Section 6 — Rotating Equipment
IPE Engineering Practice IPE-EP-6-2-2C
Document number: IPE-EP-6-2-2C · Section: 6 — Rotating Equipment
THE MANUFACTURER OF EQUIPMENT PURCHASED BY REFINING COMPANY SHALL BE RESPONSIBLE FOR MEETING ALL APPLICABLE REQUIREMENTS OF THE ENGINEERING PRACTICES AND OTHER DOCUMENTS REFERENCED THEREIN REGARDLESS OF WHETHER THE ITEMS ARE INSPECTED BY A REPRESENTATIVE.
THE LATEST EDITION OF THE FOLLOWING STANDARDS AND PUBLICATIONS ARE REFERRED TO HEREIN.
EP 6-2-2 CENTRIFUGAL COMPRESSORS
EP 6-7-1 SPECIAL REQUIREMENTS FOR ROTATING EQUIPMENT EP 12-2-1 CONTROL SYSTEMS INSTALLATION
EP 15-1-4 POSITIVE MATERIALS IDENTIFICATION (PMI)
LEVEL 1: ON CALL BY FABRICATOR LEVEL 2: ONCE EVERY TWO WEEKS LEVEL 3: EVERY WEEK
LEVEL 2: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, AND FINAL INSPECTION LEVEL 3: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, WITNESS POINTS, AND ……………… FINAL INSPECTION
LEVEL 4: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, WITNESS POINTS, HOLD POINTS, AND FINAL INSPECTION
| DOCUMENT DESCRIPTION | INSPECTOR'S INITIALS (REVIEW COMPLETE) |
DATE | |
|---|---|---|---|
| PRE-FABRICATION MEETING ITEMS | PRE-FABRICATION MEETING ITEMS | PRE-FABRICATION MEETING ITEMS | PRE-FABRICATION MEETING ITEMS |
| 1. | PURCHASE DOCUMENTS & INSPECTION CHECKLIST |
||
| 2. | VENDOR SPECIFICATIONS | ||
| 3. | APPLICABLE STANDARDS & SPECIFICATIONS | ||
| 4. | AUTHORIZED WAIVERS AND/OR DEVIATIONS | ||
| 5. | VENDOR'S QUALITY CONTROL MANUAL | ||
| 6. | QUALITY CONTROL PLAN | ||
| 7. | MAJOR WELD REPAIRS & REVIEW AND APPROVAL OF REPAIR PROCEDURES |
||
| 8. | TESTING REQUIREMENTS AND TEST PROCEDURES | ||
| 9. | PRELIMINARY TEST SCHEDULE | ||
| 10. | PROCEDURE FOR NOTIFICATION OF WITNESSED (OR OBSERVED) TESTING AND INSPECTION ACTIVITIES | ||
| 11. | SUB-VENDORS Q/C PLAN | ||
| 12. | |||
| 13. | |||
| 14. | |||
| 15. |
| DOCUMENT DESCRIPTION | INSPECTOR'S INITIALS (REVIEW COMPLETE) |
DATE | |||
|---|---|---|---|---|---|
| DOCUMENT REVIEW (DURING MANUFACTURING PROCESS) | DOCUMENT REVIEW (DURING MANUFACTURING PROCESS) | DOCUMENT REVIEW (DURING MANUFACTURING PROCESS) | DOCUMENT REVIEW (DURING MANUFACTURING PROCESS) | DOCUMENT REVIEW (DURING MANUFACTURING PROCESS) | DOCUMENT REVIEW (DURING MANUFACTURING PROCESS) |
| 1. | 1. | 1. | MATERIAL REQUISITIONS (EP 6-2-2: 2.11.1.1,4,7,8,11; EP 6-2-2 DATA SHEET) | ||
| 2. | 2. | 2. | MATERIAL RECEIVING SIGN-OFF | ||
| 3. | 3. | 3. | MATERIAL TEST REPORTS (2.11.1,2,4,11 ) | ||
| 4. | 4. | 4. | IMPACT TEST REPORTS ( 2.11.3 ) | ||
| 5. | 5. | 5. | MATERIAL HARDNESS TEST REPORT (2.11.1.2,4.2.1.6) | ||
| 6. | 6. | 6. | PMI OF ALL APPLICABLE MATERIALS (EP 15-1-4) | ||
| 7. | 7. | 7. | WELDING PROCEDURE SPECS. | ||
| 8. | 8. | 8. | WELDER QUALIFICATION RECORDS | ||
| 9. | 9. | 9. | WELDER TRACEABILITY DOCUMENT (ASME SECTION VIII COMPLIANCE) | ||
| 10. | 10. | 10. | NDE PROCEDURES | ||
| 11. | 11. | 11. | NDE TEST REPORTS | ||
| 12. | 12. | 12. | NDE REPORTS OF CASTINGS (2.1.4.2 ) | ||
| 13. | 13. | 13. | NDE REPORTS OF FORGINGS (2.11.4.2) | ||
| 14. | 14. | 14. | NDE OF REPAIRS | ||
| 15. | 15. | 15. | NDE PERSONNEL CERTIFICATION | ||
| 16. | 16. | 16. | MANUFACTURER PLAN/SHOP TRAVEL | ||
| 17. | 17. | 17. | MAIN AND SPARE ROTORS – ASSEMBLY AND BALANCING RECORDS | ||
| 18. | 18. | 18. | SUB-CONTRACTOR Q/C REPORTS | ||
| 19. | 19. | 19. | AUTHORIZED WAIVER AND/OR DEVIATION REVIEW | ||
| 20. | 20. | 20. | REVIEW OF SUBORDERS OF UNPRICED PURCHASE ORDERS TO SUBVENDORS FOR COMPLIANCE WITH ENGINEERING PRACTICES | ||
| 21. | 21. | 21. | |||
| 22. | 22. | 22. | |||
| 23. | 23. | 23. | |||
| 24. | 24. | 24. | |||
| FINAL DOCUMENT REVIEW (PRIOR TO RELEASE FOR SHIPMENT) | FINAL DOCUMENT REVIEW (PRIOR TO RELEASE FOR SHIPMENT) | FINAL DOCUMENT REVIEW (PRIOR TO RELEASE FOR SHIPMENT) | FINAL DOCUMENT REVIEW (PRIOR TO RELEASE FOR SHIPMENT) | FINAL DOCUMENT REVIEW (PRIOR TO RELEASE FOR SHIPMENT) | FINAL DOCUMENT REVIEW (PRIOR TO RELEASE FOR SHIPMENT) |
| 25. | 25. | 25. | INSTRUCTION MANUAL INCLUDED WITH COMPRESSOR | ||
| 26. | 26. | 26. | PRESSURE RELIEF VALVE CERTIFICATIONS | ||
| 27. | 27. | 27. | HYDROTEST CERTIFICATIONS | ||
| 28. | 28. | 28. | FINAL MECHANICAL INSPECTION RECORDS | ||
| 29. | 29. | 29. | TEST PERFORMANCE CURVES | ||
| 30. | 30. | 30. | AS-BUILT DATA SHEETS | ||
| 31. | 31. | 31. | SPECIAL TOOL LIST (API 617: 3.6.1) | ||
| 32. | 32. | 32. | PRESERVATION, PACKING AND SHIPPING PROCEDURES | ||
| 33. | 33. | 33. | COMPLETE SPARE PART LIST | ||
| 34. | 34. | 34. | LUBRICATION REQUIREMENTS | ||
| 35. | 35. | 35. | NAMEPLATE RUBBINGS AND/OR CODES | ||
| 36. | 36. | 36. | CERTIFICATE OF COMPLIANCE | ||
| 37. | |||||
| 38. | |||||
| 39. |
GENERAL FABRICATION INSPECTION REQUIREMENTS (ALL FABRICATED EQUIPMENT) (REFERENCES ARE TO API 618 UNLESS OTHERWISE NOTED)
R CHECK: THE SHOP INSPECTOR SHALL REVIEW DOCUMENTED RESULTS OF INSPECTION PERFORMED BY VENDOR'S INSPFCTOR OR SUBCONTRACTED INSPECTOR.
W CHECK: INDICATES THE SHOP INSPECTOR SHALL WITNESS ITEMS DURING FABRICATION SHOP SHALL NOTIFY INSPECTOR 2 DAYS IN ADVANCE OF FABRICATION POINT BUT NEED NOT HOLD PRODUCTION FOR INSPECTION.
H CHECK: INDICATES THE SHOP INSPECTOR SHALL INSPECT ITEMS DURING HOLD ON FABRICATION. SHOP SHALL NOTIFY INSPECTOR FIVE DAYS IN ADVANCE OF FABRICATION POINT AND SHALL NOT CONTINUE AFFECTED PRODUCTION UNTIL INSPECTOR PERFORMS AND IMPROVES FABRICATION AFTER INDICATED INSPECTION.
| R | W | H | INSPECTION/TESTING ACTIVITY | INSPECTOR’S INITIALS (REVIEW COMPLETE) | DATE |
|---|---|---|---|---|---|
| MATERIALS INSPECTION | MATERIALS INSPECTION | MATERIALS INSPECTION | MATERIALS INSPECTION | MATERIALS INSPECTION | MATERIALS INSPECTION |
| ASTM OPTIONAL TESTS (2.11.1.4) | |||||
| HARDNESS TEST (2.11.1.7,10; 4.2.1.6) | |||||
| CHARPY IMPACT TEST (2.11.3) | |||||
| PMI OF APPLICABLE MATERIALS (EP 15-1-4) | |||||
| - CASING | |||||
| - SHAFT | |||||
| - IMPELLERS | |||||
| - SHAFT SLEEVES (SPACERS) | |||||
| - BALANCE PISTON | |||||
| - BALANCE LINE | |||||
| - INTERCONNECTING PIPING | |||||
| - OVERHEAD OIL TANK | |||||
| - OTHERS (IDENTIFIED PARTS TO BE CHECKED) | |||||
| FABRICATION INSPECTION | FABRICATION INSPECTION | FABRICATION INSPECTION | FABRICATION INSPECTION | FABRICATION INSPECTION | FABRICATION INSPECTION |
| FIT UPS OF WELD ROOTS AND BEVELS | |||||
| WELDER IDENTIFICATION & PERFORMANCE QUALIFICATION (2.11.2.2) | |||||
| WELDING REQUIREMENTS (2.11.2.2,3; 2.11.2.9.3 of EP 6-2-2) | |||||
| PWHT REQUIREMENTS (2.11.1.7, 2.11.2.9.4, 2.11.2.10) | |||||
| PWHT PROCEDURES REVIEW AND APPROVAL | |||||
| PWHT PREPARATION | |||||
| WELDING HAZ HARDNESS CHECK AFTER PWHT (2.11.2.9) | |||||
| FLATNESS CHECK OF GASKET CONTACT SURFACES AFTER PWHT WELDING | |||||
| REVIEW OF COLD WORKED PART PWHT |
| R | W | H | INSPECTION/TESTING ACTIVITY | INSPECTOR’S INITIALS (REVIEW COMPLETE) | DATE |
|---|---|---|---|---|---|
| REPAIR PROCEDURE APPROVED (2.11.2.6.1, 2) | |||||
| WELDING REPAIR MAPS | |||||
| RT LOCATION SELECTION | |||||
| FABRICATION INSPECTION CONTINUED | FABRICATION INSPECTION CONTINUED | FABRICATION INSPECTION CONTINUED | FABRICATION INSPECTION CONTINUED | FABRICATION INSPECTION CONTINUED | FABRICATION INSPECTION CONTINUED |
| NDE OF PLATE EDGES (2.11.2.9.1) | |||||
| NDE OF ACCESSIBLE SURFACES OF WELDS (2.11.4.9.2) | |||||
| RT OF PRESSURE-CONTAINING PARTS (2.11.4.2.1) | |||||
| UT OF PRESSURE-CONTAINING PARTS (2.11.4.2.2) | |||||
| MT OF PRESSURE-CONTAINING PARTS (2.11.4.2.3) | |||||
| LT OF PRESSURE-CONTAINING PARTS (2.11.4.2.4) | |||||
| MT OF CAST STEEL CASING (2.11.4.3) | |||||
| HYDROSTATIC TEST OF PRESSURE-CONTAINING PARTS (4.3.2) | |||||
| - CASING | |||||
| - BALANCE LINE | |||||
| - OVERHEAD OIL TANK | |||||
| - VENDOR-SUPPLIED INTERCONNECTING PIPING | |||||
| - OTHERS (IDENTIFIED PARTS TO BE TESTED) | |||||
| LT OF SHAFT | |||||
| MT OF SHAFT | |||||
| UT OF SHAFT | |||||
| NDE OF WELDED IMPELLERS (2.11.5.1) | |||||
| NDE OF CAST IMPELLERS (2.11.5.2) | |||||
| NDE OF IMPELLERS AFTER OVERSPEED TEST (EP 6-2-2: 2.11.5.3) |
| R | W | H | INSPECTION/TESTING ACTIVITY | INSPECTOR’S INITIALS (REVIEW COMPLETE) | DATE |
|---|---|---|---|---|---|
| MACHINING INSPECTION/DIMENSIONAL CHECKS (SEE DRAWINGS) | MACHINING INSPECTION/DIMENSIONAL CHECKS (SEE DRAWINGS) | MACHINING INSPECTION/DIMENSIONAL CHECKS (SEE DRAWINGS) | MACHINING INSPECTION/DIMENSIONAL CHECKS (SEE DRAWINGS) | MACHINING INSPECTION/DIMENSIONAL CHECKS (SEE DRAWINGS) | MACHINING INSPECTION/DIMENSIONAL CHECKS (SEE DRAWINGS) |
| MACHINED FINISH OF COMPRESSOR'S MOUNTING SURFACES (2.2.14) | |||||
| STUDDED CONNECTIONS OF CASING (2.2.15) | |||||
| INTERSTAGE DIAPHRAGMS (2.3.4) | |||||
| CASING CONNECTIONS (2.4.1.2, 3) | |||||
| CASING FLANGES AND NOZZLES (2.4.2.5, 6) | |||||
| AUXILIARY CONNECTIONS TO CASING (2.4.3.4, 2.4.3.5.3, 2.4.3.6) | |||||
| SHAFT ENDS FOR COUPLING FITS (2.6.2) | |||||
| SHAFT RUNOUTS (SEE VENDOR DRAWINGS FOR TOLERANCES) | |||||
| SHAFT SLEEVES/IMPELLER SPACERS RUNOUTS AND BORE CONCENTRICITY (SEE DRAWINGS) | |||||
| MRO & ERO OF SHAFT SENSING AREAS OBSERVED BY VIBRATION PROBES(2.6.5, 2.9.5.6) | |||||
| SURFACE FINISH AND MECHANICAL RUNOUT OF THRUST COLLARS (2.6.13) | |||||
| PROVISION FOR MOUNTING VIBRATION PROBES IN BEARING HOUSING (2.7.4.7) | |||||
| IMPELLERS (SEE VENDOR DRAWINGS) | |||||
| MATCHING OF RING AND PLUG GAUGES FOR COUPLING (3.2.4, API 671: APP.D) | |||||
| SURFACE FINISH OF COUPLING HUB BORES (API 671: 2.1.8.2) | |||||
| COUPLING HUB'S TAPERED BORES CHECK (API 671: 2.1.9.1.4) | |||||
| BEARING PEDESTAL SURFACES AND MOUNTING PLATE (3.3.1.2.3, EP 6-2-2: 3.3.1.2.3) | |||||
| OUTSIDE CORNERS OF MOUNTING PLATE (3.3.1.2.6) | |||||
| LIFTING LUGS FOR BASEPLATE (3.3.2.4) | |||||
| GROUTING ACCESSIBILITY OF BASEPLATE (3.3.2.5) | |||||
| THICKNESS OF SOLEPLATES (3.3.3.1.3) | |||||
| R | W | H | INSPECTION/TESTING ACTIVITY | INSPECTOR’S INITIALS (REVIEW COMPLETE) | DATE |
|---|---|---|---|---|---|
| PRE-ASSEMBLY INSPECTION/TESTING (SEE DRAWINGS AND TEST PROCEDURE) | PRE-ASSEMBLY INSPECTION/TESTING (SEE DRAWINGS AND TEST PROCEDURE) | PRE-ASSEMBLY INSPECTION/TESTING (SEE DRAWINGS AND TEST PROCEDURE) | PRE-ASSEMBLY INSPECTION/TESTING (SEE DRAWINGS AND TEST PROCEDURE) | PRE-ASSEMBLY INSPECTION/TESTING (SEE DRAWINGS AND TEST PROCEDURE) | PRE-ASSEMBLY INSPECTION/TESTING (SEE DRAWINGS AND TEST PROCEDURE) |
| DYNAMIC BALANCE OF COUPLINGS (API 671: 2.5.2, COUPLING DRAWINGS) | |||||
| DYNAMIC BALANCE OF BARE SHAFT (2.9.5.1) | |||||
| DYNAMIC BALANCE OF BALANCE PISTON (2.9.5.1) | |||||
| DYNAMIC BALANCE OF EACH IMPELLER ON MANDREL (2.9.5.1) | |||||
| IMPELLER OVERSPEED TEST (4.3.3;EP 6-2-2: 4.3.3) | |||||
| DIMENSIONAL CHECK OF IMPELLERS AFTER OVERSPEED TEST (4.3.3;EP 6-2-2: 4.3.3) | |||||
| NDE OF IMPELLERS AFTER OVERSPEED TEST (RP 12-2-2: 2.11.5.3) | |||||
| ROTOR ASSEMBLY AND DYNAMIC BALANCING (2.9.5.2, VENDOR BALANCING PROCEDURE) | |||||
| FACE RUNOUTS ON THRUST COLLAR OF COMPLETELY ASSEMBLED ROTOR (2.6.13) | |||||
| IMPELLER/BALANCE PISTON-SPACER GAP CHECK (SEE ASSEMBLY DRAWINGS FOR DIMENSIONS) | |||||
| RESIDUAL UNBALANCE CHECK OF ROTOR ASSEMBLY (2.9.5.3) | |||||
| GAUSS CHECK OF FINAL ROTOR ASSEMBLY (EP 6-2-2: 2.9.5.3) | |||||
| SHAFT END AND COUPLING HUB BLUING CONTACT CHECK (SEE DRAWINGS FOR TOLERANCE) | |||||
| VERIFY SHAFT-IMPELLERS INTERFERENCE FITS | |||||
| VERIFY SHAFT-SHAFT SLEEVES (IMPELLER SPACERS) INTERFERENCE FITS | |||||
| VERIFY SHAFT-BALANCE PISTON INTERFERENCE FIT | |||||
| ROTOR HIGH-SPEED BALANCING (2.9.5.4) | |||||
| R | W | H | INSPECTION/TESTING ACTIVITY | INSPECTOR’S INITIALS (REVIEW COMPLETE) | DATE |
|---|---|---|---|---|---|
| ASSEMBLY INSPECTION (SEE VENDOR’S ASSEMBLY DRAWINGS) | ASSEMBLY INSPECTION (SEE VENDOR’S ASSEMBLY DRAWINGS) | ASSEMBLY INSPECTION (SEE VENDOR’S ASSEMBLY DRAWINGS) | ASSEMBLY INSPECTION (SEE VENDOR’S ASSEMBLY DRAWINGS) | ASSEMBLY INSPECTION (SEE VENDOR’S ASSEMBLY DRAWINGS) | ASSEMBLY INSPECTION (SEE VENDOR’S ASSEMBLY DRAWINGS) |
| CHECK SHAFT-INTERSTAGE DIAPHRAGM CLEARANCES | |||||
| CHECK SHAFT-BEARING CLEARANCES | |||||
| CHECK IMPELLER-CASING AXIAL CLEARANCES | |||||
| CORRECTLY APPLICATION OF CASING BOLTS TORQUING PROCEDURE | |||||
| JACKSCREWS, GUIDE RODS, DOWELS & LIFTING LUGS OPERATIONAL CHECK (2.2.11) | |||||
| MOUNTING OF COUPLING HUB ON SHAFT (SEE COUPLING DRAWINGS AND MANUALS) | |||||
| VERIFY ROTOR AXIAL CLEARANCE (COLD FLOAT) | |||||
| GEAR-DRIVER COUPLING ALIGNMENT | |||||
| COMPRESSOR-GEAR COUPLING ALIGNMENT | |||||
| VERIFY INTER-CONNECTIONS AND LOCATIONS ON CERTIFIED OUTLINE DRAWINGS | |||||
| VERIFY ALL PARTS INSTALLED (SEE DRAWINGS AND BILLS OF MATERIAL) | |||||
| INSTRUMENT AND CONTROL PANELS INSPECTION | INSTRUMENT AND CONTROL PANELS INSPECTION | INSTRUMENT AND CONTROL PANELS INSPECTION | INSTRUMENT AND CONTROL PANELS INSPECTION | INSTRUMENT AND CONTROL PANELS INSPECTION | INSTRUMENT AND CONTROL PANELS INSPECTION |
| PIPING AND WIRING (3.4.3.2; EP 12-1-1: 6.1, 2; EP 12-2-1) | |||||
| TAGGING (3.4.3.2) | |||||
| TEMPERATURE GAUGES (3.4.4.2) | |||||
| THERMOWELLS (3.4.4.3) | |||||
| THERMOCOUPLES & RTD'S (3.4.4.4: EP 6-2-2: 3.4.4.4.1) | |||||
| PRESSURE GAUGES & PRESSURE SENSING ELEMENTS (3.4.4.5) | |||||
| VIBRATION, POSITION, AND BEARING TEMPERATURE DETECTORS (3.4.7) | |||||
| VERIFY ALL PARTS INSTALLED (SEE DRAWINGS AND BILLS OF MATERIAL) | |||||
| PIPING AND APPURTENANCES INSPECTION | PIPING AND APPURTENANCES INSPECTION | PIPING AND APPURTENANCES INSPECTION | PIPING AND APPURTENANCES INSPECTION | PIPING AND APPURTENANCES INSPECTION | PIPING AND APPURTENANCES INSPECTION |
| PIPING CONNECTIONS (3.5.1.3) | |||||
| INSTRUMENT LINES (3.5.1.4, 3.5.2) |
| BEARING-BYPASS PROVISION (3.5.1.7) | |||||
|---|---|---|---|---|---|
| R | W | H | INSPECTION/TESTING ACTIVITY | INSPECTOR’S INITIALS (REVIEW COMPLETE) | DATE |
|---|---|---|---|---|---|
| FUNCTIONAL CHECKS AND TESTING | FUNCTIONAL CHECKS AND TESTING | FUNCTIONAL CHECKS AND TESTING | FUNCTIONAL CHECKS AND TESTING | FUNCTIONAL CHECKS AND TESTING | FUNCTIONAL CHECKS AND TESTING |
| CONTROL PANEL FUNCTIONAL TEST | |||||
| VERIFY ALARM AND SHUTDOWN SETTINGS | |||||
| LUBE OIL CONSOLE FUNCTIONAL TEST (API 614) | |||||
| ADEQUATE CLEARANCE AREAS AND ACCESS FOR OPERATION AND MAINTENANCE | |||||
| JACKSCREWS, GUIDE RODS, DOWELS & LIFTING LUGS FUNCTIONAL CHECK (2.2.11) | |||||
| MECHANICAL RUNNING TEST (4.3.4; EP 6-2-2: 4.3.4) | |||||
| SHOP VERIFICATION OF UNBALANCED RESPONSE ANALYSIS (2.9.3) | |||||
| ASSEMBLED COMPRESSOR GAS-LEAKAGE TEST (4.3.5; EP 6-2-2: 4.3.5.1) | |||||
| PERFORMANCE TEST (4.3.6.1; EP 6-2-2: 4.3.6.1.4) | |||||
| COMPLETE UNIT TEST (4.3.6.2) | |||||
| TANDEM TEST (4.3.6.3) | |||||
| GEAR TEST (4.3.6.4) | |||||
| HELIUM TEST (4.3.6.5) | |||||
| SOUND-LEVEL TEST (4.3.6.6) | |||||
| POST-TEST INSPECTION OF CASING INTERNAL (4.3.6.8) | |||||
| FULL-PRESSURE/FULL-LOAD/FULL-SPEED TEST (4.3.6.9) | |||||
| POST-TEST INSPECTION OF THE HYDRAULIC COUPLING FIT (4.3.6.10) | |||||
| SPARE-PART TEST (4.3.6.11) | |||||
| FINAL INSPECTION AND APPROVAL BEFORE SHIPPING | |||||
| R | W | H | INSPECTION/TESTING ACTIVITY | INSPECTOR’S INITIALS (REVIEW COMPLETE) | DATE |
|---|---|---|---|---|---|
| PREPARATION FOR SHIPMENT | PREPARATION FOR SHIPMENT | PREPARATION FOR SHIPMENT | PREPARATION FOR SHIPMENT | PREPARATION FOR SHIPMENT | PREPARATION FOR SHIPMENT |
| PLUGS FOR TAPPED OPENINGS (2.4.3.7) | |||||
| NAMEPLATE REQUIREMENTS (2.12) | |||||
| EPOXY-PRIMER APPLIED TO GROUTING SURFACES OF MOUNTING PLATE (3.3.1.2.9) | |||||
| CLEANING (4.4.3.3., EP 6-7-1: 6.2.1, 6.2.18) | |||||
| PAINTING, COATING & PRESERVATION (4.4.3.1., 2 & 4; EP 6-7-1: 6.2.4,5) | |||||
| PACKING & PROTECTION (4.4.3.5, 6, 7,12; EP 6-2-2: 4.4.3.10; EP 6-7-1: 6.2.6 , 8, 9, 10, 11, 12 & 14) |
|||||
| PARTS TAGGING & IDENTIFICATION (4.4.3.8, 9, 4.4.4.; EP 6-7-1: 6.2.15, 17) | |||||
| SPARE ROTOR PREPARATION (4.4.3.10) | |||||
| PIPING & AUXILIARY EQUIPMENT FIT-UP (4.4.3.11) | |||||
| INSTALLATION, OPERATION & MAINTENANCE MANUALS (4.4.6, EP 6-7-1: 6.2.16) | |||||
| INSPECTOR SIGN-OFF | INSPECTOR SIGN-OFF | INSPECTOR SIGN-OFF | INSPECTOR SIGN-OFF |
|---|---|---|---|
| INITIALS | NAME | COMPANY | SOCIAL SECURITY NUMBER |
© 2026 Inflection Point Engineering, LLC. All rights reserved. The content of this page — including calculation methods, reference data, written analysis, interactive tools, and source code — is the intellectual property of Inflection Point Engineering, LLC and is protected under applicable copyright, trademark, and trade secret laws. Unauthorized reproduction, redistribution, modification, or derivative use in whole or in part is prohibited without prior written consent.
Disclaimer. This material is provided for informational and educational purposes only and does not constitute professional engineering advice. Calculations, reference data, and methodologies are based on published standards and accepted engineering practice but are not a substitute for engineering judgment, site-specific analysis, or review by a licensed Professional Engineer. Inflection Point Engineering, LLC makes no warranties, express or implied, regarding the accuracy, completeness, or fitness for a particular purpose of any content presented here, and shall not be liable for any direct, indirect, incidental, or consequential damages arising from its use. Users assume all risk associated with applying this content to real-world design, operations, or decisions.
© 2026 Inflection Point Engineering, LLC. All rights reserved.