SCOPE

2.0 REFERENCES

The latest edition of the following standards and publications are referred to herein.

Engineering Practices Engineering Practices
EP 1-1-3 Deviations to Engineering Practices
EP 5-6-2 Piping for Rotating Equipment
EP 5-6-7 Steam Traps
EP 5-6-8 Steam Tracing
EP 12-1-1 Control Systems

DEFINITIONS

GENERAL GUIDELINES

CLIMATIC ZONES

REQUIREMENTS FOR ALL CLIMATIC ZONES

Process Piping

NOTE: Blowing out piping with air shall be confined to lines containing stocks of low volatility which are well below their flash points. Where piping to be blown discharges into tankage, venting capacity shall be provided to prevent pressurizing the tankage.

Pressure Relieving Systems

Pressure relieving systems, including pressure relief valve bodies, shall be heat traced where the inlet and outlet lines, of pressure relief (PR) devices, may become plugged due to wax deposits or the congealing of viscous fluids at ambient temperatures.

Closed Drain Headers

Closed drain headers shall be winterized where piping may become plugged due to:

Instruments and Associated Piping

Analyzer Shelters

Enclosed walk-in type analyzer shelters shall be heated if the ambient temperature can drop below 41°F.

Process Vessels

Machinery and Associated Piping

Piping

Hydrants, Monitors, Spray and Deluge Systems

Emergency (Safety) Showers

Flare Seals

Seal legs, the bottom of flare stacks, and seal drums shall be heat traced and insulated or steam injection shall be used to prevent freezing of the water seal.

Vents for Fixed Roof Tanks

Pressure-vacuum vents for cone roof tanks shall be provided with non-freezing features.

Chemicals and Supplies

Chemicals and supplies shall be stored at a temperature above their freezing point, unless other storage temperatures are specified.

Lines Between Seal Drum and Flare

These lines shall be traced and insulated if specified.

Additional Requirements

ADDITIONAL REQUIREMENTS FOR ZONES 2 AND 3

Piping

Instruments

Process Vessels

Where hydrocarbon and water are separated in a vessel, only those parts of the vessel containing water need be protected from freezing. Insulation or heat tracing may be used as appropriate.

Machinery and Auxillaries

ADDITIONAL REQUIREMENTS FOR ZONE 3 ONLY

Piping for Water Service

UtilIty Stations

Lateral connections to utility stations (air, water, or steam) shall have a valve at the header and a drain valve on the station branch.

Instruments

Winterizing of locally mounted instruments shall be provided by means of insulated housings with steam coils or electric heating. Heating shall be installed in a manner to avoid hindering removal of the instruments and be within the Manufacturer's recommended temperature rating.

Figure

TABLE 2

WINTERIZATION REQUIREMENTS BY ZONE

EQUIPMENT TO BE WINTERIZED ZONE 1 ZONE 2 ZONE 3
PARAGRAPH PARAGRAPH PARAGRAPH
PIPING
Compressor Suction Lines Process Piping (Intermittently Used),
Containing Liquids Pressure Relieving Systems Closed Drain Headers Emergency Showers
Below-Ground and Fire Water Systems Exposed Sanitary Sewer Piping
Live and Exhaust Steam Systems
Utility Air Systems
Above-Ground Water Lines
Block Valves in Water Lines to Process Equipment
All Process Piping Above Frost Line Water Drains for Pumps and Compressors Utility Station Piping Laterals
Lines Between Seal Drum and Flare
6.1.1

6.1.2 , 6.1.3
6.2
6.3
6.1O.1, 6.1O.2

6.8.1, 6.8.2









6.14
6.1.1

6.1.2, 6.1.3
6.2
6.3, 7.1.6
6.1O.1, 6.1O.2

6.8.1, 6.8.2

7.1.1
7.1.2
7.1.3
7.1.4, 7.1.5




6.14
6.1.1

6.1.2, 6.1.3
6.2
6.3, 7.1.6
6.1O.1, 6.1O.2,
8.4
6.8.1, 6.8.2,
8.1.1, 8.1.3
7.1.1
7.1.2, 8.2
7.1.3, 8.2
7.1.4, 7.1.5

8.1.1
8.1.2
8.1.4
8.2
6.14
INSTRUMENTS
Instrument Bodies (or Portions Containing Fluids) Instrument Piping
Pressure Gauge and Instrument Seals Electronic Instruments
Analyzers
Local Instruments
6.4.1
6.4.2
6.4.3
6.5
6.4.3
6.4.1
6.4.2
6.4.3
7.2.1
6.5, 7.2.2
6.4.3
6.4.1
6.4.2
6.4.3
7.2.1
6.5, 7.2.2
6.4.3, 8.3
PROCESS VESSELS
Vessels Containing Fluids Which May Congeal Heat Exchangers (Shell and Tube, Air Cooled) Chlorine Evaporators
Vessels Containing Water
6.6.1
6.6.2
6.6.3
6.6.1
6.6.2
6.6.3
7.3
6.6.1
6.6.2
6.6.3
7.3

TABLE 2

WINTERIZATION REQUIREMENTS BY ZONE (CONTINUED)

EQUIPMENT TO BE WINTERIZED ZONE 1 ZONE 2 ZONE 3
PARAGRAPH PARAGRAPH PARAGRAPH
PUMPS AND MACHINERY 6.7.1
6.7.2
6.7.1, 7.4.3
6.7.2
7.4.3

7.4.1, 7.4.2
6.7.1, 7.4.3
6.7.2
7.4.3

7.4.1, 7.4.2
Pumps (Including Associated Piping) Seal, Flushing, and Lubricating Oil Lines Pumps in Intermittent Services
Major Machinery (such as Compressors,
Turbines, Including Auxiliaries)
6.7.1
6.7.2
6.7.1, 7.4.3
6.7.2
7.4.3

7.4.1, 7.4.2
6.7.1, 7.4.3
6.7.2
7.4.3

7.4.1, 7.4.2
MISCELLANEOUS 6.1.3

6.11
6.12
6.1.3

6.11
6.12
6.1.3

6.11
6.12
Chemicals and Supplies
Seal Legs, Bottom of Flare Stacks, and Seal Drums
Pressure Vacuum Vents
6.1.3

6.11
6.12
6.1.3

6.11
6.12
6.1.3

6.11
6.12