Section 6 — Rotating Equipment
IPE Engineering Practice IPE-EP-6-9-1C
Document number: IPE-EP-6-9-1C · Section: 6 — Rotating Equipment
THE MANUFACTURER OF EQUIPMENT PURCHASED BY REFINING COMPANY SHALL BE RESPONSIBLE FOR MEETING ALL APPLICABLE REQUIREMENTS OF THE ENGINEERING PRACTICES AND OTHER DOCUMENTS REFERENCED THEREIN REGARDLESS OF WHETHER THE ITEMS ARE INSPECTED BY A REPRESENTATIVE.
THE LATEST EDITION OF THE FOLLOWING STANDARDS AND PUBLICATIONS ARE REFERRED TO HEREIN.
EP 6-3-1 GENERAL PURPOSE STEAM TURBINES
EP 6-7-1 SPECIAL REQUIREMENTS FOR ROTATING EQUIPMENT EP 6-9-1 SPECIAL PURPOSE LUBE/SEAL OIL SYSTEMS
EP 10-2-3 MATERIAL HARDNESS REQUIREMENTS EP 12-2-1 CONTROL SYSTEMS INSTALLATION
EP 15-1-4 POSITIVE MATERIALS IDENTIFICATION (PMI)
LEVEL 2: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, AND FINAL INSPECTION LEVEL 3: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, WITNESS POINTS, AND FINAL INSPECTION
LEVEL 4: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, WITNESS POINTS, HOLD POINTS, AND FINAL INSPECTION
| EQUIPMENT ID | JOB NO. | DOCUMENT NO. | REV. |
|---|
| DOCUMENT DESCRIPTION | INSPECTOR'S INITIALS (REVIEW COMPLETE) | DATE | |
|---|---|---|---|
| PREFABRICATION MEETING | PREFABRICATION MEETING | PREFABRICATION MEETING | PREFABRICATION MEETING |
| 1. | PURCHASE DOCUMENTS & INSPECTION CHECKLIST |
||
| 2. | VENDOR SPECIFICATIONS | ||
| 3. | APPLICABLE STANDARDS & SPECIFICATIONS API 614 PAR. 2.1.4 | ||
| 4. | -AUTHORIZED WAIVERS AND/OR DEVIATIONS | ||
| 5. | VENDOR'S QUALITY CONTROL MANUAL | ||
| 6. | QUALITY CONTROL PLAN | ||
| 7. | MAJOR WELD REPAIRS & REVIEW AND APPROVAL OF REPAIR PROCEDURES | ||
| 8. | TESTING REQUIREMENTS AND TEST PROCEDURE | ||
| 9. | PRELIMINARY TEST SCHEDULE | ||
| 10. | PROCEDURE FOR NOTIFICATION OF WITNESSED (OR OBSERVED) TESTING AND INSPECTION ACTIVITIES | ||
| 11. | SUB-VENDORS Q/C PLAN | ||
| 12. | |||
| 13. | |||
| 14. | |||
| DOCUMENT REVIEW (DURING MANUFACTURING PROCESS) | DOCUMENT REVIEW (DURING MANUFACTURING PROCESS) | DOCUMENT REVIEW (DURING MANUFACTURING PROCESS) | DOCUMENT REVIEW (DURING MANUFACTURING PROCESS) |
| 15. | MATERIAL REQUISITIONS (EP 6-2-2: 2.11.1.1, 4,7,8,10 & EP 6-2- 2 DS) |
||
| 16. | MATERIAL RECEIVING SIGN-OFF | ||
| 17. | MATERIAL TEST REPORTS (API-614 5.2.4.2) | ||
| 18. | IMPACT TEST REPORT (API-641 5.2.4.2.a) | ||
| 19. | MATERIAL HARDNESS TEST REPORTS (API-614 5.2.4.2.a)) | ||
| 20. | PMI OF ALL APPLICABLE MATERIALS | ||
| 21. | WELDING PROCEDURE SPECIFICATIONS (API-614 PAR. 2.13.2 & 2.13.6, 2.13.11) | ||
| 22. | WELDER QUALIFICATION RECORDS (API-614 PAR 2.13.3) | ||
| 23. | WELDER TRACEABILITY DOCUMENTATION (ASME SECTION VIII COMPLIANCE) (API-614 2.13.3) |
||
| 24. | NDE PROCEDURES (API-614 PAR. 2.13.3 & 4.2.1.3) | ||
| 25. | NDE TEST REPORTS (API-614 PAR. 2.13.3 & 4.2.1.3) | ||
| 26. | NDE REPORTS OF CASTINGS (API-614 PAR. 2.13.3 & 4.2.1.3) | ||
| 27. | NDE REPORTS OF FORGINGS (API-614 PAR. 2.13.3 & 4.2.1.3) | ||
| 28. | NDE OF REPAIRS (API-614 PAR. 2.13.3 & 4.2.1.3) | ||
| 29. | NDE PERSONNEL CERTIFICATION (API-614 PAR. 2.13.3 & 4.2.1.3) | ||
| 30. | MANUFACTURING PLAN/SHOP TRAVELER (API-614 PAR. 2.13.3 & 4.2.1.3) | ||
| 31. | MAIN AND SPARE ROTORS - ASSEMBLY AND BALANCING RECORDS (API-614 PAR. 4.1.2) |
||
| 32. | SUB-CONTRACTORS Q/C REPORTS (API-614 PAR. 4.12.) | ||
| 33. | -AUTHORIZED WAIVERS AND/OR DEVIATIONS | ||
| 34. | REVIEW OF SUBORDERS OF UNPRICED PURCHASE ORDERS TO SUBVENDORS FOR COMPLIANCE WITH ENGINEERING PRACTICES |
||
| 35. | |||
| 36. | |||
| 37. |
| EQUIPMENT ID | JOB NO. | DOCUMENT NO. | REV. |
|---|
| DOCUMENT DESCRIPTION | INSPECTOR'S INITIALS (REVIEW COMPLETE) | DATE | |
|---|---|---|---|
| FINAL DOCUMENT REVIEW (PRIOR TO RELEASE FOR SHIPMENT) | FINAL DOCUMENT REVIEW (PRIOR TO RELEASE FOR SHIPMENT) | FINAL DOCUMENT REVIEW (PRIOR TO RELEASE FOR SHIPMENT) | FINAL DOCUMENT REVIEW (PRIOR TO RELEASE FOR SHIPMENT) |
| 1. | INSTRUCTION MANUAL INCLUDED WITH UNIT (API-614 PAR. 5.2.4.4 APP. "D" PAR. 16) |
||
| 2. | PRESSURE RELIEF VALVE CERTIFICATIONS (API-614 PAR. 3.4.8.1) | ||
| 3. | HYDROTEST CERTIFICATIONS (API-614 PAR. 4.3.2, APP "D" PAR. 13) | ||
| 4. | FINAL MECHANICAL INSPECTION RECORDS (API-614 PAR. 5.2A.2.c) | ||
| 5. | TEST PERFORMANCE CURVES (API-614 APP. "D" PAR. 14) | ||
| 6. | AS-BUILT DATA SHEETS API-614 PAR. 5.2.4.2.b) | ||
| 7. | SPECIAL TOOL LIST (2.1.17) | ||
| 8. | PRESERVATION, PACKING AND SHIPPING PROCEDURES (API- 614 PAR. 5.2.4.6) | ||
| 9. | COMPLETE SPARE PART LIST (API-614 PAR. 5.2.4.5) | ||
| 10. | LUBRICATION REQUIREMENTS (API-614 PAR. 5.2.4.4) | ||
| 11. | NAMEPLATE RUBBINGS AND/OR CODES | ||
| 12. | CERTIFICATE OF COMPLIANCE | ||
| 13. | PRESSURE VESSEL CODE SECTION VIII - ASME | ||
| 14. | MANUFACTURER'S DATA REPORT | ||
| 15. | |||
| 16. | |||
| 17. |
| EQUIPMENT ID | JOB NO. | DOCUMENT NO. | REV. |
|---|
R CHECK: THE SHOP INSPECTOR SHALL REVIEW DOCUMENTED RESULTS OF INSPECTION PERFORMED BY VENDOR'S INSPFCTOR OR SUBCONTRACTED INSPECTOR.
W CHECK: INDICATES THE SHOP INSPECTOR SHALL WITNESS ITEMS DURING FABRICATION SHOP SHALL NOTIFY INSPECTOR 2 DAYS IN ADVANCE OF FABRICATION POINT BUT NEED NOT HOLD PRODUCTION FOR INSPECTION.
H CHECK: INDICATES THE SHOP INSPECTOR SHALL INSPECT ITEMS DURING HOLD ON FABRICATION. SHOP SHALL NOTIFY INSPECTOR FIVE DAYS IN ADVANCE OF FABRICATION POINT AND SHALL NOT CONTINUE AFFECTED PRODUCTION UNTIL INSPECTOR PERFORMS AND IMPROVES FABRICATION AFTER INDICATED INSPECTION.
| R | R | W | W | H | H | INSPECTION/TESTING ACTIVITY | INSPECTOR'S INITIALS (REVIEW COMPLETE) | DATE |
|---|---|---|---|---|---|---|---|---|
| MATERIALS INSPECTION | MATERIALS INSPECTION | MATERIALS INSPECTION | MATERIALS INSPECTION | MATERIALS INSPECTION | MATERIALS INSPECTION | MATERIALS INSPECTION | MATERIALS INSPECTION | MATERIALS INSPECTION |
| ASTM OPTIONAL TESTS | ASTM OPTIONAL TESTS | |||||||
| HARDNESS TEST (API-614 PAR. 5.2.4.2.a) | HARDNESS TEST (API-614 PAR. 5.2.4.2.a) | |||||||
| CHARPY IMPACT TEST (API-614 PAR.5.2.4.2.a) | CHARPY IMPACT TEST (API-614 PAR.5.2.4.2.a) | |||||||
| PMI OF APPLICABLE MATERIALS | PMI OF APPLICABLE MATERIALS | |||||||
| OVERHEAD OIL TANK | OVERHEAD OIL TANK | |||||||
| OTHERS (IDENTIFIED PARTS TO BE CHECKED) | OTHERS (IDENTIFIED PARTS TO BE CHECKED) | |||||||
| VERIFICATION FLEXIBLE ACCUMULATOR INTERNALS ARE SUITABLE FOR PROPOSED LUBE OILS | VERIFICATION FLEXIBLE ACCUMULATOR INTERNALS ARE SUITABLE FOR PROPOSED LUBE OILS | |||||||
| FABRICATION INSPECTION PIPING | FABRICATION INSPECTION PIPING | FABRICATION INSPECTION PIPING | FABRICATION INSPECTION PIPING | FABRICATION INSPECTION PIPING | FABRICATION INSPECTION PIPING | FABRICATION INSPECTION PIPING | FABRICATION INSPECTION PIPING | FABRICATION INSPECTION PIPING |
| WELDER IDENTIFICATION &PERFORMANCE QUALIFICATION | WELDER IDENTIFICATION &PERFORMANCE QUALIFICATION | |||||||
| WELDING REQUIREMENTS & PROCEDURE REVIEW | WELDING REQUIREMENTS & PROCEDURE REVIEW | |||||||
| NDE OF ACCESSIBLE SURFACES OF WELDS | NDE OF ACCESSIBLE SURFACES OF WELDS | |||||||
| RT LOCATION SELECTION | RT LOCATION SELECTION | |||||||
| RT REQUIREMENTS AND RESULTS | RT REQUIREMENTS AND RESULTS | |||||||
| UT REQUIREMENTS AND RESULTS | UT REQUIREMENTS AND RESULTS | |||||||
| MT REQUIREMENTS AND RESULTS | MT REQUIREMENTS AND RESULTS | |||||||
| LT REQUIREMENTS AND RESULTS | LT REQUIREMENTS AND RESULTS | |||||||
| HYDROSTATIC TESTS | HYDROSTATIC TESTS | |||||||
| REPAIR PROCEDURE APPROVED | REPAIR PROCEDURE APPROVED | |||||||
| EQUIPMENT ID | JOB NO. | DOCUMENT NO. | REV. |
|---|
| R | W | H | INSPECTION/TESTING ACTIVITY | INSPECTOR'S INITIALS (REVIEW COMPLETE) | DATE |
|---|---|---|---|---|---|
| FABRICATION INSPECTION PRESSURE VESSELS | FABRICATION INSPECTION PRESSURE VESSELS | FABRICATION INSPECTION PRESSURE VESSELS | FABRICATION INSPECTION PRESSURE VESSELS | FABRICATION INSPECTION PRESSURE VESSELS | FABRICATION INSPECTION PRESSURE VESSELS |
| WELDER REQUIREMENTS & PROCEDURE REVIEW | |||||
| WELDER IDENTIFICATION & PERFORMANCE QUALIFICATION | |||||
| FIT UPS OF WELD ROOTS AND BEVELS | |||||
| RT LOCATION SELECTION | |||||
| NDE OF ACCESSIBLE SURFACES OF WELD | |||||
| RT REQUIREMENTS AND RESULTS | |||||
| UT REQUIREMENTS AND RESULTS | |||||
| MT REQUIREMENTS AND RESULTS | |||||
| LT REQUIREMENTS AND RESULTS | |||||
| HYDROSTATIC TESTS | |||||
| REPAIR PROCEDURE APPROVED | |||||
| MACHINING INSPECTION/DIMENSIONAL CHECKS (SEE DRAWINGS) | MACHINING INSPECTION/DIMENSIONAL CHECKS (SEE DRAWINGS) | MACHINING INSPECTION/DIMENSIONAL CHECKS (SEE DRAWINGS) | MACHINING INSPECTION/DIMENSIONAL CHECKS (SEE DRAWINGS) | MACHINING INSPECTION/DIMENSIONAL CHECKS (SEE DRAWINGS) | MACHINING INSPECTION/DIMENSIONAL CHECKS (SEE DRAWINGS) |
| MATCHING OF PLUG AND GAUGES FOR COUPLING | |||||
| SURFACE FINISH OF COUPLING HUB BORES | |||||
| COUPLING HUB'S TAPERED BORES CHECK | |||||
| OUTSIDE CORNERS OF MOUNTING PLATE | |||||
| LIFTING LUGS FOR BASEPLATE | |||||
| STRUCTURAL WELDING | STRUCTURAL WELDING | STRUCTURAL WELDING | STRUCTURAL WELDING | STRUCTURAL WELDING | STRUCTURAL WELDING |
| WELDER REQUIREMENTS & PROCEDURE REVIEW | |||||
| WELDER IDENTIFICATION & PERFORMANCE QUALIFICATION | |||||
| FIT UPS OF WELD ROOTS AND BEVELS | |||||
| NDE OF ACCESSIBLE SURFACES OF WELD | |||||
| MT REQUIREMENTS AND RESULTS | |||||
| MT OF CAST STEEL CASING | |||||
| EQUIPMENT ID | JOB NO. | DOCUMENT NO. | REV. |
|---|
| R | W | H | INSPECTION/TESTING ACTIVITY | INSPECTOR'S INITIALS (REVIEW COMPLETE) | DATE |
|---|---|---|---|---|---|
| MACHINING INSPECTION | MACHINING INSPECTION | MACHINING INSPECTION | MACHINING INSPECTION | MACHINING INSPECTION | MACHINING INSPECTION |
| GROUTING ACCESSIBILITY OF BASEPLATE (3.3.2.5) | |||||
| THICKNESS OF SOLEPLATES (3.3.3.1.3) | |||||
| CORNERS OF SOLEPLATES (3.3.3.1.4) | |||||
| PRE ASSEMBLY INSPECTION/TESTING (SEE DRAWING AND TEST PROCEDURES) | PRE ASSEMBLY INSPECTION/TESTING (SEE DRAWING AND TEST PROCEDURES) | PRE ASSEMBLY INSPECTION/TESTING (SEE DRAWING AND TEST PROCEDURES) | PRE ASSEMBLY INSPECTION/TESTING (SEE DRAWING AND TEST PROCEDURES) | PRE ASSEMBLY INSPECTION/TESTING (SEE DRAWING AND TEST PROCEDURES) | PRE ASSEMBLY INSPECTION/TESTING (SEE DRAWING AND TEST PROCEDURES) |
| DYNAMIC BALANCE OF COUPLINGS (API 671: 2.5.2, COUPLING DRAWINGS) | |||||
| DYNAMIC BALANCE OF BARE SHAFT (2.9.5.1) | |||||
| DYNAMIC BALANCE OF BALANCE PISTON (2.9.5.1) | |||||
| DYNAMIC BALANCE OF EACH IMPELLER ON MANDREL (2.9.5.1) | |||||
| IMPELLER OVERSPEED TEST (4.3.3; EP 12-2-2: 4.3.3) | |||||
| DIMENSIONAL CHECK OF IMPELLERS AFTER OVERSPEED TEST (4.3.3; EP 6-2-2: 4.3.3) | |||||
| NDE OF IMPELLERS AFTER OVERSPEED TEST (EP 6-2-2: 2.11.5.3) | |||||
| ROTOR ASSEMBLY AND DYNAMIC BALANCING (2.9.5.2, VENDOR BALANCING PROCEDURE) | |||||
| FACE RUNOUTS ON THRUST COLLAR OF COMPLETELY ASSEMBLED ROTOR (2.6.13) | |||||
| IMPELLER/BALANCE PISTON-SPACER GAP CHECK (SEE ASSEMBLY DRAWINGS FOR DIMENSIONS) | |||||
| RESIDUAL UNBALANCE CHECK OF ROTOR ASSEMBLY (2.9.5.3) | |||||
| GAUSS CHECK OF FINAL ROTOR ASSEMBLY (EP 6-2-2: 2.9.5.3) | |||||
| SHAFT END AND COUPLING HUB BLUING CONTACT CHECK (SEE DRAWINGS FOR TOLERANCE) | |||||
| VERIFY SHAFT-IMPELLERS INTERFERENCE FITS | |||||
| VERIFY SHAFT-SHAFT SLEEVES (IMPELLER SPACERS) INTERFERENCE FITS | |||||
| VERIFY SHAFT-BALANCE PISTON INTERFERENCE FIT ROTOR HIGH-SPEED BALANCING (2.9.5.4) | |||||
| ASSEMBLY INSPECTION (SEE VENDOR'S ASSEMBLY DRAWINGS) | ASSEMBLY INSPECTION (SEE VENDOR'S ASSEMBLY DRAWINGS) | ASSEMBLY INSPECTION (SEE VENDOR'S ASSEMBLY DRAWINGS) | ASSEMBLY INSPECTION (SEE VENDOR'S ASSEMBLY DRAWINGS) | ASSEMBLY INSPECTION (SEE VENDOR'S ASSEMBLY DRAWINGS) | ASSEMBLY INSPECTION (SEE VENDOR'S ASSEMBLY DRAWINGS) |
| CHECK SHAFT-INTERSTAGE DIAPHRAGM CLEARANCES | |||||
| CHECK SHAFT-BEARING CLEARANCES |
| R | W | H | INSPECTION/TESTING ACTIVITY | INSPECTOR'S INITIALS (REVIEW COMPLETE) | DATE |
|---|---|---|---|---|---|
| CHECK IMPELLER-CASING AXIAL CLEARANCES | |||||
| CORRECT APPLICATION OF CASING BOLTS TORQUING PROCEDURE | |||||
| JACKSCREWS, GUIDE RODS, DOWELS &LIFTING LUGS CHECK (2.2.10) | |||||
| MOUNTING OF COUPLING HUB ON SHAFT (SEE COUPLING DRAWINGS AND MANUALS) | |||||
| VERIFY ROTOR AXIAL CLEARANCE (COLD FLOAT) | |||||
| GEAR-DRIVER COUPLING ALIGNMENT | |||||
| COMPRESSOR-GEAR COUPLING ALIGNMENT | |||||
| VERIFY INTER-CONNECTIONS AND LOCATIONS ON CERTIFIED OUTLINE DRAWINGS | |||||
| VERIFY ALL PARTS INSTALLED (SEE DRAWINGS AND BILLS OF MATERIAL | |||||
| INSTRUMENT AND CONTROL PANEL INSPECTION | INSTRUMENT AND CONTROL PANEL INSPECTION | INSTRUMENT AND CONTROL PANEL INSPECTION | INSTRUMENT AND CONTROL PANEL INSPECTION | INSTRUMENT AND CONTROL PANEL INSPECTION | INSTRUMENT AND CONTROL PANEL INSPECTION |
| PIPING AND WIRING (3.4.3.2; EP12-1-1: 6.1, 2; EP 12-2-1) | |||||
| TAGGING (3.4.4.1.1) | |||||
| THERMOMETERS AND TEMPERATURE GAUGES (3.4.4.2) | |||||
| THERMOWELLS (3.4.4.3) | |||||
| THERMOCOUPLES & RTD'S (3.4.4.4:EP 6-2-2: 3.4.4.4.1) | |||||
| PRESSURE GAUGES & PRESSURE SENSING ELEMENTS (3.4.4.5, 3.4.5.2.2) | |||||
| VIBRATION, POSITION, AND BEARING TEMPERATURE DETECTORS (3.4.7) | |||||
| VERIFY ALL PARTS INSTALLED (SEE DRAWINGS AND BILLS OF MATERIAL) | |||||
| PIPING AND APPURTENANCES INSPECTION | PIPING AND APPURTENANCES INSPECTION | PIPING AND APPURTENANCES INSPECTION | PIPING AND APPURTENANCES INSPECTION | PIPING AND APPURTENANCES INSPECTION | PIPING AND APPURTENANCES INSPECTION |
| PIPING CONNECTIONS (3.5.1.4) | |||||
| INSTRUMENT LINES (3.5.1.6, 3.5.2) | |||||
| BEARING BYPASS PROVISION (3.5.1.9) | |||||
| R | W | H | INSPECTION/TESTING ACTIVITY | INSPECTOR'S INITIALS (REVIEW COMPLETE) | DATE |
|---|---|---|---|---|---|
| FUNCTIONAL CHECKS AND TESTING | FUNCTIONAL CHECKS AND TESTING | FUNCTIONAL CHECKS AND TESTING | FUNCTIONAL CHECKS AND TESTING | FUNCTIONAL CHECKS AND TESTING | FUNCTIONAL CHECKS AND TESTING |
| CONTROL PANEL FUNCTIONAL TEST | |||||
| VERIFY ALARM AND SHUTDOWN SETTI NGS | |||||
| LUBE OIL CONSOLE FUNCTIONAL TEST (API-614) | |||||
| ADEQUATE CLEARANCE AREAS AND ACCESS FOR OPERATION AND MAINTENANCE | |||||
| JACKSCREWS, GUIDE RODS, DOWELS & LIFTING LUGS FUNCTIONAL CHECKS (2.2.10) | |||||
| MECHANICAL RUNNING TESTS (4.3.4 EP 6-2-2 :4.3.4) | |||||
| SHOP VERIFICATION OF UNBALANCED RESPONSE ANALYSIS (2.9.3) | |||||
| ASSEMBLED COMPRESSOR GAS-LEAKAGE TEST (4.3.5; EP 6-2-2: 4.3.5.1) | |||||
| PERFORMANCE TEST (4.3.6.1; EP 6-2-2: 4.3.6.1.4) | |||||
| COMPLETE UNIT TEST (4.3.6.2) | |||||
| TANDEM TEST (4.3.6.3) | |||||
| GEAR TEST (4.3.6.4) | |||||
| HELIUM TEST (4.3.6.5) | |||||
| SOUND-LEVEL TEST (4.3.6.6) | |||||
| POST-TEST INSPECTION OF CASING INTERNAL (4.3.6.8) | |||||
| FULL-PRESSURE/FULL-LOAD/FULL-SPEED TEST (4.3.6.9) | |||||
| POST-TEST INSPECTION OF THE HYDRAULIC COUPLING FIT (4.3.6.10) | |||||
| SPARE-PART TEST (4.3.6.11) | |||||
| FINAL INSPECTION AND APPROVAL BEFORE SHIPPING | |||||
| PREPARATION FOR SHIPMENT | PREPARATION FOR SHIPMENT | PREPARATION FOR SHIPMENT | PREPARATION FOR SHIPMENT | PREPARATION FOR SHIPMENT | PREPARATION FOR SHIPMENT |
| PLUGS FOR TAPPED OPENINGS (2.3.3.5, 4.4.3.7) | |||||
| NAMEPLATE REQUIREMENTS (2.10) | |||||
| EPOXY-PRIMER APPLIED TO GROUTING SURFACES OF MOUNTING PLATE (3.3.1.2.10) | |||||
| CLEANING (4.4.3.3, EP 6-7-1: 6.2.1, 6.2.18) | |||||
| PAINTING, COATING AND PRESERVATION (4.4.3.1; EP 6-7-1: 6.2.4,5) | |||||
| PACKING AND PROTECTION (4.4.3.5:EP 6-7-1: 6.2.6, 7, 12) | |||||
| PARTS TAGGING AND IDENTIFICATION (4.4.3.8-9, 4.4.4; EP 6-7-1: 6.2.15, 17) | |||||
| SPARE ROTOR PREPARATION (4.4.3.10) | |||||
| PIPING & AUXILIARY EQUIPMENT FIT-UP (4.4.3.11) | |||||
| INSTALLATION, OPERATION & MAINTENANCE MANUALS (4.4.5, EP 6-7-1: 6.2.16) | |||||
| R | W | H | INSPECTION/TESTING ACTIVITY | INSPECTOR'S INITIALS (REVIEW COMPLETE) | DATE |
|---|---|---|---|---|---|
| INSPECTOR SIGN-OFF | INSPECTOR SIGN-OFF | INSPECTOR SIGN-OFF | INSPECTOR SIGN-OFF |
|---|---|---|---|
| INITIALS | NAME | COMPANY | SOCIAL SECURITY NUMBER |
© 2026 Inflection Point Engineering, LLC. All rights reserved. The content of this page — including calculation methods, reference data, written analysis, interactive tools, and source code — is the intellectual property of Inflection Point Engineering, LLC and is protected under applicable copyright, trademark, and trade secret laws. Unauthorized reproduction, redistribution, modification, or derivative use in whole or in part is prohibited without prior written consent.
Disclaimer. This material is provided for informational and educational purposes only and does not constitute professional engineering advice. Calculations, reference data, and methodologies are based on published standards and accepted engineering practice but are not a substitute for engineering judgment, site-specific analysis, or review by a licensed Professional Engineer. Inflection Point Engineering, LLC makes no warranties, express or implied, regarding the accuracy, completeness, or fitness for a particular purpose of any content presented here, and shall not be liable for any direct, indirect, incidental, or consequential damages arising from its use. Users assume all risk associated with applying this content to real-world design, operations, or decisions.
© 2026 Inflection Point Engineering, LLC. All rights reserved.