Section 10 — Material Requirements
IPE Engineering Practice IPE-EP-10-0-0
Document number: IPE-EP-10-0-0 · Section: 10 — Material Requirements
TITLE ......................................................................................................................... EP REV
No. No.
Table of Contents................................................................................................10–0–0 1.0
Crude Units .........................................................................................................10–1–1 1.0
Naphtha Pretreaters............................................................................................10–1–2 1.0
Catalytic Reformers ............................................................................................10–1–3 1.0
Catalytic Hydrodesulfurizers ...............................................................................10–1–4 1.0
FCC Units ...........................................................................................................10–1–5 1.0
TCC Units ...........................................................................................................10–1–6 1.0
Unsaturate Gas Plants........................................................................................10–1–7 1.0
Delayed Cokers ..................................................................................................10–1–8 1.0
Hydrocrackers.....................................................................................................10–1–9 1.0
HF Alkylation Units – Phillips ............................................................................10–1–10 1.0
HF Alkylation Units – UOP................................................................................10–1–11 1.0
H2 SO4 Alkylation Units....................................................................................10–1–12 1.0
Saturate Gas Plants..........................................................................................10–1–13 1.0
Amine Plants .....................................................................................................10–1–14 1.0
Sulfur Plants......................................................................................................10–1–15 1.0
Hydrogen Plants ...............................................................................................10–1–16 1.0
Isomerization Units ...........................................................................................10–1–17 1.0
Sour Water Strippers ........................................................................................10–1–18 1.0
Material Requirements for Aggressive Environmental Services ........................10–2–1 1.0
Material Requirements for Aggressive Environmental Services
Data Sheet .....................................................................................................10–2–1DS 1.0
Supplemental Material Requirements for Metallic Materials ..............................10–2–2 1.0
Material Hardness Requirements .......................................................................10–2–3 1.0
Statically Cast Steel and Alloy Return Bends and Tube Supports
for Fired Heaters .................................................................................................10–2–4 1.0
Statically Cast Steel and Alloy Return Bends and Tube Supports for Fired
Heaters Inspection Checklist ........................................................................... 10–2–4C 1.0
Shop Painting......................................................................................................10–3–1 1.0
Field Painting ......................................................................................................10–3–2 1.0
Corrosion Protection for Underground Piping.....................................................10–3–3 1.0
Protective Coatings for Heat Exchangers...........................................................10–3–4 1.0
Cathodic Protection for Heat Exchangers “Anode” Installation ..........................10–3–5 1.0
Cathodic Protection for Tank Bottoms ................................................................10–3–6 1.0
Internal Lining and Resin Repair ........................................................................10–3–7 1.0
Galvanized Coatings...........................................................................................10–3–8 1.0
Evaluation of Equipment in AES Service (Future Release)................................10–4–1 1.0
Evaluation of Equipment in Hydrogen Service (Future Release) .......................10–4–2 1.0
© 2026 Inflection Point Engineering, LLC. All rights reserved. The content of this page — including calculation methods, reference data, written analysis, interactive tools, and source code — is the intellectual property of Inflection Point Engineering, LLC and is protected under applicable copyright, trademark, and trade secret laws. Unauthorized reproduction, redistribution, modification, or derivative use in whole or in part is prohibited without prior written consent.
Disclaimer. This material is provided for informational and educational purposes only and does not constitute professional engineering advice. Calculations, reference data, and methodologies are based on published standards and accepted engineering practice but are not a substitute for engineering judgment, site-specific analysis, or review by a licensed Professional Engineer. Inflection Point Engineering, LLC makes no warranties, express or implied, regarding the accuracy, completeness, or fitness for a particular purpose of any content presented here, and shall not be liable for any direct, indirect, incidental, or consequential damages arising from its use. Users assume all risk associated with applying this content to real-world design, operations, or decisions.
© 2026 Inflection Point Engineering, LLC. All rights reserved.