Inflection Point Engineering Section 5 — Piping

IPE-EP-5-7-1DS

IPE Engineering Practice IPE-EP-5-7-1DS

Document number: IPE-EP-5-7-1DS · Section: 5 — Piping

CoInafsletcatilo nA Prouinbta E nEgningeeirninege Prriancgtic Pesractices Hot Taps Data Sheet PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT EQUIPMENT ID JOB NO. DOCUMENT NO. DATA ISSUED FOR IN-HOUSE REVIEW COASTAL ARUBA REFINING APPROVAL QUOTATION PURCHASE CONSTURCTION THIS SHEET IS A RECORD OF EACH ISSUE OR REVISION TO THE SUBJECT DATA. EACH TIME THE DATA IS ALL DATA SHEETS ATTACHED CHANGED ONLY THE NEW OR REVISED DATA SHEETS NEED TO BE ISSUED. THE EXACT SHEETS CHANGED AND THE NATURE OF THE CHANGE SHOULD BE NOTED UNDER REMARKS. THESE REMARKS ARE NOT A PART OF THE DATA. THE REVISED DATA SHEET(S) BE COME PART OF THE ORIGNAL DATA AND SHALL BE COMPLIED WITH IN THEIR ENTIRETY. REVISED DATA SHEET(S) ONLY ATTACHED REV. DATE BY CHECK APPROVALS REMARKS SECTION PROJECT Coastal Aruba

1. EQUIPMENT/PIPING SYSTEM ID 2. LOCATION 3. PIPING DRAWING NUMBER 4. CONTENTS DESCRIPTION AES (DESCRIPTION) PRESSURE TEMPERATURE FLOW RATE 5. EXISTING PIPING MATERIAL SPECIFICATION MATERIAL CARBON EQUIVALENT OUTSIDE WALL THICKNESS EXISTING WALL THICKNESS WELD JOINT EFFICIENCY ALLOWABLE STRESS CORROSION ALLOWANCE 6. NOZZLE/BRANCH PIPE MATERIAL SPECIFICATION OUTSIDE DIAMTER WALL THICKNESS

CoInafsletcatilo nA Prouinbta E nEgningeeirninege Prriancgtic Pesractices Hot Taps Data Sheet EQUIPMENT ID JOB NO. DOCUMENT NO REV. WELD JOINT EFFICIENCY ALLOWABLES STRESS FLANGE RATING CORROSION ALLOWANCE 7. HOT TAP CONNECTION DESCRIPTION TYPE SIZE REINFORCEMENT 8. HOT TAP VALVE TYPE RATING TRIM MATERIAL GASKETS 9. WELDING REQUIREMENTS WELDER WELD PROCEDURE INDENIFICATION 10. PRESSURE TEST REQUIREMENTS TEST FLUID TEST PRESSURE MDMT(OF) 11. HOT TAP MACHINE REQUIRED OVERHEAD CLEARANCE REQUIRED CUTTER TRAVEL

CoInafsletcatilo nA Prouinbta E nEgningeeirninege Prriancgtic Pesractices Hot Taps Data Sheet EQUIPMENT ID JOB NO. DOCUMENT NO REV. SIGN-OFF PER COASTAL ARUBA ENGINEERING PRACTICE 1. THICKNESS SURVEY APPROVAL DATE 2. HOT TAP LOCATION APPROVAL DATE 3. NOZZLE APPROVAL FIT-UP DATE ROOT-PASS DATE FINAL WELD DATE 4. REINFORCEMENT APPROVAL FIT-UP DATE ROOT-PASS DATE FINAL WELD DATE 5. PRESSURE TEST APPROVAL HOT TAP CONNECTION DATE VALVE DATE HOT TAP MACHINE DTE 6. HOT TAP MACHINE APPROVAL COUPON RETAINER DATE TRAVEL VERIFICATION DATE VALVE CLOSURE DATE COUPON REMOVAL DATE HOT TAP COMPLETION OPERATION DATE MAINTENANCE DATE INSPECTION DATE

CoInafsletcatilo nA Prouinbta E nEgningeeirninege Prriancgtic Pesractices Hot Taps Data Sheet EQUIPMENT ID JOB NO. DOCUMENT NO REV. SPECIAL NOTES

CoInafsletcatilo nA Prouinbta E nEgningeeirninege Prriancgtic Pesractices Hot Taps Data Sheet EQUIPMENT ID JOB NO. DOCUMENT NO REV. SKETCH

CoInafsletcatilo nA Prouinbta E nEgningeeirninege Prriancgtic Pesractices Hot Taps Data Sheet FIGURE 1 EQUIPMENT/HEADER THICKNESS SURVEY A B 10 A & B FLOW 8 4 1 2 6 13 (FACING 11 DIRECTION OF FLOW) A B 12 THICKNESS OF EQUIPMENT/HEADER (MINIMUM THICKNESS FOR WELDING SEE EP 5-7-1) (INDICATE N/A IF NOT APPLICABLE) 1. ATTACHMENT CENTER 2. ATTACHMENT CIRCUMFERENCE 3. ATTACHMENT CIRCUMFERENCE 4. ATTACHMENT CIRCUMFERENCE 5. ATTACHMENT CIRCUMFERENCE 6. REINFORCING PAD 7. REINFORCING PAD 8. REINFORCING PAD 9. REINFORCING PAD 10. REINFORCING SLEEVE LIMITS A B 11. REINFORCING SLEEVE LIMITS A B 12. REINFORCING SLEEVE LIMITS A B 13. REINFORCING SLEEVE LIMITS A B THICKNESS MEASUREMENTS ON BRANCH CONNECTION HIGH LOW LINE CONDITIONS TO BE MAINTAINED DURING WELDING FLOW RATE: PRESSURE: TEMPERATURE: COASTAL ARUBA REFINING INSPECTOR SIGNATURE: DATE NOTE: The pipe, tank, or vessel material in the area of the hot tap shall be free of laminations as verified by ultrasonic examination. The area to be examined shall include all base metal located within a distance of six (6) inches from the hot tap nozzle attachment weld. If the hot tap nozzle is fabricated with a reinforcing pad, this distance shall be measured from the pad outside diameter attachment weld.