED: DATE:
(IPE REPRESENTATIVE ACCEPTING DOCUMENTATION) (IPE REPRESENTATIVE ACCEPTING DOCUMENTATION)