Inflection Point Engineering Section 6 — Rotating Equipment

Special Purpose Lube/Seal Oil Systems Inspection Checklist

IPE Engineering Practice IPE-EP-6-9-1C

Document number: IPE-EP-6-9-1C · Section: 6 — Rotating Equipment

EQUIPMENT ID JOB NO. DOCUMENT NO. REV.

THE MANUFACTURER OF EQUIPMENT PURCHASED BY REFINING COMPANY SHALL BE RESPONSIBLE FOR MEETING ALL APPLICABLE REQUIREMENTS OF THE ENGINEERING PRACTICES AND OTHER DOCUMENTS REFERENCED THEREIN REGARDLESS OF WHETHER THE ITEMS ARE INSPECTED BY A REPRESENTATIVE.

REFERENCES

THE LATEST EDITION OF THE FOLLOWING STANDARDS AND PUBLICATIONS ARE REFERRED TO HEREIN.

ENGINEERING PRACTICES

EP 6-3-1 GENERAL PURPOSE STEAM TURBINES

EP 6-7-1 SPECIAL REQUIREMENTS FOR ROTATING EQUIPMENT EP 6-9-1 SPECIAL PURPOSE LUBE/SEAL OIL SYSTEMS

EP 10-2-3 MATERIAL HARDNESS REQUIREMENTS EP 12-2-1 CONTROL SYSTEMS INSTALLATION

EP 15-1-4 POSITIVE MATERIALS IDENTIFICATION (PMI)

API PUBLICATIONS

API-614 SPECIAL PURPOSE LUBE/SEAL OIL SYSTEMS

FREQUENCY OF CONTACT BY THE INSPECTOR: (CHECK ONE)

LEVEL 1: ON CALL BY FABRICATOR LEVEL 2: ONCE EVERY TWO WEEKS LEVEL 3: EVERY WEEK

LEVEL 4: DAILY

LEVEL 5: RESIDENT

LEVEL 6: OTHER, SPECIFY ________

LEVEL OF INSPECTION BY THE INSPECTOR: (CHECK ONE)

LEVEL 1: PREFABRICATION MEETING, DOCUMENT REVIEW, AND FINAL INSPECTION

LEVEL 2: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, AND FINAL INSPECTION LEVEL 3: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, WITNESS POINTS, AND FINAL INSPECTION

LEVEL 4: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, WITNESS POINTS, HOLD POINTS, AND FINAL INSPECTION

LEVEL 5: OTHER, SPECIFY ____

EQUIPMENT ID JOB NO. DOCUMENT NO. REV.

DOCUMENT REVIEW (SHOP INSPECTOR SHALL REVIEW):

DOCUMENT DESCRIPTION INSPECTOR'S INITIALS (REVIEW COMPLETE) DATE
PREFABRICATION MEETING PREFABRICATION MEETING PREFABRICATION MEETING PREFABRICATION MEETING
1. PURCHASE DOCUMENTS & INSPECTION
CHECKLIST
2. VENDOR SPECIFICATIONS
3. APPLICABLE STANDARDS & SPECIFICATIONS API 614 PAR. 2.1.4
4. -AUTHORIZED WAIVERS AND/OR DEVIATIONS
5. VENDOR'S QUALITY CONTROL MANUAL
6. QUALITY CONTROL PLAN
7. MAJOR WELD REPAIRS & REVIEW AND APPROVAL OF REPAIR PROCEDURES
8. TESTING REQUIREMENTS AND TEST PROCEDURE
9. PRELIMINARY TEST SCHEDULE
10. PROCEDURE FOR NOTIFICATION OF WITNESSED (OR OBSERVED) TESTING AND INSPECTION ACTIVITIES
11. SUB-VENDORS Q/C PLAN
12.
13.
14.
DOCUMENT REVIEW (DURING MANUFACTURING PROCESS) DOCUMENT REVIEW (DURING MANUFACTURING PROCESS) DOCUMENT REVIEW (DURING MANUFACTURING PROCESS) DOCUMENT REVIEW (DURING MANUFACTURING PROCESS)
15. MATERIAL REQUISITIONS (EP 6-2-2: 2.11.1.1, 4,7,8,10 & EP 6-2-
2 DS)
16. MATERIAL RECEIVING SIGN-OFF
17. MATERIAL TEST REPORTS (API-614 5.2.4.2)
18. IMPACT TEST REPORT (API-641 5.2.4.2.a)
19. MATERIAL HARDNESS TEST REPORTS (API-614 5.2.4.2.a))
20. PMI OF ALL APPLICABLE MATERIALS
21. WELDING PROCEDURE SPECIFICATIONS (API-614 PAR. 2.13.2 & 2.13.6, 2.13.11)
22. WELDER QUALIFICATION RECORDS (API-614 PAR 2.13.3)
23. WELDER TRACEABILITY DOCUMENTATION (ASME SECTION VIII
COMPLIANCE) (API-614 2.13.3)
24. NDE PROCEDURES (API-614 PAR. 2.13.3 & 4.2.1.3)
25. NDE TEST REPORTS (API-614 PAR. 2.13.3 & 4.2.1.3)
26. NDE REPORTS OF CASTINGS (API-614 PAR. 2.13.3 & 4.2.1.3)
27. NDE REPORTS OF FORGINGS (API-614 PAR. 2.13.3 & 4.2.1.3)
28. NDE OF REPAIRS (API-614 PAR. 2.13.3 & 4.2.1.3)
29. NDE PERSONNEL CERTIFICATION (API-614 PAR. 2.13.3 & 4.2.1.3)
30. MANUFACTURING PLAN/SHOP TRAVELER (API-614 PAR. 2.13.3 & 4.2.1.3)
31. MAIN AND SPARE ROTORS - ASSEMBLY AND BALANCING
RECORDS (API-614 PAR. 4.1.2)
32. SUB-CONTRACTORS Q/C REPORTS (API-614 PAR. 4.12.)
33. -AUTHORIZED WAIVERS AND/OR DEVIATIONS
34. REVIEW OF SUBORDERS OF UNPRICED PURCHASE ORDERS TO
SUBVENDORS FOR COMPLIANCE WITH ENGINEERING PRACTICES
35.
36.
37.
EQUIPMENT ID JOB NO. DOCUMENT NO. REV.

DOCUMENT REVIEW (SHOP INSPECTOR SHALL REVIEW):

DOCUMENT DESCRIPTION INSPECTOR'S INITIALS (REVIEW COMPLETE) DATE
FINAL DOCUMENT REVIEW (PRIOR TO RELEASE FOR SHIPMENT) FINAL DOCUMENT REVIEW (PRIOR TO RELEASE FOR SHIPMENT) FINAL DOCUMENT REVIEW (PRIOR TO RELEASE FOR SHIPMENT) FINAL DOCUMENT REVIEW (PRIOR TO RELEASE FOR SHIPMENT)
1. INSTRUCTION MANUAL INCLUDED WITH UNIT (API-614 PAR.
5.2.4.4 APP. "D" PAR. 16)
2. PRESSURE RELIEF VALVE CERTIFICATIONS (API-614 PAR. 3.4.8.1)
3. HYDROTEST CERTIFICATIONS (API-614 PAR. 4.3.2, APP "D" PAR. 13)
4. FINAL MECHANICAL INSPECTION RECORDS (API-614 PAR. 5.2A.2.c)
5. TEST PERFORMANCE CURVES (API-614 APP. "D" PAR. 14)
6. AS-BUILT DATA SHEETS API-614 PAR. 5.2.4.2.b)
7. SPECIAL TOOL LIST (2.1.17)
8. PRESERVATION, PACKING AND SHIPPING PROCEDURES (API- 614 PAR. 5.2.4.6)
9. COMPLETE SPARE PART LIST (API-614 PAR. 5.2.4.5)
10. LUBRICATION REQUIREMENTS (API-614 PAR. 5.2.4.4)
11. NAMEPLATE RUBBINGS AND/OR CODES
12. CERTIFICATE OF COMPLIANCE
13. PRESSURE VESSEL CODE SECTION VIII - ASME
14. MANUFACTURER'S DATA REPORT
15.
16.
17.
EQUIPMENT ID JOB NO. DOCUMENT NO. REV.

R CHECK: THE SHOP INSPECTOR SHALL REVIEW DOCUMENTED RESULTS OF INSPECTION PERFORMED BY VENDOR'S INSPFCTOR OR SUBCONTRACTED INSPECTOR.

W CHECK: INDICATES THE SHOP INSPECTOR SHALL WITNESS ITEMS DURING FABRICATION SHOP SHALL NOTIFY INSPECTOR 2 DAYS IN ADVANCE OF FABRICATION POINT BUT NEED NOT HOLD PRODUCTION FOR INSPECTION.

H CHECK: INDICATES THE SHOP INSPECTOR SHALL INSPECT ITEMS DURING HOLD ON FABRICATION. SHOP SHALL NOTIFY INSPECTOR FIVE DAYS IN ADVANCE OF FABRICATION POINT AND SHALL NOT CONTINUE AFFECTED PRODUCTION UNTIL INSPECTOR PERFORMS AND IMPROVES FABRICATION AFTER INDICATED INSPECTION.

R R W W H H INSPECTION/TESTING ACTIVITY INSPECTOR'S INITIALS (REVIEW COMPLETE) DATE
MATERIALS INSPECTION MATERIALS INSPECTION MATERIALS INSPECTION MATERIALS INSPECTION MATERIALS INSPECTION MATERIALS INSPECTION MATERIALS INSPECTION MATERIALS INSPECTION MATERIALS INSPECTION
ASTM OPTIONAL TESTS ASTM OPTIONAL TESTS
HARDNESS TEST (API-614 PAR. 5.2.4.2.a) HARDNESS TEST (API-614 PAR. 5.2.4.2.a)
CHARPY IMPACT TEST (API-614 PAR.5.2.4.2.a) CHARPY IMPACT TEST (API-614 PAR.5.2.4.2.a)
PMI OF APPLICABLE MATERIALS PMI OF APPLICABLE MATERIALS
OVERHEAD OIL TANK OVERHEAD OIL TANK
OTHERS (IDENTIFIED PARTS TO BE CHECKED) OTHERS (IDENTIFIED PARTS TO BE CHECKED)
VERIFICATION FLEXIBLE ACCUMULATOR INTERNALS ARE SUITABLE FOR PROPOSED LUBE OILS VERIFICATION FLEXIBLE ACCUMULATOR INTERNALS ARE SUITABLE FOR PROPOSED LUBE OILS
FABRICATION INSPECTION PIPING FABRICATION INSPECTION PIPING FABRICATION INSPECTION PIPING FABRICATION INSPECTION PIPING FABRICATION INSPECTION PIPING FABRICATION INSPECTION PIPING FABRICATION INSPECTION PIPING FABRICATION INSPECTION PIPING FABRICATION INSPECTION PIPING
WELDER IDENTIFICATION &PERFORMANCE QUALIFICATION WELDER IDENTIFICATION &PERFORMANCE QUALIFICATION
WELDING REQUIREMENTS & PROCEDURE REVIEW WELDING REQUIREMENTS & PROCEDURE REVIEW
NDE OF ACCESSIBLE SURFACES OF WELDS NDE OF ACCESSIBLE SURFACES OF WELDS
RT LOCATION SELECTION RT LOCATION SELECTION
RT REQUIREMENTS AND RESULTS RT REQUIREMENTS AND RESULTS
UT REQUIREMENTS AND RESULTS UT REQUIREMENTS AND RESULTS
MT REQUIREMENTS AND RESULTS MT REQUIREMENTS AND RESULTS
LT REQUIREMENTS AND RESULTS LT REQUIREMENTS AND RESULTS
HYDROSTATIC TESTS HYDROSTATIC TESTS
REPAIR PROCEDURE APPROVED REPAIR PROCEDURE APPROVED
EQUIPMENT ID JOB NO. DOCUMENT NO. REV.
R W H INSPECTION/TESTING ACTIVITY INSPECTOR'S INITIALS (REVIEW COMPLETE) DATE
FABRICATION INSPECTION PRESSURE VESSELS FABRICATION INSPECTION PRESSURE VESSELS FABRICATION INSPECTION PRESSURE VESSELS FABRICATION INSPECTION PRESSURE VESSELS FABRICATION INSPECTION PRESSURE VESSELS FABRICATION INSPECTION PRESSURE VESSELS
WELDER REQUIREMENTS & PROCEDURE REVIEW
WELDER IDENTIFICATION & PERFORMANCE QUALIFICATION
FIT UPS OF WELD ROOTS AND BEVELS
RT LOCATION SELECTION
NDE OF ACCESSIBLE SURFACES OF WELD
RT REQUIREMENTS AND RESULTS
UT REQUIREMENTS AND RESULTS
MT REQUIREMENTS AND RESULTS
LT REQUIREMENTS AND RESULTS
HYDROSTATIC TESTS
REPAIR PROCEDURE APPROVED
MACHINING INSPECTION/DIMENSIONAL CHECKS (SEE DRAWINGS) MACHINING INSPECTION/DIMENSIONAL CHECKS (SEE DRAWINGS) MACHINING INSPECTION/DIMENSIONAL CHECKS (SEE DRAWINGS) MACHINING INSPECTION/DIMENSIONAL CHECKS (SEE DRAWINGS) MACHINING INSPECTION/DIMENSIONAL CHECKS (SEE DRAWINGS) MACHINING INSPECTION/DIMENSIONAL CHECKS (SEE DRAWINGS)
MATCHING OF PLUG AND GAUGES FOR COUPLING
SURFACE FINISH OF COUPLING HUB BORES
COUPLING HUB'S TAPERED BORES CHECK
OUTSIDE CORNERS OF MOUNTING PLATE
LIFTING LUGS FOR BASEPLATE
STRUCTURAL WELDING STRUCTURAL WELDING STRUCTURAL WELDING STRUCTURAL WELDING STRUCTURAL WELDING STRUCTURAL WELDING
WELDER REQUIREMENTS & PROCEDURE REVIEW
WELDER IDENTIFICATION & PERFORMANCE QUALIFICATION
FIT UPS OF WELD ROOTS AND BEVELS
NDE OF ACCESSIBLE SURFACES OF WELD
MT REQUIREMENTS AND RESULTS
MT OF CAST STEEL CASING
EQUIPMENT ID JOB NO. DOCUMENT NO. REV.
R W H INSPECTION/TESTING ACTIVITY INSPECTOR'S INITIALS (REVIEW COMPLETE) DATE
MACHINING INSPECTION MACHINING INSPECTION MACHINING INSPECTION MACHINING INSPECTION MACHINING INSPECTION MACHINING INSPECTION
GROUTING ACCESSIBILITY OF BASEPLATE (3.3.2.5)
THICKNESS OF SOLEPLATES (3.3.3.1.3)
CORNERS OF SOLEPLATES (3.3.3.1.4)
PRE ASSEMBLY INSPECTION/TESTING (SEE DRAWING AND TEST PROCEDURES) PRE ASSEMBLY INSPECTION/TESTING (SEE DRAWING AND TEST PROCEDURES) PRE ASSEMBLY INSPECTION/TESTING (SEE DRAWING AND TEST PROCEDURES) PRE ASSEMBLY INSPECTION/TESTING (SEE DRAWING AND TEST PROCEDURES) PRE ASSEMBLY INSPECTION/TESTING (SEE DRAWING AND TEST PROCEDURES) PRE ASSEMBLY INSPECTION/TESTING (SEE DRAWING AND TEST PROCEDURES)
DYNAMIC BALANCE OF COUPLINGS (API 671: 2.5.2, COUPLING DRAWINGS)
DYNAMIC BALANCE OF BARE SHAFT (2.9.5.1)
DYNAMIC BALANCE OF BALANCE PISTON (2.9.5.1)
DYNAMIC BALANCE OF EACH IMPELLER ON MANDREL (2.9.5.1)
IMPELLER OVERSPEED TEST (4.3.3; EP 12-2-2: 4.3.3)
DIMENSIONAL CHECK OF IMPELLERS AFTER OVERSPEED TEST (4.3.3; EP 6-2-2: 4.3.3)
NDE OF IMPELLERS AFTER OVERSPEED TEST (EP 6-2-2: 2.11.5.3)
ROTOR ASSEMBLY AND DYNAMIC BALANCING (2.9.5.2, VENDOR BALANCING PROCEDURE)
FACE RUNOUTS ON THRUST COLLAR OF COMPLETELY ASSEMBLED ROTOR (2.6.13)
IMPELLER/BALANCE PISTON-SPACER GAP CHECK (SEE ASSEMBLY DRAWINGS FOR DIMENSIONS)
RESIDUAL UNBALANCE CHECK OF ROTOR ASSEMBLY (2.9.5.3)
GAUSS CHECK OF FINAL ROTOR ASSEMBLY (EP 6-2-2: 2.9.5.3)
SHAFT END AND COUPLING HUB BLUING CONTACT CHECK (SEE DRAWINGS FOR TOLERANCE)
VERIFY SHAFT-IMPELLERS INTERFERENCE FITS
VERIFY SHAFT-SHAFT SLEEVES (IMPELLER SPACERS) INTERFERENCE FITS
VERIFY SHAFT-BALANCE PISTON INTERFERENCE FIT ROTOR HIGH-SPEED BALANCING (2.9.5.4)
ASSEMBLY INSPECTION (SEE VENDOR'S ASSEMBLY DRAWINGS) ASSEMBLY INSPECTION (SEE VENDOR'S ASSEMBLY DRAWINGS) ASSEMBLY INSPECTION (SEE VENDOR'S ASSEMBLY DRAWINGS) ASSEMBLY INSPECTION (SEE VENDOR'S ASSEMBLY DRAWINGS) ASSEMBLY INSPECTION (SEE VENDOR'S ASSEMBLY DRAWINGS) ASSEMBLY INSPECTION (SEE VENDOR'S ASSEMBLY DRAWINGS)
CHECK SHAFT-INTERSTAGE DIAPHRAGM CLEARANCES
CHECK SHAFT-BEARING CLEARANCES
R W H INSPECTION/TESTING ACTIVITY INSPECTOR'S INITIALS (REVIEW COMPLETE) DATE
CHECK IMPELLER-CASING AXIAL CLEARANCES
CORRECT APPLICATION OF CASING BOLTS TORQUING PROCEDURE
JACKSCREWS, GUIDE RODS, DOWELS &LIFTING LUGS CHECK (2.2.10)
MOUNTING OF COUPLING HUB ON SHAFT (SEE COUPLING DRAWINGS AND MANUALS)
VERIFY ROTOR AXIAL CLEARANCE (COLD FLOAT)
GEAR-DRIVER COUPLING ALIGNMENT
COMPRESSOR-GEAR COUPLING ALIGNMENT
VERIFY INTER-CONNECTIONS AND LOCATIONS ON CERTIFIED OUTLINE DRAWINGS
VERIFY ALL PARTS INSTALLED (SEE DRAWINGS AND BILLS OF MATERIAL
INSTRUMENT AND CONTROL PANEL INSPECTION INSTRUMENT AND CONTROL PANEL INSPECTION INSTRUMENT AND CONTROL PANEL INSPECTION INSTRUMENT AND CONTROL PANEL INSPECTION INSTRUMENT AND CONTROL PANEL INSPECTION INSTRUMENT AND CONTROL PANEL INSPECTION
PIPING AND WIRING (3.4.3.2; EP12-1-1: 6.1, 2; EP 12-2-1)
TAGGING (3.4.4.1.1)
THERMOMETERS AND TEMPERATURE GAUGES (3.4.4.2)
THERMOWELLS (3.4.4.3)
THERMOCOUPLES & RTD'S (3.4.4.4:EP 6-2-2: 3.4.4.4.1)
PRESSURE GAUGES & PRESSURE SENSING ELEMENTS (3.4.4.5, 3.4.5.2.2)
VIBRATION, POSITION, AND BEARING TEMPERATURE DETECTORS (3.4.7)
VERIFY ALL PARTS INSTALLED (SEE DRAWINGS AND BILLS OF MATERIAL)
PIPING AND APPURTENANCES INSPECTION PIPING AND APPURTENANCES INSPECTION PIPING AND APPURTENANCES INSPECTION PIPING AND APPURTENANCES INSPECTION PIPING AND APPURTENANCES INSPECTION PIPING AND APPURTENANCES INSPECTION
PIPING CONNECTIONS (3.5.1.4)
INSTRUMENT LINES (3.5.1.6, 3.5.2)
BEARING BYPASS PROVISION (3.5.1.9)
R W H INSPECTION/TESTING ACTIVITY INSPECTOR'S INITIALS (REVIEW COMPLETE) DATE
FUNCTIONAL CHECKS AND TESTING FUNCTIONAL CHECKS AND TESTING FUNCTIONAL CHECKS AND TESTING FUNCTIONAL CHECKS AND TESTING FUNCTIONAL CHECKS AND TESTING FUNCTIONAL CHECKS AND TESTING
CONTROL PANEL FUNCTIONAL TEST
VERIFY ALARM AND SHUTDOWN SETTI NGS
LUBE OIL CONSOLE FUNCTIONAL TEST (API-614)
ADEQUATE CLEARANCE AREAS AND ACCESS FOR OPERATION AND MAINTENANCE
JACKSCREWS, GUIDE RODS, DOWELS & LIFTING LUGS FUNCTIONAL CHECKS (2.2.10)
MECHANICAL RUNNING TESTS (4.3.4 EP 6-2-2 :4.3.4)
SHOP VERIFICATION OF UNBALANCED RESPONSE ANALYSIS (2.9.3)
ASSEMBLED COMPRESSOR GAS-LEAKAGE TEST (4.3.5; EP 6-2-2: 4.3.5.1)
PERFORMANCE TEST (4.3.6.1; EP 6-2-2: 4.3.6.1.4)
COMPLETE UNIT TEST (4.3.6.2)
TANDEM TEST (4.3.6.3)
GEAR TEST (4.3.6.4)
HELIUM TEST (4.3.6.5)
SOUND-LEVEL TEST (4.3.6.6)
POST-TEST INSPECTION OF CASING INTERNAL (4.3.6.8)
FULL-PRESSURE/FULL-LOAD/FULL-SPEED TEST (4.3.6.9)
POST-TEST INSPECTION OF THE HYDRAULIC COUPLING FIT (4.3.6.10)
SPARE-PART TEST (4.3.6.11)
FINAL INSPECTION AND APPROVAL BEFORE SHIPPING
PREPARATION FOR SHIPMENT PREPARATION FOR SHIPMENT PREPARATION FOR SHIPMENT PREPARATION FOR SHIPMENT PREPARATION FOR SHIPMENT PREPARATION FOR SHIPMENT
PLUGS FOR TAPPED OPENINGS (2.3.3.5, 4.4.3.7)
NAMEPLATE REQUIREMENTS (2.10)
EPOXY-PRIMER APPLIED TO GROUTING SURFACES OF MOUNTING PLATE (3.3.1.2.10)
CLEANING (4.4.3.3, EP 6-7-1: 6.2.1, 6.2.18)
PAINTING, COATING AND PRESERVATION (4.4.3.1; EP 6-7-1: 6.2.4,5)
PACKING AND PROTECTION (4.4.3.5:EP 6-7-1: 6.2.6, 7, 12)
PARTS TAGGING AND IDENTIFICATION (4.4.3.8-9, 4.4.4; EP 6-7-1: 6.2.15, 17)
SPARE ROTOR PREPARATION (4.4.3.10)
PIPING & AUXILIARY EQUIPMENT FIT-UP (4.4.3.11)
INSTALLATION, OPERATION & MAINTENANCE MANUALS (4.4.5, EP 6-7-1: 6.2.16)
R W H INSPECTION/TESTING ACTIVITY INSPECTOR'S INITIALS (REVIEW COMPLETE) DATE
INSPECTOR SIGN-OFF INSPECTOR SIGN-OFF INSPECTOR SIGN-OFF INSPECTOR SIGN-OFF
INITIALS NAME COMPANY SOCIAL SECURITY NUMBER