SCOPE

2.0 REFERENCES

The latest published edition of the following Standards and Codes shall be used with this Practice:

STANDARDS AND PUBLICATIONS

IPE Engineering Practices
EP 1-1-3 Deviations to the IPE Engineering Practices

ELECTRICAL EQUIPMENT INSPECTION AND TESTING FORMS

The following Equipment Inspection and Testing Forms are attached:

Transformer Identification

TRANSFORMER VISUAL INSPECTION (T1)

Transformer Tag Number: Transformer Location: Date:

Nameplate Information

Manufacturer: Manufacturer: Manufacturer: Serial No: Serial No: Serial No:
KVA Rating: Phase: 3 1 Phase: 3 1 Impedance: % Impedance: % Rise temp: oC
Primary voltage: Primary voltage: Volts [ Delta / Wye Volts [ Delta / Wye Rated Current: Amps Rated Current: Amps
Secondary voltage: Secondary voltage: Volts [ Delta / Wye Volts [ Delta / Wye Rated Current: Amps Rated Current: Amps
Transformer Design: Free Breathing Free Breathing Sealed Conservator Conservator Dry-conventional Dry-conventional Encapsulated
Cooling system type: Cooling system type: Self -dry type (AA) Self -dry type (AA) Self -dry type (AA) Forced Air (FA) Forced Air (FA) Forced Oil (FOA) Forced Oil (FOA)
Self cooled oil (OA) Self cooled oil (OA) Self cooled oil (OA) Forced Air/ Dry-type (FA/AA) Forced Air/ Dry-type (FA/AA) Forced Air/ Dry-type (FA/AA) Forced Air/ Dry-type (FA/AA)
Forced air/Oil filled (FA/OA) Forced air/Oil filled (FA/OA) Forced air/Oil filled (FA/OA) Forced air/Forced oil/Oil filled (FA/FOA/OA) Forced air/Forced oil/Oil filled (FA/FOA/OA) Forced air/Forced oil/Oil filled (FA/FOA/OA) Forced air/Forced oil/Oil filled (FA/FOA/OA)

Tap Changer Voltage

Tap Voltage Setting Tap Voltage Setting (Mark X for current tap setting) (Mark X for current tap setting)
D-Y Zig-Zag
D-D Other
Y-Y
Y-D

Temperature/Pressure Gauges

Winding Temp: oC No Gauge Maximum Temperature Indicator oC Maximum Temperature Indicator oC Maximum Temperature Indicator oC
Reset maximum temp. indicator?: Yes No No No
Liquid level : No Gauge Normal Low Low
Liquid temperature: oC High Normal Low Low
Transformer Internal Pressure: No Gauge As found? psig As found? psig Vacuum

Extra

Transformer Grounded properly?: Yes Not Connected Not Connected
Insulating Fluid Leakage?: None Yes Location: Location:
Transformer Condition: Good Fair Poor Poor

Check Box

Check nameplate, rating, impedance and taps Check secondary terminal box for weather proofing
Check case, cooling fins, and switch for mechanical damage Check transformer control box for weather proofing
Check tank, cooling fins, valves, fittings and gasket surfaces for oil leakage Inspect transformer oil level
Check tightness of all bolting Inspect temperature indicator and pressure vacuum gauge
Check primary terminal box for weather proofing Inspect ground connections
Technician: Sheet No.:

Identification

GROUNDING SYSTEMS (T2)

Identification / Location: Date:
Equipment Designation: Equipment Designation:

Check Box

Check ground rod accessibility
Check corrosion resistant materials
Check connection to equipment
Check mechanical protection of grounding wire
Check connections for tightness
Check ground wire sizes and color identification
Inspect all underground splices
Inspect all internal foundation connections to ground (if any)
Type * Location of ground tested Resistance to ground - ohms Check Continuity Remarks

* Type: 1-ROD, 2-LOOP, 3-GRID, 4-EQUIPMENT, 5-OTHER (SPECIFY)

Grounding Condition: Poor Average Good
Technician: Sheet No.:

Identification

MEDIUM VOLTAGE CIRCUIT BREAKER (T03)

Identification / Location: Identification / Location: Identification / Location: Identification / Location: Identification / Location: Identification / Location: Identification / Location: Date:
Substation / Circuit No.: Substation / Circuit No.: Manufacturer: Manufacturer: Manufacturer: Serial No.: Serial No.: Serial No.:
Breaker Voltage Rating: Breaker Voltage Rating: Breaker Amp Rating: Breaker Amp Rating: Breaker Amp Rating: Breaker MVA Interrupting Duty: Breaker MVA Interrupting Duty: Breaker MVA Interrupting Duty:
Breaker Type: Vacuum Vacuum Air-Break Oil-immersed Oil-immersed SF6Gas SF6Gas

Check Box

Check breaker for proper alignment in cell Inspect breaker parts for cleanliness and proper lubrication
Check for proper roll-in and roll-out of breaker Inspect manual operation of breaker
Check breaker for mechanical damage Inspect operation of mechanical trip function
Check for removal of blocking and jumpers Inspect dc close and trip power for polarity and fuses
Check for tightness of all bolting Inspect outgoing cable termination details
Check current transformer quantity and ratio Inspect air or oil breaker contact surfaces, wipe, alignment and lubrication per manufacturer's instructions
Check components for identification Inspect vacuum or SF6 gas contacts and mechanical adjustments per manufacturer's Instructions
Inspect operation of breaker drawout mechanisms including mechanical interlocks, position indicators, shutters and safety features. Inspect operation of breaker drawout mechanisms including mechanical interlocks, position indicators, shutters and safety features. Inspect operation of breaker drawout mechanisms including mechanical interlocks, position indicators, shutters and safety features.

Test Insulation Resistance of circuit breaker, closed position: (2500V megger - 1 min.)

Phase A-B: MEGOHMS Phase A-G: MEGOHMS
Phase B-C: MEGOHMS Phase B-G: MEGOHMS
Phase C-A: MEGOHMS Phase C-G : MEGOHMS

DC HIPOT test - Circuit breaker closed

Test report attached Final test voltage =
Test result acceptable Remarks:

(Vacuum breaker only ) Test vacuum bottle integrity

(Overpotential test with breaker open. Caution -X- radiation potential, follow all MFGR. Instructions) (Overpotential test with breaker open. Caution -X- radiation potential, follow all MFGR. Instructions) (Overpotential test with breaker open. Caution -X- radiation potential, follow all MFGR. Instructions)
Phase A bottle OK Phase B bottle OK Phase C bottle OK

Tests breaker contact resistance (Low resistance ohmmeter)

Phase A Phase B Phase C

Test operate breaker - Test position

Close from all local/remote close devices
Trip from all local/remote trip devices, including protective relays

Test operate breaker - Connected position

Close from all local/remote close devices
Trip from all local/remote trip devices, including protective relays
Circuit Breaker Condition: Poor Average Good
Technician: Sheet No.:

Identification

PROTECTIVE RELAY (T4)

Tag Number / Location: Tag Number / Location: Date:
Substation / Circuit No.: Air Temperature: Relative Humidity:

Relay Specification

Relay Manufacturer: Type: Type: Catalog: Catalog:
Relay Use: Characteristic: Characteristic: CT Ratio:
/5
PT Ratio:
Ground/Neutral Relay Catalog No.: Ground/Neutral Relay Catalog No.: Ground/Neutral Inst. Trans. Ratio: Ground/Neutral Inst. Trans. Ratio: Ground/Neutral Inst. Trans. Ratio:

Test and Check Box

Phase designation Phase designation Phase designation Phase designation Phase designation A A A B B B C C C C G/N G/N G/N
As found As found As left As found As left As left As found As found As left As left As found As found As left
Settings Settings Time dial Time dial Time dial
Settings Settings Instantaneous Instantaneous Instantaneous
Settings Settings Current tap Current tap Current tap
Settings Settings
Settings Settings Minimum Minimum Minimum
Time Tests: Time Tests: Time Tests: Time Tests: Time Tests: Time Tests: Time Tests: Time Tests: Time Tests: Time Tests: Time Tests: Time Tests: Time Tests: Time Tests: Time Tests: Time Tests: Time Tests: Time Tests:
Circuit
amps
Circuit
amps
Relays amps % of Setting
1
2
3
4
5
Other Tests: Other Tests: Other Tests: Other Tests: Other Tests: Other Tests: Other Tests: Other Tests: Other Tests: Other Tests: Other Tests: Other Tests: Other Tests: Other Tests: Other Tests: Other Tests: Other Tests: Other Tests:
Targets / Seal-in Targets / Seal-in Targets / Seal-in Targets / Seal-in Targets / Seal-in
Targets / Seal-in Targets / Seal-in Targets / Seal-in Targets / Seal-in Targets / Seal-in
Maintenance Check Maintenance Check Contacts: Contacts: Contacts:
Maintenance Check Maintenance Check Connections: Connections: Connections:
Maintenance Check Maintenance Check Bearings: Bearings: Bearings:
Maintenance Check Maintenance Check Mech.: Mech.: Mech.:
Maintenance Check Maintenance Check Cleaning: Cleaning: Cleaning:
Maintenance Check Maintenance Check
Maintenance Check Maintenance Check
Maintenance Check Maintenance Check
Relay Condition: Poor Average Good
Technician: Sheet No.:

Identification

TRANSFORMER ELECTRICAL TEST (T5)

Transformer Tag Number: Location: Date:

Nameplate Information

Manufacturer: Manufacturer: Manufacturer: Serial No: Serial No: Serial No:
KVA Rating: Phase: 3 1 Phase: 3 1 Impedance: % Impedance: % Rise temp: oC
Primary voltage: Primary voltage: Volts [ Delta / Wye Volts [ Delta / Wye Rated Current: Amps Rated Current: Amps
Secondary voltage: Secondary voltage: Volts [ Delta / Wye Volts [ Delta / Wye Rated Current: Amps Rated Current: Amps

As found condition:

Oil temperature Oil level Tank pressure/vacuum

Test oil sample from transformer (and primary switch, if applicable)

Oil condition test report attached (dielectric, neutralization no., interfacial tension, color) Oil condition test report attached (dielectric, neutralization no., interfacial tension, color)
Gas chromatograph test report attached Gas chromatograph test report attached
Test results acceptable Remarks

Test Transformer Insulation Resistance

(10 minute dielectric absorption test -500V megger for 480V and below, 2500V megger for above 480V)

1 min. MegOhms 10 min. MegOhms Polarization index(10+1 Min) Pass/Fail
Primary- Ground
Secondary- Ground
Primary- Secondary

Transformer AC power factor test

Test report attached Test report attached
Test result acceptable Remarks:

Tests ground resistance of transformer case (Fall-of-potential method)

Test operation of auxiliary devices

Temperature alarm Oil level alarm Pressure relief alarm
Space heater alarm Cooling fan operation Sudden pressure relay

Transformers taps:

Set at tap position Primary tap volts (from nameplate)
Transformer Condition: Good Fair Poor
Technician: Sheet No.:

Identification

POWER CABLE (T6)

Identification / Location: Identification / Location: Identification / Location: Identification / Location: Identification / Location: Identification / Location: Identification / Location: Date:
Circuit No.: Circuit No.: From: To: To: To: Length: Length:
Cable Description: Cable Description: UL/NEC type: Manufacturer: Manufacturer: Manufacturer: Voltage rating: Voltage rating:
Wire Size: Wire Size: Ground wire size: Insulating type: Insulating type: Insulating type: Shielded Non-shielded Shielded Non-shielded
Check cable size and rating Check cable size and rating Check cable size and rating Inspect cable termination fitting Inspect cable termination fitting Inspect cable termination fitting
Check cable support systems Check cable support systems Check cable support systems Inspect cable ground wire for proper termination Inspect cable ground wire for proper termination Inspect cable ground wire for proper termination
Check cable bending radius Check cable bending radius Check cable bending radius Inspect cable lug for proper crimping and torque Inspect cable lug for proper crimping and torque Inspect cable lug for proper crimping and torque
Check cables for mechanical damage Check cables for mechanical damage Check cables for mechanical damage Inspect cable splices (if any) Inspect cable splices (if any) Inspect cable splices (if any)
Check grounding of cable support system Check grounding of cable support system Check grounding of cable support system Inspect cable stress cone (if shielded) Inspect cable stress cone (if shielded) Inspect cable stress cone (if shielded)

Test Insulation Resistance - on reels

1000V Megger, 1 Min. (600V Cable)
2500V Megger, 1 Min. (above 600 V, Non-shielded cable)
2500V Megger, 10 Min. (dielectric absorption (shielded cable)
1 min. MegOhms (sheilded cable) 10 min. MegOhms Polarization index (10+1 Min) Pass/Fail
Phase 1 to 2/3 G
Phase 2 to 3/1 G
Phase 3 to 1/2 G

Test Conductor Continuity and Phasing- final position

Continuity: Phase 1 Phase 2 Phase 3 Ground Shield (if any)
Phasing: Verify phase 1-2-3 relationship maintained between equipment Verify phase 1-2-3 relationship maintained between equipment Verify phase 1-2-3 relationship maintained between equipment Verify phase 1-2-3 relationship maintained between equipment Verify phase 1-2-3 relationship maintained between equipment
(Left-to- right, front-to-back, H1-H2-H3, T1-T2-T3, L1-L2-L3, etc.) (Left-to- right, front-to-back, H1-H2-H3, T1-T2-T3, L1-L2-L3, etc.) (Left-to- right, front-to-back, H1-H2-H3, T1-T2-T3, L1-L2-L3, etc.) (Left-to- right, front-to-back, H1-H2-H3, T1-T2-T3, L1-L2-L3, etc.) (Left-to- right, front-to-back, H1-H2-H3, T1-T2-T3, L1-L2-L3, etc.) (Left-to- right, front-to-back, H1-H2-H3, T1-T2-T3, L1-L2-L3, etc.)

Test Insulation Resistance - final position

1000V Megger, 1 Min. (600V Cable)
5000V Megger, 10 Min. dielectric absorption (above 600Vcable)
1 min. MegOhms (above 600V) 10 min. MegOhms Polarization index(10+1 Min) Pass/Fail
Phase 1 to 2/3 G
Phase 2 to 3/1 G
Phase 3 to 1/2 G

DC Hipot test-final position, shielded cable only

Test report attached Final test voltage =
Test results acceptable Remarks:

Radiograph test of splices and terminations (shielded cable only)

Radiographs attached Remarks:
Radiographs acceptable
Technician: Sheet No.:

Identification

MEDIUM VOLTAGE STARTER (T7)

Tag Number / Location: Tag Number / Location: Tag Number / Location: Date:
Substation / Circuit No.: Motor/ Load Identification: Motor/ Load Service Description: Motor/ Load Service Description:

Starter Information

Manufacturer: Manufacturer: Serial/ S.O. No.: Serial/ S.O. No.: Voltage Rating: Voltage Rating: Voltage Rating: Amp Rating:
Fuse Type and Size: Fuse Type and Size: CT Ratio: CT Ratio: Overload Type: Overload Type: Overload Type: Other:
Starter Type: Vacuum Vacuum Air-Break Air-Break Oil-immersed SF6Gas SF6Gas

Check Box

Check starter for proper alignment in cell Check components for identification
Check for proper roll-in and roll-out of starter Inspect manual operation of starter
Check starter for mechanical damage Inspect operation of mechanical trip function
Check for removal of blocking and jumpers Inspect dc close and trip power for polarity and fuses
Check for tightness of all bolting Inspect incoming/outgoing cable termination details
Inspect operation of starter drawout mechanisms including mechanical interlocks, position indicators, shutters and safety features Inspect air or oil starter contact surfaces, wipe, alignment and lubrication per manufacturer's instructions
Inspect starter parts for cleanliness and proper lubrication Inspect vacuum or SF6 gas contacts and mechanical adjustments per manufacturer's instructions
Check CPT and PT fuses and voltage ratings Inspect ground connections to ground bus

Test Insulation Resistance of circuit starter, closed position: (2500V megger - 1 min.)

Phase A-B: MEGOHMS Phase A-G: MEGOHMS
Phase B-C: MEGOHMS Phase B-G: MEGOHMS
Phase C-A: MEGOHMS Phase C-G: MEGOHMS
Motor + Feeder to GND MegOhms Motor + Feeder to GND MegOhms

Test insulation resistance of control wires (500V megger )

C1 C2 C3 C4 C5 C6 C7

Tests starter contact resistance (Low resistance ohmmeter)

Phase A Phase B Phase C

Test CT and PT secondary circuits and calibrate and test any protective relays and meters

CT current injection test PT voltage injections test
Protective relay test sheet attached

Test cabinet space heaters (if any)

Verify space heaters and thermostat operation Record space heater amps:

Test operate starter - Test position

Close from all local/remote close devices Trip from all local/remote trip devices, including protective relays

Test operate starter - Connected position

Close from all local/remote close devices Close from all local/remote close devices Close from all local/remote close devices Trip from all local/remote trip devices, including protective relays Trip from all local/remote trip devices, including protective relays
Starter Condition: Poor Average Average Good
Technician: Sheet No.:

Identification

MEDIUM VOLTAGE MOTOR AND MOTOR CIRCUIT (T8)

Plant Number/Unit: Substation: Substation: Date:
Substation/MCC/Circuit No.: Motor Tag Number / Identification: Motor/Load Service Description: Motor/Load Service Description:

Motor Information

Manufacturer: Type / Style Serial No.: Voltage Rating: HP:
Full Load Amps: Serv. Factor: Rpm: Cable Size:

Check Box

Inspect/service push button station Check equipment for area classification conformance
Check motor/equipment rotation direction and speed Check seals poured, breathers and drains installed
Check motor shaft and play and free rotation Inspect contactor operation, cleanliness, adjustment and lubrication per the manufacturer's instructions
Check motor ground connections Inspect main fuses, CT ratios, and overloads for proper size and type
Check CPT and starter coil ratings Inspect wire terminations at motor and starter
Check size of power and control wires Inspect P.F. capacitors installation (wire, fuses, etc.)
Check cable/conduit tagging Inspect motor bearings and lubrication
Check nameplate- starter and control station Inspect motor space heater installation

Test Continuity of Wires

T 2 T 2 T 3 Gnd C 1 C 2 C 3 C 4 C 5 C 6 C 7

Test Insulation Resistance - 10 Min.

Motor Only 1 min. MegOhms 10 min. MegOhms Polarization index (10+1 Min) Pass/Fail
Phase 1 to 2/3 G
Phase 2 to 1/3 G
Phase 3 to 1/2 G
Motor + Feeder to GND

Test insulation resistance of control wires (500V megger )

C1 C2 C3 C4 C5 C6 C7

Test overload protective device

Overload setting Curve Other
Test @300% Amps Trip time sec. Acceptable (within curve)
Test @500% Amps Trip time sec. Acceptable (within curve)

Test current transformers

CT current injection test (verify current signal to current devices) PT voltage injection test

Tests starter- connected position - motor leads disconnected

Close and trip starter from all control and protective devices Close and trip starter from all control and protective devices
Verify motor space heater off when running Record motor space heater amps

Tests run motor (1 hour run-in for new motor)

Check rotation Record no load amps Amps Record no load amps Amps Record no load amps Amps
Check magnetic center Bearing housing temp Amps OB F IB F
Check P.F. capacitor discharge Bearing housing vibration OB mils IB mils
Technician: Sheet No.

Identification

MEDIUM VOLTAGE LOAD-BREAK SWITCHES (T9)

Identification / Location: Identification / Location: Identification / Location: Identification / Location: Identification / Location: Identification / Location: Identification / Location: Identification / Location: Date: Date:
Circuit No. Circuit No. Circuit No. Manufacturer: Manufacturer: Manufacturer: Serial No. Serial No. Serial No. Serial No.
Voltage Rating: Voltage Rating: Voltage Rating: Loadbreak Amp Rating: Loadbreak Amp Rating: Loadbreak Amp Rating: Close and Latch Amp Rating: Close and Latch Amp Rating: Close and Latch Amp Rating: Close and Latch Amp Rating:
Switch type: Air-Break Oil-immersed Oil-immersed SF6Gas Vacuum Vacuum Fused Fused Unfused

Check Box

Check equipment for proper alignment and levelness Inspect bus bolting for proper torque
Check foundation bolts or welds Inspect switch insulator/ bushings for cleanliness
Check equipment for mechanical damage Inspect ground connections to equipment
Check for removal of blocking and jumpers Inspect air and oil switch contact surfaces, wipe, alignment, and lubrication per manufacturer's instruction
Check tightness of all bolting Inspect switch operation mechanism, lubrication per manufacturer's instructions
If fused, check fuse size and voltage rating Inspect switch viewing window
If outdoor, check enclosure for weatherproofing Inspect incoming main cable termination details
If oil switch, check for oil leaks or seepage

Test Insulation Resistance of switch, closed position: (2500V megger - 1 min.)

Phase A-B: MEGOHMS Phase A-G: MEGOHMS
Phase B-C: MEGOHMS Phase B-G: MEGOHMS
Phase C-A: MEGOHMS Phase C-G: MEGOHMS

DC HIPOT test - Switch closed

Test report attached Final test voltage =
Test result acceptable Remarks:

Tests switch contact resistance (Low resistance ohmmeter)

Phase A Phase B Phase C

Tests ground resistance of switchgear ground bus (fall-of-potential method)

Test switch enclosure space heaters (if any)

Verify space heater and thermostat operation Record space heater amps

(Vacuum switch only ) Test vacuum bottle integrity

(Overpotential test with switch open. Caution: X- radiation potential, follow all manufacturer's instructions.) (Overpotential test with switch open. Caution: X- radiation potential, follow all manufacturer's instructions.) (Overpotential test with switch open. Caution: X- radiation potential, follow all manufacturer's instructions.)
Phase A bottle OK Phase B bottle OK Phase C bottle OK

(Oil switch only) Test oil sample

Oil condition test report attached (dielectric, neutralization number, interfacial tension, color) Oil condition test report attached (dielectric, neutralization number, interfacial tension, color)
Gas chromatograph test report attached Gas chromatograph test report attached
Test results acceptable Remarks

(SF6 switch only)

Record gas pressure gauge reading:
Test gas pressure alarm (Do not vent SF6 gas - manually active switch or jumper alarm contacts)
Technician: Sheet No.:

Identification

LOW VOLTAGE SWITCHGEAR LINEUPS (T10)

Identification / Location: Identification / Location: Date:
Substation / Circuit No.: Manufacturer: Serial No.:
Voltage Rating: Bus Rating: MVA Interrupting Duty:

Check Box

Check switchgear for proper alignment and levelness Check components for identification
Check foundation bolts or welds Inspect bus insulators for cleanliness
Check switchgear for mechanical damage Inspect ground connections to ground bus
Check for removal of blocking and jumpers Inspect bus bolting for proper torque
Check for tightness of all bolting Inspect connections to high resistance ground unit
Check CPT and PT fuses and voltage ratings and ratios Inspect main incoming termination details

Test Insulation Resistance - Switchgear bus: (1000V megger - 1 min.)

Phase A-B: MEGOHMS Phase A-G: MEGOHMS
Phase B-C: MEGOHMS Phase B-G: MEGOHMS
Phase C-A: MEGOHMS Phase C-G: MEGOHMS

Test insulation resistance - instrument transformers (Megohms - 500V megger)

List Primary Secondary List Primary Secondary

Test CT and PT secondary circuits

CT current injection test (verify current signal to current devices)
PT voltage injection test (verify voltage signal to voltage devices)

Calibrate and test all protective relays and meters

Protective relay test sheets attached
Microprocessor meter unit setup and function checked

Tests high resistance ground fault unit

Tests ground resistance of switchgear ground bus (fall-of-potential method)

Tests switchgear space heaters (if any)

Verify space heater and thermostat operation Record space heater amps
Technician: Sheet No.:

Identification

LOW VOLTAGE POWER CIRCUIT BREAKER (T11)

Identification / Location: Identification / Location: Identification / Location: Identification / Location: Date: Date: Date:
Substation / Circuit No.: Substation / Circuit No.: Manufacturer: Manufacturer: Serial No.: Serial No.: Serial No.:
Breaker Voltage Rating: Breaker Voltage Rating: Breaker Amp Rating: Breaker Amp Rating: Breaker MVA Interrupting Duty: Breaker MVA Interrupting Duty: Breaker MVA Interrupting Duty:
Breaker Type: Power air break Insulated case Molded case Molded case Drawout Fixed

Check Box

Check breaker for proper alignment in cell Inspect breaker parts for cleanliness and proper lubrication
Check for proper roll-in and roll-out of breaker Inspect manual operation of breaker
Check breaker for mechanical damage Inspect operation of mechanical trip function
Check for removal of blocking and jumpers Inspect cable termination details
Inspect breaker drawout mechanism, interlocks, shutters, and indicators Inspect power air or oil breaker contact surfaces, wipe, alignment, and lubrication per manufacturer's instructions
Check for tightness of all bolting

Test Insulation Resistance of circuit breaker, closed position: (1000V megger - 1 min.)

Phase A-B: MEGOHMS Phase A-G: MEGOHMS
Phase B-C: MEGOHMS Phase B-G: MEGOHMS
Phase C-A: MEGOHMS Phase C-G: MEGOHMS

Tests breaker contact resistance (Low resistance ohmmeter)

Phase A Phase B Phase C

Test operate breaker - Test position

Trip device type Long time Short time Instantaneous Ground
Full- current trip test- settings and test results attached Full- current trip test- settings and test results attached Full- current trip test- settings and test results attached Full- current trip test- settings and test results attached Full- current trip test- settings and test results attached
Verify operation of trip indicators Verify operation of trip indicators Verify operation of trip indicators Verify operation of trip indicators Verify operation of trip indicators

Test operate breaker - Test position

Close from all local/remote close devices
Trip from all local/remote trip devices, including protective relays (if any)

Test operate breaker - Connected position

Close from all local/remote close devices
Trip from all local/remote trip devices, including protective relays
Technician: Sheet No.:

Identification

480 VOLT MOTOR CONTROL CENTER LINEUPS (T12)

Identification / Location: Identification / Location: Date:
Substation/MCC/Circuit No.: Manufacturer: Serial No.:
Bus Amp Rating: KA Interrupting Duty: Other:

Check Box

Check equipment for proper alignment and levelness Check components for identification
Check base bolted to floor Check CPT and PT fuses and voltage ratings
Check equipment for mechanical damage Inspect bus insulators for cleanliness
Check for removal of temporary supports Inspect ground connections to ground bus
Check door alignment and interlocks Inspect bus bolting for proper torque
Check tightness of all bolting Inspect incoming main cable termination details

Test Insulation Resistance - Main bus (2500V Megger -1Min.)

Phase A-B: MEGOHMS Phase A-G: MEGOHMS
Phase B-C: MEGOHMS Phase B-G: MEGOHMS
Phase C-A: MEGOHMS Phase C-G: MEGOHMS

Tests ground resistance of equipment ground bus (fall-of-potential method)

Note : See individual 480 volt motor circuit test sheets for each starter unit installed in this lineup.

The following test applies only to items that era not covered by other test sheets.

Test insulation resistance - instrument transformers (if any) (500V megger)

List Primary Secondary List Primary Secondary

Test CT and PT secondary circuits

CT current injection test (verify current signal to current devices)
PT voltage injection test (verify voltage signal to voltage devices)

Calibrate and test any protective relays and meters

Protective relay test sheet attached
Microprocessor meter unit setup and function checked

Tests cabinet space heaters (if any)

Verify space heaters and thermostat operation Record space heater amps:

Test power factor correction capacitors (if any)

Energized capacitors and verify rated current draw Record amps
Verify capacitor discharge resistor operation Verify capacitor discharge resistor operation
Technician: Sheet No.:

Identification

480 VOLT MOTOR CIRCUIT (T13)

Identification/Location: Identification/Location: Identification/Location: Date:
Substation/Circuit No.: Motor/Load Identification No.: Motor/Load Service Description: Motor/Load Service Description:

Starter Information

Manufacturer: Type/Style/Cat. No.: Nema Starter Size: Breaker Type and Rating:
Fuse Type and Size: Ct Ratio: Overload Type/Heater: Other:

Motor Information

Manufacturer: Type/Style/Serial No.: Voltage Rating: Horsepower:
Full Load Current: Service Factor: Speed: Feeder:

Check Box

Check motor/starter HP and voltage ratings Check equipment for area classification conformance
Check motor/equipment rotation direction and speed Check seals poured, breathers and drains installed
Check motor shaft and play and free rotation Inspect contactor operation, cleanliness, adjustment, and lubrication per the manufacturer's instructions
Check motor ground connections Inspect main fuses, CT ratios, and overloads for proper size and type
Check CPT and starter coil ratings Inspect wire terminations at motor and starter
Check size of power and control wires Inspect P.F. capacitors installation (wire, fuses, etc.)
Check cable/conduit tagging Inspect motor bearings and lubrication
Check nameplate- starter and control station Inspect motor space heater installation (if any)

Test continuity of wires

T 2 T 2 T 3 Gnd C 1 C 2 C 3 C 4 C 5 C 6 C 7

Test Insulation Resistance - 1000V Megger, 1 Min.

Phase 1 to 2/3 G MegOhms Motor Only to GND MegOhms
Phase 2 to 1/3 G MegOhms Motor + Feeder to GND MegOhms
Phase 3 to 1/3 G MegOhms

Test insulation resistance of control wires (500V megger )

C1 C2 C3 C4 C5 C6 C7

Verify overload protective device

Overload Heater Amp Range Other

Tests starter- motor leads disconnected

Close and trip starter from all control and protective devices Close and trip starter from all control and protective devices
Verify motor space heater operation (if any) Record motor space heater amps
Technician: Contractor: Sheet No.:

Identification

LOW VOLTAGE (120/208) POWER SYSTEMS (T14)

Identification / Location: Identification / Location: Identification / Location: Date:
Equipment Description: Equipment Description: Equipment Description: Equipment Description:
Panel board I.D. No.: Panelboard Main Breaker Size: Panelboard Voltage and Phase: Panelboard Voltage and Phase:
Transformer I.D. No.: Transformer KVA Size and No. of Phases: Transformer Voltages (pri./sec.): Transformer Voltages (pri./sec.):

Check Box

Check transformer KVA size, phase and voltage Check wiring sizes vs. breaker sizes
Check panelboard voltage, phase and bus amps Check for conformance to area classification and weatherproofing (if required)
Check panelboard main breaker size Check seals poured, breathers and drains installed
Check panelboard branch breaker sizes and quantity Inspect ground size and connection to transformer neutral
and equipment cases
Check panelboard directory filled out and legible Inspect transformer tap connections
Check wiring for conformance to color code Inspect tightness of panelboard

Test Insulation Resistance - Transformer (500V megger)

Transformer primary feeder A-B/C/G: A-B/C/G: B-A/C/G: C-A/B/G: (MEGOHMS)
Transformer primary windings Transformer primary windings MEGOHMS MEGOHMS MEGOHMS MEGOHMS
Transformer secondary windings Transformer secondary windings MEGOHMS MEGOHMS MEGOHMS MEGOHMS
Primary to grounded windings Primary to grounded windings MEGOHMS MEGOHMS MEGOHMS MEGOHMS

Test insulation resistance - Panelboard (500V megger)

Panelboard incoming feeder A-B/C/G: A-B/C/G: B-A/C/G: C-A/B/G: (MEGOHMS)
Panelboard bus (all breakers open) Panelboard bus (all breakers open) MEGOHMS MEGOHMS MEGOHMS MEGOHMS

Test insulation resistance - branch circuits to ground (500V megger)

Ckt. 1 Ckt. 7 Ckt. 13 Ckt. 19 Ckt. 25
Ckt. 2 Ckt. 8 Ckt. 14 Ckt. 20 Ckt. 26
Ckt. 3 Ckt. 9 Ckt. 15 Ckt. 21 Ckt. 27
Ckt. 4 Ckt. 10 Ckt. 16 Ckt. 22 Ckt. 28
Ckt. 5 Ckt. 11 Ckt. 17 Ckt. 23 Ckt. 29
Ckt. 6 Ckt. 12 Ckt. 18 Ckt. 24 Ckt. 30

Transformer taps

Set at tap position Primary tap volts = (from nameplate) Primary tap volts = (from nameplate)
Measured panelboard voltage: Unloaded Volts Loaded Volts

Load balance (transformer secondary or panelboard feeder)

Measured amps: Phase A: Amps Phase B: Amps Phase C: Amps
Technician: Sheet No.:

Identification

CONTROL, INSTRUMENTATION AND ALARM WIRING (T15)

Identification / Location: Date:
Equipment Designation: Equipment Designation:

Check Box

Check items for conformance to area classification
Check wiring for conformance to color code and identification
Check terminal strips and/or wiring for proper identification
Check all junction boxes for proper identification
Check for adequate unions, seals, breathers and drains
For direct process-connected devices, check for double seals or barriers to process breakthrough
Check conduits for proper tags

Test Insulation Resistance

Function Check

Test each device in circuit by actuating under simulated operating conditions
Verify proper operation of auxiliary items
Item Number Check Item Completed Insulation Resistance Megohms Function Check Completed Remarks
Technician: Sheet No.:

Identification

BATTERY SYSTEM INSPECTION AND TEST REPORT (T16)

Identification / Location: Date:
Equipment to Be Tested: Equipment to Be Tested:
Cell No Cell Volts Specific Gravity Water Added Cell Cell Specific Gravity Water Added Cell Cell Volts Specific Gravity Water Added
Cell No Cell Volts Specific Gravity Water Added No Volts Specific Gravity Water Added No Cell Volts Specific Gravity Water Added
1 21 41
2 22 42
3 23 43
4 24 44
5 25 45
6 26 46
7 27 47
8 28 48
9 29 49
10 30 50
11 31 51
12 32 52
13 33 53
14 34 54
15 35 55
16 36 56
17 37 57
18 38 58
19 39 59
20 40 60
Temp-Electrolyte: Spec. Gravity: DC Volts Charge:
DC Amps-Charge: Ground: DC Volts -Output:
Technician: Sheet No.:

Identification

ELECTRIC MOTOR INSPECTION AND TEST FORM (T17)

Plant Number/Unit: Substation: Date:
Motor Tag Number/Identification: Motor/ Load Service Description: Motor/ Load Service Description:

Motor Information

Manufacturer: Style/Type/ Frame and Serial No.: Voltage Rating: HP:
Full Load Amps: Serv. Factor: Rpm: Cable Size:

Check Box

Inspect contactor operation Inspect main and control fuses
Check operation of main switch Inspect/clean/replace air filters
Inspect wire cable connections Inspect motor space heaters
Perform operational test on starter Check motor ground connections
Inspect/ service push button Check O.L. heaters for proper size

Test insulation resistance of control wires (500V megger )

C1 C2 C3 C4 C5 C6 C7

Test Insulation Resistance of 480 Volt motor: (1000V megger - 1 min.)

Phase 1to 2/3/G: MEGOHMS Motor only to GRD.: MEGOHMS
Phase 2 to 1/3/G: MEGOHMS Motor Phases 1-2: MEGOHMS
Phase 3 to 1/2/G: MEGOHMS Motor Phases 2-3: MEGOHMS
Motor + Feeder to GND MEGOHMS Motor Phases 3-1: MEGOHMS

Test Insulation Resistance of 2400 Volt motor: (2500V megger )

Phase 1to 2/3/G: MEGOHMS Motor only to GRD.: MEGOHMS
Phase 2 to 1/3/G: MEGOHMS Motor Phases 1-2: MEGOHMS
Phase 3 to 1/2/G: MEGOHMS Motor Phases 2-3: MEGOHMS
Motor + Feeder to GND MEGOHMS Motor Phases 3-1: MEGOHMS
Technician: Sheet No.:

Identification

DC HIGH POTENTIAL TEST (T18)

Identification/Location: Identification/Location: Identification/Location: Date:
Equipment to Be Tested: Equipment to Be Tested: Equipment to Be Tested: Equipment to Be Tested:
Substation/Circuit No.: Equipment Voltage Rating: Final Test Voltage and Hold Time: Final Test Voltage and Hold Time:

Check Box

Check satisfactory insulation resistance test performed
Check equipment prepared for DC hipot
Check devices not rated for hipot voltage have been disconnected
Check all safety barriers in place and area roped of (including opposite end of cables)
Check for adequate grounding tools and high voltage gloves

Test Results and Leakage Graph

Time (min)
Volts (KV)
amp ph. A
amp ph. B
amp ph. C

Plot micro amps for each phase from table above.

Test Equipment Used: Brand: Calibration Date:
Technician: Sheet No.:

Identification

MEDIUM VOLTAGE SWITCHGEAR LINEUPS (T19)

Identification / Location: Identification / Location: Identification / Location: Date:
Substation / Circuit No.: Manufacturer: Serial No. Serial No.
Voltage Rating: Bus Rating: MVA Interrupting Duty: MVA Interrupting Duty:

Check Box

Check switchgear for proper alignment and levelness Inspect bus bolting for proper torque
Check foundation bolts or welds Inspect bus insulators for cleanliness
Check switchgear for mechanical damage Inspect ground connections to ground bus
Check for removal of blocking and jumpers Check for tightness of all bolting
Inspect pt disconnect and grounding mechanisms Inspect connections to high resistance ground unit
Check CPT and PT fuses and voltage ratings Inspect dc close and trip power for polarity and fuses
Check components for identification Inspect main incoming termination details

Test Insulation Resistance - Switchgear bus: (2500V megger - 1 min.)

Phase A-B: MEGOHMS Phase A-G: MEGOHMS
Phase B-C: MEGOHMS Phase B-G: MEGOHMS
Phase C-A: MEGOHMS Phase C-G: MEGOHMS

DC HIPOT test - Switchgear bus

Test report attached Final test voltage =
Test result acceptable Remarks:

Test insulation resistance - instrument transformers (500V megger LV side, 2500V megger HV side)

List LV Megs HV Megs List LV Megs HV Megs

Test CT and PT secondary circuits

CT current injection test (Verify current signal to current devices)
PT voltage injection test (Verify voltage signal to voltage devices)

Calibrate and test all protective relays and meters

Protective relay test sheet attached
Microprocessor meter unit setup and function checked

Tests high resistance ground fault unit

Tests ground resistance of switchgear ground bus (fall-of-potential method)

Tests switchgear space heaters (if any)

Verify space heater and thermostat operation Record space heater amps
Technician: Sheet No.:

Identification

MEDIUM VOLTAGE NEMA CLASS E2 STARTER LINEUPS (T20)

Identification / Location: Identification / Location: Identification / Location: Date:
Substation/MCC/Circuit No. Manufacturer: Serial No. Serial No.
Voltage Rating Bus Rating MVA Interrupting Duty MVA Interrupting Duty

Check Box

Check equipment for proper alignment Check components for identification
Check base bolted to floor Inspect bus bolting for proper torque
Check equipment for mechanical damage Inspect bus insulators for cleanliness
Check for removal of blocking and jumpers Inspect ground connections to ground bus
Check tightness of all bolting Inspect pt disconnect and grounding mechanics
Check CPT and PT fuses and voltage ratings Inspect incoming main cable termination details

Test Insulation Resistance - Main bus (2500V Megger -1Min.)

Phase A-B: MEGOHMS Phase A-G: MEGOHMS
Phase B-C: MEGOHMS Phase B-G: MEGOHMS
Phase C-A: MEGOHMS Phase C-G: MEGOHMS

Tests ground resistance of equipment ground bus (fall-of-potential method)

Note : See individual motor circuit test sheets for each starter unit installed in this lineup. See separate load break switch test sheets for any switches installed in this lineup. The following test applies only to items that era not covered by other test sheets.

Test insulation resistance - instrument transformers (if any) (500V megger LV side, 2500V megger HV side)

List LV Megs HV Megs List LV Megs HV Megs

Test CT and PT secondary circuits

CT current injection test PT voltage injection test

Calibrate and test any protective relays and meters

Protective relay test sheet attached
Microprocessor meter unit setup and function checked

Tests cabinet space heaters (if any)

Verify space heaters and thermostat operation Record space heater amps:
Technician: Sheet No.:

Identification

UNINTERRUPTABLE POWER SYSTEMS UPS (T21)

Identification / Location: Date:
Equipment Designation: Equipment Designation:
Nameplate Data Nameplate Data Nameplate Data Nameplate Data Nameplate Data Nameplate Data
Manufacturer: Model #: Serial Number
KVA/KW:
Input
Voltage: Hz: Number of Wires:
Amps Nominal: Amps Max: Number of Phases:
DC
Voltage: Max Amps:
Output
Voltage: Hz: Number of Wires:
Amps Maximum: KVA/KW Number of Phases:
Power Factor:
Battery
Manufacturer: Model: Type:
Number of Cells: Number of Jars: Number of Strings:
Other:

Check Box

Compare equipment nameplate information with drawings and specifications Test DC undervoltage trip level on inverter input breaker. Set according to manufacturer's published data
Inspect physical and mechanical condition. Verify that filters are in place and/or vents are clear
Check for correct anchorage, required area clearances
and alignment.
Test static transfer from inverter to bypass and back. Use
normal load, if possible.
Verify that fuse sizes and types correspond to drawings Test all electrical and mechanical interlock systems for
correct operation and sequencing
Check operation of forced ventilation Torque all bolted electrical connections
Test alarm circuits Verify sync indicators for static switch and bypass switches
Verify free-running frequency of oscillator

Electrical Tests

Bolted Connection Resistance in microhms Bolted Connection Resistance in microhms Bolted Connection Resistance in microhms Bolted Connection Resistance in microhms Bolted Connection Resistance in microhms Bolted Connection Resistance in microhms Bolted Connection Resistance in microhms Bolted Connection Resistance in microhms Bolted Connection Resistance in microhms Bolted Connection Resistance in microhms Bolted Connection Resistance in microhms
Phase A Phase A Phase B Phase B Phase C Phase C Neutral Neutral Ground Ground
Line As found As left As found As left As found As left As found As left As found As left
Line
Load
Bypass
Battery
Other
UPS Overall Condition: Poor Average Good
Technician: Sheet No.:

Identification

LOW VOLTAGE STARTER (T22)

Tag Number / Location: Tag Number / Location: Tag Number / Location: Date:
Substation / Circuit No.: Motor/ Load Identification: Motor/ Load Service Description: Motor/ Load Service Description:

Starter Information

Manufacturer: Serial/ S.O. No.: Voltage Rating: Amp Rating:
Fuse Type and Size: CT Ratio: Overload Type: Other:
Starter Type: Vacuum Vacuum Air-Break Oil-immersed

Check Box

Check starter for proper alignment in cell. Check components for identification.
Check for proper roll-in and roll-out of starter. Inspect manual operation of starter.
Check starter for mechanical damage. Inspect operation of mechanical trip function.
Check for removal of blocking and jumpers. Inspect dc close and trip power for polarity and fuses.
Check for tightness of all bolting. Inspect incoming/outgoing cable termination details.
Inspect operation of starter drawout mechanisms including mechanical interlocks, position indicators, shutters and safety features. Inspect air or oil starter contact surfaces, wipe, alignment and lubrication per manufacturer's instructions.
Inspect starter parts for cleanliness and proper lubrication. Inspect ground connections to ground bus.
Check CPT and PT fuses and voltage ratings.

Test Insulation Resistance of circuit starter, closed position: (1000Vdc megger - 1 min.)

Phase A-B: MEGOHMS Phase A-G: MEGOHMS
Phase B-C: MEGOHMS Phase B-G: MEGOHMS
Phase C-A: MEGOHMS Phase C-G: MEGOHMS
Motor + Feeder to GND MegOhms Motor + Feeder to GND MegOhms

Test insulation resistance of control wires (500V megger )

C1 C2 C3 C4 C5 C6 C7

Tests starter contact resistance (Low resistance ohmmeter)

Phase A Phase B Phase C

Test CT and PT secondary circuits and calibrate and test any protective relays and meters

CT current injection test PT voltage injections test
Protective relay test sheet attached

Test cabinet space heaters (if any)

Verify space heaters and thermostat operation Record space heater amps:

Test operate starter - Test position

Close from all local/remote close devices Trip from all local/remote trip devices, including protective relays

Test operate starter - Connected position

Close from all local/remote close devices Close from all local/remote close devices Close from all local/remote close devices Trip from all local/remote trip devices, including protective relays Trip from all local/remote trip devices, including protective relays
Starter Condition: Poor Average Average Good
Technician: Sheet No.:

Identification

GENERATOR STATOR INSULATION TESTING MEGGER (T23)

Identification / Location Date
Generator Identification No. Generator Identification No.

Generator Information

Manufacturer Type / Style/ Serial No. Voltage Rating MVA
Full Load Current Full Load Current Service Factor Service Factor

DC Insulation Resistance (M-ohms)

Voltage: Volts
Time
Minutes
A- LEFT South B - CENT. C- RIGHT North
1
5
10
PI

High Voltage Proof Test (one minute test on each phase with the other phases grounded)

Rated Voltage (E) Rated Voltage (E) KVAC
Test at: Test at: Test at: Recommended test voltage: Recommended test voltage:
60 HZ AC test voltage (60 HZ) KV
DC DC test voltage KV
Actual test voltage KVDC
Left Center Right
Passed test at
Failed test at
Surge test
Technician: Sheet No.:

Identification

GENERATOR STATOR DC-LEAKAGE (T24)

Identification / Location Date
Generator Identification No. Generator Identification No.

Generator Information

Manufacturer Type / Style/ Serial No. Voltage Rating MVA
Full Load Current Service Factor Speed
% of 10 KV "C" Phase LEFT "B" Phase CENTER "A" Phase RIGHT "C" Phase LEFT "B" Phase CENTER "A" Phase RIGHT "C" Phase LEFT "B" Phase CENTER "A" Phase RIGHT
% of 10 KV Time KV uA Time KV uA Time KV uA
1 1 1
2 2 2
3 3 3
4 4 4
5 5 5
Megohms @ KV Micro Amp Leakage @ Micro Amp Leakage @ KVDC
C-Left B-Center A-Right C-Left B-Center B-Center A-Right
Technician: Sheet No.:

Identification

GENERATOR ROTOR WINDING RESISTANCE TESTING (T25)

Identification / Location Date
Generator Identification No. Generator Identification No.

Generator Information

Manufacturer Type / Style/ Serial No. Voltage Rating MVA
Full Load Current Full Load Current Service Factor Service Factor
Turbine End Turbine End Turbine End
C- 3 B-2 A - 1
Collector End Collector End Collector End
C - 3 B - 2 A - 1
Resistance @ OC
Resistance Corrected to 25OC
Factory Resistance @ 25OC
Technician: Sheet No.:

Identification

GENERATOR STATOR WINDING RTD MEASUREMENTS (T26)

Identification / Location Date
Generator Identification No. Generator Identification No.

Generator Information

Manufacturer Type / Style/ Serial No. Voltage Rating MVA
Full Load Current Full Load Current Service Factor Service Factor

TE Terminal Board

RTD Number Resistance after HI POT Resistance after HI POT Resistance after HI POT Resistance after HI POT Indicated
Temperature
Indicated
Temperature
Position
RTD Number R-W R-W W-W RW-WW Indicated
Temperature
Indicated
Temperature
Position
RTD Number R-W R-W W-W RW-WW OF OC Position

CE Terminal Board

RTD Number Resistance after HI POT Resistance after HI POT Resistance after HI POT Resistance after HI POT Indicated
Temperature
Indicated
Temperature
Position
RTD Number R-W R-W W-W RW-WW Indicated
Temperature
Indicated
Temperature
Position
RTD Number R-W R-W W-W RW-WW OF OC Position
Technician: Sheet No.:

(T27)

Identification

VISUAL AND MECHANICAL INSPECTION ( T28)

Identification / Location Date
Equipment Designation Equipment Designation

Nameplate Data

Manufacturer: Model Number: Serial Number:
KVA/KW:
INPUT
Voltage: Hz: Number of Wires:
DC
Amps Nominal: Amps Max: Number of Phases:
Voltage Max Amps:
OUTPUT
Voltage: Hz: Number of Wires:
Amps Maximum: KVA/KW Number of Phases:
Power Factor:

Check Box

Compare equipment nameplate information with drawings and specifications. Inspect terminals for loose or broken connections, or burned insulation.
Inspect Physical and mechanical condition. Verify that filters are in place and/or vents are clear.
Check for correct anchorage, required area clearances, and alignment. Check for proper operation of the cabinet strip heater and thermostat.
Verify that fuse sizes and types correspond to drawings. Verify all installed potentiometers and rheostats ohm value are specified on the interconnect diagram.
Check operation of forced ventilation. Torque all bolted electrical connections.
Test alarm circuits. Check for proper operation of the cabinet light and convenience outlet.
Inspect all indication devices for proper operation. Verify protective relay settings as indicated on the setting tables.
Inspect all parts for evidence overheating. Check for safety hazards missing parts, loose wires, etc.

Exciter

Overall Condition: Poor Average Good
Technician: Sheet No.:

IDENTIFICATION

STATIC SHUNT EXCITER SYSTEMS ELECTRICAL TESTING (T29)

Identification / Location Date
Equipment Designation Equipment Designation

Nameplate Data

Manufacturer: Model Number: Serial Number:
KVA/KW:
INPUT
Voltage: Hz: Number of Wires:
Amps Nominal: Amps Max: Number of Phases:
DC
Voltage Max Amps:
OUTPUT
Voltage: Hz: Number of Wires:
Amps Maximum: KVA/KW Number of Phases:
Power Factor:

Test Insulation Resistance - on power feeder cables (See EE-PM-011 procedure Table 11-1 for test voltages)

Test report attached Test result acceptable

Bolted Connection Resistance in micro ohms (across each breaker, fuse holder, contactor)

Test report attached Test result acceptable

Test CT and PT secondary circuits

CT current injection test ( Verify current signal to current devices)
PT voltage injection test ( Verify voltage signal to voltage devices)

Calibrate and test all protective relays and meters

Perform System Alarm Tests

Verify the Auto/Man Circuits

Perform Shutdown and Interlock Tests

Perform Exciter Control Function Tests (See EE-PM-011 procedure Section 1.3)

Test result acceptable (Turbine Stopped) Test result acceptable (Turbine Running Generator Off-Line)
Test result acceptable (Turbine Running- Generator On-line) Test result acceptable (Turbine Running- Generator On-line)
Remarks: Remarks:

Exciter

Overall Condition: Poor Average Good
Technician: Sheet No.:

MEDIUM VOLTAGE MOTOR CONTROL CENTER (MCC) INSPECTION AND TESTING (T30)

Identification

Identification / Location Identification / Location Identification / Location Date
Substation/MCC/Circuit No. Manufacturer Serial No. Serial No.
Bus Amp Rating KA Interrupting Duty Other Other

Check Box

Compare nameplate data with drawings and specs. Verify fuse, circuit breaker sizes and types.
Inspect physical and mechanical condition. Verify PT and CT ratios.
Inspect for evidence of moisture, heating or corona. Inspect bus insulators for cleanliness.
Verify appropriate anchorage, correct alignment and clearance. Inspect ground connections to ground bus.
Check bus connections. Inspect all mechanical indicating devices.
Inspect door panels and sections for corrosion, dents and hardware. Check mechanical interlocks details.

Test Insulation Resistance - Main Bus and Bus Sections (2500 Vdc Megger - in Megaohms @)

Phase A-B: MEGOHMS Phase A-G: MEGOHMS
Phase B-C: MEGOHMS Phase B-G: MEGOHMS
Phase C-A: MEGOHMS Phase C-G: MEGOHMS

Tests ground resistance of equipment ground bus (fall-of-potential method)

Note : See individual 2.4kV volt motor circuit test sheets for each starter unit installed in this lineup.

The following test applies only to items that are not covered by other test sheets.

Test insulation resistance - instrument transformers (if any) (500V megger)

List Primary Secondary List Primary Secondary

Test CT and PT secondary circuits

CT current injection test (Verify current signal to current devices)
PT voltage injection test (Verify voltage signal to voltage devices)

Calibrate and test any protective relays and meters

Protective relay test sheet attached
Microprocessor meter unit setup and function checked

Tests cabinet space heaters (if any)

Verify space heaters and thermostat operation Record space heater amps:
Technician: Sheet No.:

GROUNDING RESISTOR TESTING (T31)

Identification

Identification / Location: Identification / Location: Date:
Substation / Circuit No. Manufacturer: Serial No.
Resistor Voltage Rating Resistor Amp Rating Resistor Ohm / Duty in seconds
Resistor Type: Low Resistance High Resistance Open Frame Enclosed Other Resistor Type: Low Resistance High Resistance Open Frame Enclosed Other Resistor Type: Low Resistance High Resistance Open Frame Enclosed Other

Visual Inspection Check Box

Compare equipment nameplate information with drawings & specifications Check ground circuit from the transformer neutral bushing to the ground resistor and to
earth ground point.
Inspect enclosure and accessories for cleanliness and
damage
Checked for cracked insulators or bushings
Check wiring signs of damage from heat or overloads Verify the CT ( if provided) ratio and all
connection to the Junction Box.
Check the enclosure for signs or damage from wheather
or rodents.
Inspect electrical connections for discoloration
and degradation.
Inspect for loose connections, tighten as required. Check Neutral and Ground connections
properly tagged.
Check all foreign debris vacuumed from enclosure Check high voltage cable properly routed.

Resistor Stack DC Insulation Resistance to protective enclosure: (See EE-PM-013 procedure Table 13-2 for test voltages)

Mega Ohms Test Result Acceptable

Resistor Assembly DC Insulation Resistance to the system ground : (See EE-PM-013 procedure Table 13-2 for test voltages)

Mega Ohms Test Result Acceptable

Resistance Tolerance (Ohm meter reading between neutral and ground side should be within 10% of name plate)

Maximum Minimum Measured % Difference

Grounding Resistor

Overall Condition: Poor Average Good
General comments :
Technician: Sheet No.: