Inflection Point Engineering Section 5 — Piping

IPE-EP-5-5-4R

IPE Engineering Practice IPE-EP-5-5-4R

Document number: IPE-EP-5-5-4R · Section: 5 — Piping

CoInafsletcatilo nA Prouinbta E nEgningeeirninege Prriancgtic Pesractices Bolting Procedure for Flanged Connections Installation Record PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT EQUIPMENT ID JOB NO. DOCUMENT NO. DATA ISSUED FOR IN-HOUSE REVIEW COASTAL ARUBA REFINING APPROVAL QUOTATION OTHER PURCHASE CONSTRUCTION THIS SHEET IS A RECORD OF EACH ISSUE OR REVISION TO THE SUBJECT DATA. EACH TIME THE DATA ALL DATA SHEETS ATTACHED IS CHANGED ONLY THE NEW OR REVISED DATA SHEETS NEED TO BE ISSUED. THE EXACT SHEETS CHANGED AND THE NATURE OF THE CHANGE SHOULD BE NOTED UNDER REMARKS. THESE REMARKS ARE NOT A PART OF THE DATA. THE REVISED DATA SHEET(S) BE COME PART OF THE ORIGNAL DATA AND SHALL BE COMPLIED WITH IN THEIR ENTIRETY. REVISED DATA SHEET(S) ONLY ATTACHED REV. DATE BY CHECK APPROVALS REMARKS SECTION PROJECT Coastal Aruba

CoInafsletcatilo nA Prouinbta E nEgningeeirninege Prriancgtic Pesractices Bolting Procedure for Flanged Connections Installation Record EQUIPMENT ID JOB NO. DOCUMENT NO. REV. JOINT LOCATION BOLT MATERIAL BOLT MODULES, PSI BOLT SIZE, IN. EFF. LNGTH., IN STRESS FACTOR TEMP. FACTOR MAT’L VEL REC. BOLT STRESS, PSI DESIRED ∆L, IN. ∆L RANGE, IN. PRESSURE (PSI) / / / / / / TORQUE (FT-LBS) PASS # PASS # PASS # FINAL TEMP. INTIAL __ TEMP. __ TEMP. __ TEMP. PASS BOLT TEMP. LENGTH STRETC STRETC STRETC STRETC H H H H 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28.