Section 6 — Rotating Equipment
IPE Engineering Practice IPE-EP-6-2-1C
Document number: IPE-EP-6-2-1C · Section: 6 — Rotating Equipment
THE MANUFACTURER OF EQUIPMENT PURCHASED BY REFINING COMPANY SHALL BE RESPONSIBLE FOR MEETING ALL APPLICABLE REQUIREMENTS OF THE ENGINEERING PRACTICES AND OTHER DOCUMENTS REFERENCED THEREIN REGARDLESS OF WHETHER THE ITEMS ARE INSPECTED BY A REPRESENTATIVE.
THE LATEST EDITION OF THE FOLLOWING STANDARDS AND PUBLICATIONS ARE REFERRED TO HEREIN.
EP 6-2-1 RECIPROCATING COMPRESSORS
EP 10-2-3 MATERIALS HARDNESS REQUIREMENTS
LEVEL 1: ON CALL BY FABRICATOR LEVEL 2: ONCE EVERY TWO WEEKS LEVEL 3: EVERY WEEK
LEVEL 2: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, AND FINAL INSPECTION
LEVEL 3: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, WITNESS POINTS, AND FINAL INSPECTION
LEVEL 4: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, WITNESS POINTS, HOLD POINTS, AND FINAL INSPECTION
| DOCUMENT DESCRIPTION | INSPECTOR'S INITIALS (REVIEW COMPLETE) |
DATE | |
|---|---|---|---|
| 1. | PURCHASE DOCUMENTS | ||
| 2. | DRAWINGS AND SPECIFICATIONS | ||
| 3. | INSTRUCTION MANUAL INCLUDED WITH COMPRESSOR | ||
| 4. | QUALITY CONTROL MANUAL | ||
| 5. | QUALITY CONTROL PLAN | ||
| 6. | MATERIAL RECEIVING SIGN-OFF | ||
| 7. | MATERIAL REQUISITIONS (EP 6-2-1, 2.11.1.4 EP 6-2-1 DATA SHEETS) |
||
| 8. | IMPACT TEST REPORTS (API 610: 2.11.4.1 EP 6-1-1, 2.11.4) |
||
| 9. | MATERIAL TEST REPORTS (API 610: 2.11.2, 3.11) | ||
| 10. | MATERIAL HARDNESS TEST REPORTS | ||
| 11. | UT REPORTS OF CASTINGS (API 610: 4.2.2.3) | ||
| 12. | UT REPORTS OF FORGINGS (API 610: 4.2.2.3) | ||
| 13. | TEST EQUIPMENT CALIBRATION CERTIFICATIONS (EP 6-2-1, 4.3.1.2) | ||
| 14. | WELDING PROCEDURE SPECS. | ||
| 15. | WELDER TRACEABILITY DOCUMENT | ||
| 16. | NDE PROCEDURES | ||
| 17. | NDE TEST REPORTS | ||
| 18. | NDE PERSONNEL CERTIFICATION | ||
| 19. | MFR. PLAN/SHOP TRAVEL | ||
| 20. | IDENTIFICATION OF CRITICAL DIMENSONS | ||
| 21. | SUB-CONTRACTOR Q/C REPORTS | ||
| 22. | AS-BUILT DATA SHEET | ||
| 23. | TEST PROCEDURES | ||
| 24. | TEST PERFORMANCE CURVES | ||
| 25. | SPECIAL TOOL LIST | ||
| 26. | PRESERVATION, PACKAGING AND SHIPPING PROCEDURES (API 610: 5.2.5.8) | ||
| 27. | RELIEF VALVE CERTIFICATION | ||
| 28. | AUTHORIZED WAIVERS AND/OR DEVIATIONS REVIEW | ||
| 29. | REVIEW OF SUBORDERS OF UNPRICED PURCHASE ORDERS TO SUBVENDORS FOR COMPLIANCE WITH ENGINEERING PRACTICES | ||
| 30. | NAMEPLATE RUBBINGS AND/OR CODES | ||
| 31. | LATERAL CRITICAL SPEED ANALYSIS REPORT | ||
| 32. | TORISIONAL ANALYSIS REPORT (5.2.3.2.g) | ||
| 33. | |||
| 34. | |||
| 35. | |||
| 36. | |||
| 37. | |||
| 38. |
R CHECK: THE SHOP INSPECTOR SHALL REVIEW DOCUMENTED RESULTS OF INSPECTION PERFORMED BY VENDOR'S INSPFCTOR OR SUBCONTRACTED INSPECTOR.
W CHECK: INDICATES THE SHOP INSPECTOR SHALL WITNESS ITEMS DURING FABRICATION SHOP SHALL NOTIFY INSPECTOR 2 DAYS IN ADVANCE OF FABRICATION POINT BUT NEED NOT HOLD PRODUCTION FOR INSPECTION.
H CHECK: INDICATES THE SHOP INSPECTOR SHALL INSPECT ITEMS DURING HOLD ON FABRICATION. SHOP SHALL NOTIFY INSPECTOR FIVE DAYS IN ADVANCE OF FABRICATION POINT AND SHALL NOT CONTINUE AFFECTED PRODUCTION UNTIL INSPECTOR PERFORMS AND IMPROVES FABRICATION AFTER INDICATED INSPECTION.
| R | W | H | INSPECTION/TESTING ACTIVITY | INSPECTOR’S INITIALS (REVIEW COMPLETE) | DATE |
|---|---|---|---|---|---|
| PRESSURE VESSELS | |||||
| RT UPS OF WELD ROOTS AND BEVELS | |||||
| WELDING PROCEDURES | |||||
| -PLATE | |||||
| -STEEL CASTINGS | |||||
| UT OF WELDS | |||||
| RT OF WELDS | |||||
| -LOCATION SECTION | |||||
| -FILM REVIEW | |||||
| MPI RESULTS | |||||
| MPI/UT OF NON-RADIOGRAPHABLE NOZZLES | |||||
| UT OF NOZZLES IN CASTINGS | |||||
| PWHT PROCEDURES/REQUIREMENTS REVIEW & APPROVAL | |||||
| PWHT PREPARATIONS | |||||
| FLATNESS CHECK OF GASKET CONTACT SURFACES AFTER PWHT | |||||
| MPI AFTER PWHT | |||||
| RADIOGRAPH AFTER PWHT | |||||
| X-RAY PIPING WELDS | |||||
| -GAS | |||||
| -OIL | |||||
| WELDING REPAIR PROCEDURES | |||||
| PRESSURE TESTS (4.3.1) | |||||
| HYDROSTATIC TEST-CYLINDERS | |||||
| -PRESSURE VESSELS (4.3.1.1c) | |||||
| -FILTERS (4.3.1.2) | |||||
| CYLINDER HELIUM LEAK TEST (4.3.1.2 | |||||
| CYLINDER COOLING WATER |
| COMPARTMENT HYDROSTATIC TEST (4.3.1.1b) | |||||
|---|---|---|---|---|---|
| HYDROSTATIC TEST OF PIPING (4.3.1.1c) |
| DOCUMENT DESCRIPTION (REFERENCES ARE TO API 618 UNLESS OTHERWISE NOTED) |
INSPECTOR'S INITIALS (REVIEW COMPLETE) |
DATE | |
|---|---|---|---|
| 1. | IMPACT TEST REPORTS (2.14.2.b.1) | ||
| 2. | MATERIAL TEST REPORTS (2.14.1.2, 2.14, 2.5, 2.14.4.1.6) | ||
| 3. | NDE PROCEDURES (2.14.4.2, & 3) | ||
| 4. | NDE PERSONNEL CERTIFICATION | ||
| 5. | NDE REPORTS ON CASTINGS (CYLINDERS, DISTANCE PIECE, MAIN FRAME) 2.14.4.2 | ||
| 6. | NDE REPORTS ON FORGINGS (CRANKSHAFT, CONNECTING RODS, CROSSHEAD) 2.14.2 | ||
| 7. | TEST EQUIPMENT CERTIFICATION CALIBRATIONS | ||
| 8. | WELDER QUALIFICATION RECORDS | ||
| 9. | WELDER TRACEABILITY DOCUMENT ASME SECTION VIII COMPLIANCE | ||
| 10. | FABRICATION PLAN/SHOP TRAVELER | ||
| 11. | SUB CONTRACTOR Q/C REPORTS | ||
| 12. | MATERIAL HARDNESS CHECK RESULTS 2.4.1.10 (MAX Rc 22 IN H2S EXPOSED AREAS) | ||
| 13. | CASTING REPAIR PROCEDURES (2.14.3.1, 4.5) | ||
| 14. | AUTHORIZED WAIVERS AND/OR DEVIATIONS REVIEW | ||
| 15. | REVIEW OF SUBORDERS OF UNPRICED PURCHASE ORDERS TO SUBVENDORS FOR COMPLIANCE WITH ENGINEERING PRACTICES | ||
| 16. | |||
| 17. | |||
| 18. | |||
| 19. |
| R | W | H | INSPECTION/TESTING ACTIVITY | INSPECTOR’S INITIALS (REVIEW COMPLETE) | DATE |
|---|---|---|---|---|---|
| MACHINING INSPECTION | MACHINING INSPECTION | MACHINING INSPECTION | MACHINING INSPECTION | MACHINING INSPECTION | MACHINING INSPECTION |
| DIMENSIONAL CHECKS (INCLUDES ID & OD SNAPS, LENGTHS & FACE PARALLELISM) (SEE DRAWINGS) | |||||
| * MAIN FRAME | |||||
| * DISTANCE PIECES | |||||
| * CYLINDERS LINERS | |||||
| * CRANKSHAFT | |||||
| * CONNECTING RODS | |||||
| * PISTON RODS | |||||
| * PISTONS | |||||
| * CROSS HEAD | |||||
| * MAIN BEARINGS | |||||
| * ROD BEARING | |||||
| * CROSS-HEAD BEARINGS | |||||
| * PULSATION DAMPERS | |||||
| * CYLINDER I.D. & PISTON O.D SURFACE FINISH (2.6.2.2) | |||||
| * FLYWHEEL | |||||
| ASSEMBLY INSPECTION (PRIOR TO ASSEMBLY) (SEE DRAWINGS) | ASSEMBLY INSPECTION (PRIOR TO ASSEMBLY) (SEE DRAWINGS) | ASSEMBLY INSPECTION (PRIOR TO ASSEMBLY) (SEE DRAWINGS) | ASSEMBLY INSPECTION (PRIOR TO ASSEMBLY) (SEE DRAWINGS) | ASSEMBLY INSPECTION (PRIOR TO ASSEMBLY) (SEE DRAWINGS) | ASSEMBLY INSPECTION (PRIOR TO ASSEMBLY) (SEE DRAWINGS) |
| CYLINDER-LINER INTEREFERENCE FITS & ID SURFACE FINISH (2.6.2.2) | |||||
| MAIN BEARING-SHAFT CLEARANCE (BRG. IN ROD) | |||||
| ROD BEARING-SHAFT CLEARANCE (BRG.IN ROD) | |||||
| CROSS HEAD PIN-CROSS HEAD CLEARANCE (BRG. IN ROD) | |||||
| CROSS HEAD PIN-CONNECTING ROD CLEARANCE | |||||
| PISTON-CYLINDER CLEARANCE | |||||
| PISTON RING & WEAR BAND CYLINDER CLEARANCES | |||||
| VALVE LIFTS | |||||
| MASTER PARTS LIST | |||||
| INSIDE PAINTING OF FRAME AND DISTANCE PIECES | |||||
| EQUIPMENT & PIPING CLEARANCES (4.2.6) | |||||
| R | W | H | INSPECTION/TESTING ACTIVITY | INSPECTOR’S INITIALS (REVIEW COMPLETE) | DATE |
|---|---|---|---|---|---|
| DURING ASSEMBLY | DURING ASSEMBLY | DURING ASSEMBLY | DURING ASSEMBLY | DURING ASSEMBLY | DURING ASSEMBLY |
| MAIN FRAME IN-PLANE FLATNESS (SAG) | |||||
| MAIN FRAME MAIN BEARING TAUT WIRE TEST | |||||
| MAIN BEARING-CRANKSHAFT CLEARANCE | |||||
| CRANK TROW PARALLELISM | |||||
| CROSS HEAD BEARING CLEARANCE | |||||
| PISTON-PISTON ROD TORQUING (2.8.1) | |||||
| CYLINDER CRANKSHAFT SQUARENESS (TAUT WIRE TEST) | |||||
| DISTANCE PIECE-MAIN FRAME BOLT TORQUES | |||||
| CYLINDER DISTANCE PIECE BOLT TORQUES | |||||
| PISTON RING & WEARBAND RADIAL CLEARANCES | |||||
| MAIN BEARINGS AND CONNECTING ROD BOLT TORQUES | |||||
| ROD DROPS (RUNOUT) (2.6.2.1) | |||||
| PULSATION DEVICES & ALL ASSOCIATED GAS PIPING FIT-UP/CLEARANCES (4.3.3.2) | |||||
| VERIFY ALL PARTS INSTALLED | |||||
| VERIFY INTER CONNECTS AND LOCATION ON CERTIFIED OUTLINE DRAWING | |||||
| CORRECT VALVE INSTALLATION (2.7.3) | |||||
| FUNCTIONAL CHECKS | FUNCTIONAL CHECKS | FUNCTIONAL CHECKS | FUNCTIONAL CHECKS | FUNCTIONAL CHECKS | FUNCTIONAL CHECKS |
| LUBE OIL CONSOLE FUNCTIONAL TEST | |||||
| COOLING WATER CONSOLE FUNCTIONAL TEST | |||||
| RELIEF VALVE FUNCTIONAL TEST | |||||
| MECHANICAL RUN TEST OF COMPLETE COMPRESSOR WHEN APPLICABLE | |||||
| PERFORMANCE TEST OF THE COMPLETE COMPRESSOR WHEN APPLICABLE | |||||
| BAR OVER & CLEARANCE TEST OF THE COMPLETE COMPRESSOR | |||||
| CYLINDER LUBE OIL PUMPING RATE AND FLOW TO ALL CYLINDERS | |||||
| ADEQUATE CLEARANCE AREAS AND ACCESS FOR OPERATION AND MAINTENANCE (2.1.6, 2.6.1.3) | |||||
| VERIFY ALARMS AND SHUTDOWNS | |||||
| CHECK UNLOADER FUNCTION | |||||
| CHECK OUT CONTROL PANEL FUNCTION |
| R | W | H | INSPECTION/TESTING ACTIVITY | INSPECTOR’S INITIALS (REVIEW COMPLETE) | DATE |
|---|---|---|---|---|---|
| PREPARATION TO SHIP | PREPARATION TO SHIP | PREPARATION TO SHIP | PREPARATION TO SHIP | PREPARATION TO SHIP | PREPARATION TO SHIP |
| INSPECT MAIN BEARINGS | |||||
| FLUSH CRANKCASE & APPLY PRESERVATION (4.4.5.3) | |||||
| FLUSH DISTANCE PIECE & APPLY PRESERVATION (4.4.5.3) | |||||
| DRY OUT COOLING WATER PASSAGES AND APPLY PRESERVATION | |||||
| MATCH MARK ALL FLANGES | |||||
| BLOCK CRANKSHAFT (4.4.1) | |||||
| PAINT EXTERIOR NON-MACHINED SURFACES (4.4.5.1) | |||||
| COVER ALL OPENINGS WITH METAL CLOSURES (4.4.5.5. & 6) | |||||
| APPLY RUST PREVENTION TO EXTERIOR MACHINED PARTS | |||||
| INSPECTOR SIGN-OFF | INSPECTOR SIGN-OFF | INSPECTOR SIGN-OFF | INSPECTOR SIGN-OFF |
|---|---|---|---|
| INITIALS | NAME | COMPANY | SOCIAL SECURITY NUMBER |
| SUMMARY: |
|---|
© 2026 Inflection Point Engineering, LLC. All rights reserved. The content of this page — including calculation methods, reference data, written analysis, interactive tools, and source code — is the intellectual property of Inflection Point Engineering, LLC and is protected under applicable copyright, trademark, and trade secret laws. Unauthorized reproduction, redistribution, modification, or derivative use in whole or in part is prohibited without prior written consent.
Disclaimer. This material is provided for informational and educational purposes only and does not constitute professional engineering advice. Calculations, reference data, and methodologies are based on published standards and accepted engineering practice but are not a substitute for engineering judgment, site-specific analysis, or review by a licensed Professional Engineer. Inflection Point Engineering, LLC makes no warranties, express or implied, regarding the accuracy, completeness, or fitness for a particular purpose of any content presented here, and shall not be liable for any direct, indirect, incidental, or consequential damages arising from its use. Users assume all risk associated with applying this content to real-world design, operations, or decisions.
© 2026 Inflection Point Engineering, LLC. All rights reserved.