Inflection Point Engineering Section 5 — Piping

IPE-EP-5-3-5DS

IPE Engineering Practice IPE-EP-5-3-5DS

Document number: IPE-EP-5-3-5DS · Section: 5 — Piping

CoInafsletcatilo nA Prouinbta E nEgningeeirninege Prriancgtic Pesractices Globe Valves Data Sheet PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT EQUIPMENT ID JOB NO. DOCUMENT NO. DATA ISSUED FOR IN-HOUSE REVIEW COASTAL ARUBA REFINING APPROVAL QUOTATION PURCHASE CONSTRUCTION THIS SHEET IS A RECORD OF EACH ISSUE OR REVISION TO THE SUBJECT DATA. EACH TIME THE DATA ALL DATA SHEETS ATTACHED IS CHANGED ONLY THE NEW OR REVISED DATA SHEETS NEED TO BE ISSUED. THE EXACT SHEETS CHANGED AND THE NATURE OF THE CHANGE SHOULD BE NOTED UNDER REMARKS. THESE REMARKS ARE NOT A PART OF THE DATA. THE REVISED DATA SHEET(S) BE COME PART OF THE ORIGINAL DATA AND SHALL BE COMPLIED WITH IN THEIR ENTIRETY. REVISED DATA SHEET(S) ONLY ATTACHED REV. DATE BY CHECK APPROVALS REMARKS SECTION PROJECT Coastal Aruba

CoInafsletcatilo nA Prouinbta E nEgningeeirninege Prriancgtic Pesractices Globe Valves Data Sheet EQUIPMENT ID JOB NO. DOCUMENT NO REV. *1. VALVE TAG IDENTIFICATION: *2. VALVE SIZE: *3. CLASS: *4. TYPE OF END CONNECTION: 5. INTEGRAL OR WELDED FLANGE: *6. DRAIN CONNECTIONS: *7. SWIVEL PLUG MATERIAL: 8. LANTERN RING: 9. CHAINWHEEL AND CHAIN: 10. GEAR OPERATOR: *11. MOTOR OPERATOR: 12. BYPASS REQUIREMENTS: *13. TYPE OF CONSTRUCTION: *14. VALVE SHELL MATERIAL: 15. BONNET GASKET AND F LANGE FACING: *16. API TRIM NUMBER: 17. STEM PACKING: 18. BONNET BOLT MATERIAL: 19. INSPECTION AND TESTING REQUIREMENTS: 20. HIGH PRESSURE CLOSURE TEST: 21. PACKAGING: * 22. VALVE INSTALLED ORIENTATION: 23. HANDWHEEL: 24. NOTES:

*1. VALVE TAG IDENTIFICATION:
*2. VALVE SIZE:
*3. CLASS:
*4. TYPE OF END CONNECTION:
5. INTEGRAL OR WELDED FLANGE:
*6. DRAIN CONNECTIONS:
*7. SWIVEL PLUG MATERIAL:
8. LANTERN RING:
9. CHAINWHEEL AND CHAIN:
10. GEAR OPERATOR:
*11. MOTOR OPERATOR:
12. BYPASS REQUIREMENTS:
*13. TYPE OF CONSTRUCTION:
*14. VALVE SHELL MATERIAL:
15. BONNET GASKET AND F LANGE FACING:
*16. API TRIM NUMBER:
17. STEM PACKING:
18. BONNET BOLT MATERIAL:
19. INSPECTION AND TESTING REQUIREMENTS:
20. HIGH PRESSURE CLOSURE TEST:
21. PACKAGING:
* 22. VALVE INSTALLED ORIENTATION:
23. HANDWHEEL:
24. NOTES: