Inflection Point Engineering Section 8 — Heat Transfer Equipment

Double Pipe Heat Exchanger Inspection Checklist

IPE Engineering Practice IPE-EP-8-1-5C

Document number: IPE-EP-8-1-5C · Section: 8 — Heat Transfer Equipment

THE MANUFACTURER OF EQUIPMENT PURCHASED BY IPE COMPANY SHALL BE RESPONSIBLE FOR MEETING ALL APPLICABLE REQUIREMENTS OF THE IPE ENGINEERING PRACTICES AND OTHER DOCUMENTS REFERENCED THEREIN REGARDLESS OF WHETHER THE ITEMS ARE INSPECTED BY A IPE REPRESENTATIVE.

REFERENCES

THE LATEST EDITION OF THE FOLLOWING STANDARDS AND PUBLICATIONS ARE REFERRED TO HEREIN

IPE ENGINEERING PRACTICES

EP 7-1-1 PRESSURE VESSELS

EP 7-1-4SUPPLEMENTAL REQUIREMENTS FOR PRESSURE VESSELS EP 7-1-5WELDING REQUIREMENTS FOR PRESSURE VESSLES

EP 8-1-5DOUBLE PIPE HEAT EXCHANGERS EP 8-1-8TUBE TO TUBESHEET JOINTS

EP 8-1-9TUBE MATERIAL AND SELECTION

EP 10-2-2SUPPLEMENTAL REQUIREMENTS FOR METALLIC MATERIALS EP 10-3-1SHOP PAINTING

EP 15-1-4 POSITIVE MATERIAL IDENTIFICATION (PMI)

FREQUENCY OF CONTACT BY THE INSPECTOR (CHECK ONE)

LEVEL L: ON CALL BY FABRICATOR LEVEL 2: ONCE EVERY TWO WEEKS LEVEL 3: EVERY WEEK

LEVEL 4: DAILY

LEVEL 5: RESIDENT

LEVEL 6. OTHER, SPECIFY

LEVEL OF INSPECTION BY THE INSPECTOR (CHECK ONE)

LEVEL 1: PREFABRICATION MEETING, DOCUMENT REVIEW, AND FINAL INSPECTION

LEVEL 2: PREFABRICATION MEETING, DOCUMENT REVIEW. REVIEW ITEMS. AND FINAL INSPECTION LEVEL 3: PREFABRICATION MEETING. DOCUMENT REVIEW, REVIEW ITEMS. WITNESS POINTS, AND FINAL

INSPECTION

LEVEL 4: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, WITNESS POINTS, HOLD POINTS, AND FINAL INSPECTION

LEVEL 5. OTHER, SPECIFY

DOCUMENT REVIEW (SHOP INSPECTOR SHALL REVIEW)

DOCUMENT DESCRIPTION
(REFERENCES TO EP 7-1-1, UNLESS OTHERWISE NOTED)
INSPECTOR’S INITIALS (REVIEW COMPLETE) DATE
IPE PURCHASE DOCUMENTS
DRAWINGS AND SPECIFICATIONS
DOCUMENTATION (EP 7-1-4, 6.0)
QUALITY CONTROL MANUAL (EP 7-1-4: 5.3)
QUALITY CONTROL PLAN (5.0, EP 7-1-4: 5.3.3)
MATERIAL RECEIVING SIGN-OFF
MATERIAL REQUIREMENTS (6.1)
MATERIAL TEST REPORTS
TEST EQUIPMENT CALIBRATION CERTIFICATIONS
WELDING PROCEDURE SPECS (EP 7-1-5: 7.0)
WELDER QUALIFICATION RECORDS (EP 7-1-5: 9.0)
NDE PROCEDURES
NDE TEST REPORTS
NDE PERSONNEL CERTIFICATION
FABRICATION PLAN/SHOP TRAVELER
IDENTIFICATION OF CRITICAL DIMENSIONS
DAILY COATING INSPECTION REPORT (EP 10-3-1)
SUB-CONTRACTOR Q/C REPORTS
AS-BUILT DATA SHEET (4.1)
NAME PLATE RUBBINGS AND/OR CODE
PRESSURE VESSEL DATA BOOK (EP 7-1-4: 6.3)
PWHT PROCEDURES ( 8.5)
AUTHORIZED WAIVERS AND/OR DEVIATIONS REVIEW
REVIEW OF SUBORDERS OF UNPRICED PURCHASE ORDERS TO SUB-VENDORS FOR COMPLIANCE WITH IPE ENGINEERING PRACTICE

GENERAL FABRICATION INSPECTION REQUIREMENTS (ALL FABRICATED EQUIPMENT)

R CHECK: THE SHOP INSPECTOR SHALL REVIEW DOCUMENTED RESULTS OF INSPECTION PERFORMED BY VENDOR'S INSPFCTOR OR SUBCONTRACTED INSPECTOR.

W CHECK: INDICATES THE SHOP INSPECTOR SHALL WITNESS ITEMS DURING FABRICATION SHOP SHALL NOTIFY INSPECTOR 2 DAYS IN ADVANCE OF FABRICATION POINT BUT NEED NOT HOLD PRODUCTION FOR INSPECTION.

H CHECK: INDICATES THE SHOP INSPECTOR SHALL INSPECT ITEMS DURING HOLD ON FABRICATION. SHOP SHALL NOTIFY INSPECTOR FIVE DAYS IN ADVANCE OF FABRICATION POINT AND SHALL NOT CONTINUE AFFECTED PRODUCTION UNTIL INSPECTOR PERFORMS AND IMPROVES FABRICATION AFTER INDICATED INSPECTION.

R W H INSPECTION/TESTING ACTIVITY (REFERENCES TO EP 7-1-1, UNLESS OTHERWISE NOTED) INSPECTOR’S INITIALS (REVIEW COMPLETE) DATE
SPECIAL MATERIAL REQUIREMENTS (EP 10-2-2)
FIT-UPS WELD ROOTS/WELD BEVELS
SPECIAL FORGINGS TESTING REQUIREMENTS
FLATNESS CHECK OF GASKET CONTACT SURFACE AFTER PWHT (7.11.1)
GENERAL FABRICATION CHECKS (8.1)
GENERAL WELDING FABRICATION CHECKS (8.2)
REINFORCING PAD GAP ALLOWANCE (8. 3)
SPECIAL FORGING FORMING REQUIREMENTS (8.4)
PWHT PREPARATIONS (8.5)
REVIEW OF COLD WORKED PARTS PWHT REQUIREMENTS
NAMEPLATE REQUIREMENTS (8.5)
DIMENSIONAL CHECKS (8.7)
TEMPLATE CHECK (8.7)
CLEANLINESS CHECK PRIOR TO FINAL INSPECTION (9.1)
PMI OF ALL APPLICABLE MATERIALS (EP 15-1-4)
RT LOCATION SELECTION
RT REVIEW (9.2)
RT OF WELDS IN COLD WORKED PARTS (9.2)
WFMT OF WELDS IF VESSELS IN AES (9.4)
MT/PT OF DOUBLE WELDED GROOVE JOINTS (9.4)
MT/PT OF SPECIFIED AREAS (9.4)
MT/PT OF SPECIFIED AREAS OF 100% RT VESSEL (9.4)
MT/PT OF UNRADIOGRAPHICABLE NOZZLES (9.4)
NDE OF REPAIRS
REINFORCING PAD PRESSURE TEST (11.0)
PROGRESSIVE FORMING/MACH.
ASSEMBLY AND MATCH MARKS
REMOVAL OF TEMPORARY ATTACH. AND NDE INSPECTION OF AFFECTED AREA

GENERAL FABRICATION INSPECTION REQUIREMENTS (ALL FABRICATED EQUIPMENT)

R W H INSPECTION/TESTING ACTIVITY (REFERENCES TO EP 7-1-1, UNLESS OTHERWISE NOTED) INSPECTOR’S INITIALS (REVIEW COMPLETE) DATE
ALL MAJOR REPAIRS PERFORMED IN ACCORDANCE WITH ACCEPTED PROCEDURES (10.0)
ALL OTHER REPAIRS PERFORMED IN ACCORDANCE WITH ACCEPTED PROCEDURES (10.0)
SURFACE CLEANLINESS/PROFILE
FINAL SHIPPING PREPARATION/CLEANLINESS/PRESERVATION (EP 7-1-4: 5.5)
STAMPING AND MARKING (EP 7-1-4: 5.4)
WELDING INSPECTION (SEE EP 7-1-5) WELDING INSPECTION (SEE EP 7-1-5) WELDING INSPECTION (SEE EP 7-1-5) WELDING INSPECTION (SEE EP 7-1-5) WELDING INSPECTION (SEE EP 7-1-5) WELDING INSPECTION (SEE EP 7-1-5)
WELDING PROCESS REQUIREMENTS (6.0)
WELDER PERFORMANCE QUALIFICATION TESTS (7.0)
WELD JOINT DESIGN (8.0)
PREHEAT AND INTERPASS REQUIREMENTS (9.1)
CONSUMABLE CONTROL (9.0)
WELDING TECHNIQUE REQUIREMENTS (9.0)
WELDER IDENTIFICATION (9.0)
PWHT REPORT - ASME CODE (10.0)
PWHT - AES SERVICE (11.0)
WELD HARDNESS REQUIREMENTS AFTER PWHT (EP 10-2-3)
DOUBLE PIPE HEAT EXCHANGER INSPECTION (EP 8-1-5) DOUBLE PIPE HEAT EXCHANGER INSPECTION (EP 8-1-5) DOUBLE PIPE HEAT EXCHANGER INSPECTION (EP 8-1-5) DOUBLE PIPE HEAT EXCHANGER INSPECTION (EP 8-1-5) DOUBLE PIPE HEAT EXCHANGER INSPECTION (EP 8-1-5) DOUBLE PIPE HEAT EXCHANGER INSPECTION (EP 8-1-5)
HYDROSTATIC TESTING OF UNIT (8.2.1, 2)
DOUBLE PIPE TUBE JOINT WELD TEST (EP 8-1-8: 8.0)
EXTERIOR COATING INSPECTION WHEN REQUIRED (SEE EP 10-3-1) EXTERIOR COATING INSPECTION WHEN REQUIRED (SEE EP 10-3-1) EXTERIOR COATING INSPECTION WHEN REQUIRED (SEE EP 10-3-1) EXTERIOR COATING INSPECTION WHEN REQUIRED (SEE EP 10-3-1) EXTERIOR COATING INSPECTION WHEN REQUIRED (SEE EP 10-3-1) EXTERIOR COATING INSPECTION WHEN REQUIRED (SEE EP 10-3-1)
SAND BLASTED SURFACES (10.0)
COATINGS PREPARATION (10.0)
WET FILM THICKNESS MEASUREMENTS (10.0)
DRY FILM THICKNESS MEASUREMENTS (10.0)
HOLIDAY TESTING OF COATING (10.0)
EQUIPMENT ID JOB NO. DOCUMENT NO. REV.
INSPECTOR SIGN-OFF INSPECTOR SIGN-OFF INSPECTOR SIGN-OFF INSPECTOR SIGN-OFF
INITIALS NAME COMPANY SOCIAL SECURITY NUMBER
EQUIPMENT ID JOB NO. DOCUMENT NO. REV.
SUMMARY: