Inflection Point Engineering Section 5 — Piping

IPE-EP-5-4-2DS

IPE Engineering Practice IPE-EP-5-4-2DS

Document number: IPE-EP-5-4-2DS · Section: 5 — Piping

CoInafsletcatilo nA Prouinbta E nEgningeeirninege Prriancgtic Pesractices Fabric Expansion Joints Data Sheet PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT EQUIPMENT ID JOB NO. DOCUMENT NO. DATA ISSUED FOR IN-HOUSE REVIEW COASTAL ARUBA REFINING APPROVAL QUOTATION PURCHASE CONSTRUCTION THIS SHEET IS A RECORD OF EACH ISSUE OR REVISION TO THE SUBJECT DATA. EACH TIME THE DATA ALL DATA SHEETS ATTACHED IS CHANGED ONLY THE NEW OR REVISED DATA SHEETS NEED TO BE ISSUED. THE EXACT SHEETS CHANGED AND THE NATURE OF THE CHANGE SHOULD BE NOTED UNDER REMARKS. THESE REMARKS ARE NOT A PART OF THE DATA. THE REVISED DATA SHEET(S) BECOME PART OF THE ORIGINAL DATA REVISED DATA SHEET(S) ONLY AND SHALL BE COMPLIED WITH IN THEIR ENTIRETY. ATTACHED REV. DATE BY CHECK APPROVALS REMARKS SECTION PROJECT Coastal Aruba

1. QUANTITY TYPE (SEE FIG. 1) 2. NEW OR REPLACEMENT -----------------SERVICE---------------------- 3. TYPE OF PLANT/ SERVICE (PRECIPITATOR, SCRUBBER, ETC.): 4. TYPE OF FUEL AND PERCENT SULFUR: (IF APPLICABLE): 5. DEW POINT PH 6. NUMBER OF STARTUP AND SHUTDOWNS 7. LOCATION OF EXPANSION JOINT (INSIDE DIAMETER FAN OUTLET, STACK, ETC.) ------------------SIZE------------------ 8. DUCT SIZE (INSIDE DIMENSIONS OR DIAMETER) 9. MINIMUM CLEARANCE AROUND DUCT 10. FACE TO FACE DIMENSION (IF REPLACEMENT OR REQUIRED) INCHES REQ’D. MAXIMUM -------GAS------- 11. FLOWING MEDIUM (AIR, FLUE GAS, ETC.) 12. DUST LOAD TYPE ABRASIVE? PSF PSF 13. FLOW VELOCITY FPS FPS 14. FLOW DIRECTION (UP, DOWN, HORIZ., ANGULAR UP, ANGULAR DOWN) ---------PRESSURE--------- 15. DESIGN MAXIMUM IN. H2O IN. H2O 16. PRESSURE: NORMAL IN. H2O IN. H2O -------TEMPERATURE------- 17. MAX CONTINUOUS °°°°F °°°°F 18. GAS MAXIMUM TEMPERATURE °°°°F °°°°F 19. TEMPERATURE EXCURSION DURATION PER EVENT HR. HR. 20. (UPSET) CUMULATIVE DURATION HR. HR. 21. AMBIENT MAXIMUM °°°°F °°°°F 22. TEMPERATURE MINIMUM °°°°F °°°°F : -------MOVEMENTS-------- 23. AXIAL COMPRESSION IN. IN. IN. 24. AXIAL EXTENSION IN. IN. IN. 25. LATERAL DEFLECTION IN. IN. IN. 26. IN PLANE OF LATERAL (YES OR NO) Y N Y N Y N ANGULATION DEG. DEG. DEG. 27. TORSION DEG. DEG. DEG. ------------DUCT------------- 28. INTERNAL LINER ROD YES NO OPTIONAL SHIP W/ PRESET DEFLECTIONS YES NO 29. SHIP ASSEMBLED FIELD ASSEMBLED FIELD SPLICE BELT 30. DUCT CORNER (RADIUS OR SQUARE) 31. DUCT MATERIAL DUCT THICKNESS 32. LINER MATERIAL LINER THICKNESS 33. REFRACTORY MATERIAL REFRACTORY THICKNESS NOTES: * NOTE IF POOR AIR CIRCULATION OR OTHER HIGH TEMPERATURE EQUIPMENT ARE PRESENT