*1.
*2.
MAXIMUM TEMPERATURE & PRESSURE MAXIMUM TEMPERATURE & PRESSURE MAXIMUM TEMPERATURE & PRESSURE MAXIMUM TEMPERATURE & PRESSURE MAXIMUM TEMPERATURE & PRESSURE MAXIMUM TEMPERATURE & PRESSURE MAXIMUM TEMPERATURE & PRESSURE MAXIMUM TEMPERATURE & PRESSURE
*1.
*2.
PROCESS/FUEL GAS: PROCESS/FUEL GAS: PROCESS/FUEL GAS: REDUCING (% CO) REDUCING (% CO) REDUCING (% CO)
OXIDIZING (% o2 EXCESS) OXIDIZING (% o2 EXCESS) OXIDIZING (% o2 EXCESS)
SULFUR (%) SULFUR (%) SULFUR (%)
VANADIUM (PPM) VANADIUM (PPM) VANADIUM (PPM)
SODIUM (PPM) SODIUM (PPM) SODIUM (PPM)
PH PH PH
3. EROSION: EROSION: EROSION: MILD MILD MILD
3. EROSION: EROSION: EROSION: SERVE SERVE SERVE
4. MECHANICAL VIBRATION: *5. *5. CYCLIC OPERATION: CYCLIC OPERATION: CYCLIC OPERATION: CYCLIC OPERATION:
*6. THERMAL SHOCK: 7. 7. SHELL COATING: SHELL COATING: SHELL COATING: SHELL COATING:
8. SHROUD: 9. 9. NOZZLE LINERS: NOZZLE LINERS: NOZZLE LINERS: NOZZLE LINERS:
10. END/TAPER RINGS:
11. VESSEL: LENGTH T/T SHELL MATERIAL DIAMETER _____________ _________ VESSEL: LENGTH T/T SHELL MATERIAL DIAMETER _____________ _________ VESSEL: LENGTH T/T SHELL MATERIAL DIAMETER _____________ _________ VESSEL: LENGTH T/T SHELL MATERIAL DIAMETER _____________ _________ VESSEL: LENGTH T/T SHELL MATERIAL DIAMETER _____________ _________ VESSEL: LENGTH T/T SHELL MATERIAL DIAMETER _____________ _________ VESSEL: LENGTH T/T SHELL MATERIAL DIAMETER _____________ _________ VESSEL: LENGTH T/T SHELL MATERIAL DIAMETER _____________ _________
12. ANCHOR: ANCHOR: HOT FACE HOT FACE BACK UP
12. ANCHOR: ANCHOR: MATERIAL MATERIAL MATERIAL
12. ANCHOR: ANCHOR: SPACING SPACING SPACING
12. ANCHOR: ANCHOR: HEIGHT HEIGHT HEIGHT
12. ANCHOR: ANCHOR: TYPE TYPE TYPE
*13. FIBERS (MATERIAL AND SIZE): FIBERS (MATERIAL AND SIZE): STAINLESS STAINLESS STAINLESS
*13. FIBERS (MATERIAL AND SIZE): FIBERS (MATERIAL AND SIZE): NON-METALLIC NON-METALLIC NON-METALLIC
*14. REFRACTORY THICKNESS: REFRACTORY THICKNESS: REFRACTORY THICKNESS: REFRACTORY THICKNESS: REFRACTORY THICKNESS: REFRACTORY THICKNESS: REFRACTORY THICKNESS: REFRACTORY THICKNESS:
*15.
*16. ADDITIONAL: ADDITIONAL: ADDITIONAL: ADDITIONAL: ADDITIONAL: ADDITIONAL: ADDITIONAL: ADDITIONAL:
* ITEMS REQUIRING DATA BY OWNER AS AVAILABLE * ITEMS REQUIRING DATA BY OWNER AS AVAILABLE * ITEMS REQUIRING DATA BY OWNER AS AVAILABLE * ITEMS REQUIRING DATA BY OWNER AS AVAILABLE * ITEMS REQUIRING DATA BY OWNER AS AVAILABLE * ITEMS REQUIRING DATA BY OWNER AS AVAILABLE * ITEMS REQUIRING DATA BY OWNER AS AVAILABLE * ITEMS REQUIRING DATA BY OWNER AS AVAILABLE * ITEMS REQUIRING DATA BY OWNER AS AVAILABLE
BID FINAL
DESIGN APPROVAL
FINAL RECORDS
1. MANUFACTURER & PRODUCT DESIGNATION FOR PROPOSED LINING MATERIAL (INC. CHEMICAL COMPOSITION) X X
2. TYPE OF PACKING FOR SHIPMENT X X
3. COLD FACE AND HEAT LOSS CALCULATIONS X X
4. REFRACTORY THERMAL CONDUCTIVITY AT DESIGN TEMP., AND METHOD USED TO OBTAIN VALVES X X
5. MAXIMUM ALLOWABLE LONG TERM SERVICE TEMP. X X
6. COMPRESSIVE STRENGTH, PERMANENT LINEAR CHANGE. ABRASION RESISTANCE (AS APPLICABLE) & DENSITY IN THE 230 OF FRIED AND INSTALLED CONDITION AND AT 1500 OF, AND METHOD USED TO OBTAIN VALUES X X
7. MODULUS OF RUPTURE (HOT AND COLD) X X
8. ANCHOR SYSTEM DESIGN: TYPE, MAT’L, SIZE, SPACING X X
9. IDENTITY OF BINDER CEMENT USED IN CASTABLES X X
10. MATERIAL SAFETY DATA SHEETS FOR ALL MATERIALS X X
11. QUANTITY OF MATERIAL NEEDED, INCLUDE RECOMMENDED OVERAGE X X
12. REFRACTORY SHELF LIFE AND STORAGE REQUIREMENTS X X
13. NAME AND DESCRIPTION OF PROTECTIVE SHELL COATING X X
14. NAME AND DESCRIPTION OF FIBER ADDITIONS X X
15. INSTALLATION PROCEDURES: SURFACE PREPARATIONS, LINING APPLICATIONS, WATER RATIO, MIXING AND PRE DAMPENING INSTRUCTIONS, PNEUMATIC GUN SETTINGS, ETC. (AS APPLICABLE) X X
16. DETAILS ON FORMS TO BE USED (THICKNESS, BRACING, AND HOW REMOVED) X X
17. TYPE, SIZE AND METHOD OF ATTACHMENT OF VIBRATORS X X
18. DETAILS OF MOCK-UP TEST PROPOSED TO DEMONSTRATE ACCEPTABILITY OF VIBRATION CASTING PROCEDURES X
19. WELDING PROCEDURES AND TESTING METHODS FOR ANCHORS, AND OTHER METALLIC COMPONENTS X
20. METHOD OF CURING, NAME, AND DESCRIPTION OF CURING COMPOUND (AS APPLICABLE) X
21. TIME FROM MANUFACTURE TO SHIPMENT OF REFRACTORY X
22. RECOMMENDED DRYOUT SCHEDULE AND METHODOLOGY (I.E. SOURCE OF HEAT), CONTROL, ETC.) X
BID FINAL DESIGN APPROVAL FINAL RECORD
S
23. DESIGN DETAILS AT JOINTS, PANELS, DISCONTINUITIES (EX. NOZZLES) X
24. APPROVED DRYOUT SCHEDULE X
25. FIELD VERIFICATION OF INSTALLED MATERIAL AND THICKNESS X
26. MILL TESTS AND TEST RESULTS FOR ALL TESTS OF ANCHOR MATERIAL AND REFRACTORY SAMPLES MADE AT THE MANUFACTURER’S PLANT AND DURING INSTALLATION. X
* OTHER * OTHER * OTHER * OTHER * OTHER
* PURCHASER SHALL FILL OUT AS REQUIRED * PURCHASER SHALL FILL OUT AS REQUIRED * PURCHASER SHALL FILL OUT AS REQUIRED * PURCHASER SHALL FILL OUT AS REQUIRED * PURCHASER SHALL FILL OUT AS REQUIRED