Section 5 — Piping
IPE Engineering Practice IPE-EP-5-3-3DS
Document number: IPE-EP-5-3-3DS · Section: 5 — Piping
CoInafsletcatilo nA Prouinbta E nEgningeeirninege Prriancgtic Pesractices Gate Valves Data Sheet PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT EQUIPMENT ID JOB NO. DOCUMENT NO. DATA ISSUED FOR IN-HOUSE REVIEW COASTAL ARUBA APPROVAL QUOTATION PURCHASE CONSTRUCTION THIS SHEET IS A RECORD OF EACH ISSUE OR REVISION TO THE SUBJECT DATA. EACH TIME THE DATA ALL DATA SHEETS ATTACHED IS CHANGED ONLY THE NEW OR REVISED DATA SHEETS NEED TO BE ISSUED. THE EXACT SHEETS CHANGED AND THE NATURE OF THE CHANGE SHOULD BE NOTED UNDER REMARKS. THESE REMARKS ARE NOT A PART OF THE DATA. THE REVISED DATA SHEET(S) BE COME PART OF THE ORIGINAL DATA REVISED DATA SHEET(S) ONLY AND SHALL BE COMPLIED WITH IN THEIR ENTIRETY. ATTACHED REV. DATE BY CHECK APPROVALS REMARKS SECTION PROJECT Coastal Aruba
CoInafsletcatilo nA Prouinbta E nEgningeeirninege Prriancgtic Pesractices Gate Valves Data Sheet EQUIPMENT ID JOB NO. DOCUMENT NO REV. *1. VALVE TAG IDENTIFICATION: *2. VALVE SIZE: *3. CLASS: *4. VALVE END CONNECTION TYPE: *5. WELDED END FLANGES: *6. BLEED AND DRAIN CONNECTIONS: *7. WEDGE TYPE: 8. LANTERN RING: 9. CHAINWHEEL CHAIN: 10. GEAR OPERATOR: *11. MOTOR OPERATOR: 12. BYPASS REQUIREMENTS: 13. VALVE SHELL MATERIAL: 14. BONNET GASKET AND FLANGE FACING: 15. API TRIM NUMBER: 16. STEM PACKING: 17. BONNET BOLT MATERIAL: 18. INSPECTION AND TESTING REQUIREMENTS: 19. HIGH PRESSURE CLOSURE TEST: 20. PACKAGING: *21. ORIENTATION OF INSTALLED VALVE: 22, HANDWHEELS: 23. NOTES:
| *1. VALVE TAG IDENTIFICATION: |
|---|
| *2. VALVE SIZE: |
| *3. CLASS: |
| *4. VALVE END CONNECTION TYPE: |
| *5. WELDED END FLANGES: |
| *6. BLEED AND DRAIN CONNECTIONS: |
| *7. WEDGE TYPE: |
| 8. LANTERN RING: |
| 9. CHAINWHEEL CHAIN: |
| 10. GEAR OPERATOR: |
| *11. MOTOR OPERATOR: |
| 12. BYPASS REQUIREMENTS: |
| 13. VALVE SHELL MATERIAL: |
| 14. BONNET GASKET AND FLANGE FACING: |
| 15. API TRIM NUMBER: |
| 16. STEM PACKING: |
| 17. BONNET BOLT MATERIAL: |
| 18. INSPECTION AND TESTING REQUIREMENTS: |
| 19. HIGH PRESSURE CLOSURE TEST: |
| 20. PACKAGING: |
| *21. ORIENTATION OF INSTALLED VALVE: |
| 22, HANDWHEELS: |
| 23. NOTES: |
© 2026 Inflection Point Engineering, LLC. All rights reserved. The content of this page — including calculation methods, reference data, written analysis, interactive tools, and source code — is the intellectual property of Inflection Point Engineering, LLC and is protected under applicable copyright, trademark, and trade secret laws. Unauthorized reproduction, redistribution, modification, or derivative use in whole or in part is prohibited without prior written consent.
Disclaimer. This material is provided for informational and educational purposes only and does not constitute professional engineering advice. Calculations, reference data, and methodologies are based on published standards and accepted engineering practice but are not a substitute for engineering judgment, site-specific analysis, or review by a licensed Professional Engineer. Inflection Point Engineering, LLC makes no warranties, express or implied, regarding the accuracy, completeness, or fitness for a particular purpose of any content presented here, and shall not be liable for any direct, indirect, incidental, or consequential damages arising from its use. Users assume all risk associated with applying this content to real-world design, operations, or decisions.
© 2026 Inflection Point Engineering, LLC. All rights reserved.