CoInafsletcatilo nA Prouinbta E nEgningeeirninege Prriancgtic Pesractices Double Flanged High Performance Rotary Valves for Hydrocarbon Service Data Sheet PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT EQUIPMENT ID JOB NO. DOCUMENT NO. DATA ISSUED FOR IN-HOUSE REVIEW COASTAL ARUBA REFINING APPROVAL QUOTATION PURCHASE CONSTRUCTION THIS SHEET IS A RECORD OF EACH ISSUE OR REVISION TO THE SUBJECT DATA. EACH TIME THE DATA IS ALL DATA SHEETS ATTACHED CHANGED ONLY THE NEW OR REVISED DATA SHEETS NEED TO BE ISSUED. THE EXACT SHEETS CHANGED AND THE NATURE OF THE CHANGE SHOULD BE NOTED UNDER REMARKS. THESE REMARKS ARE NOT A PART OF THE DATA. THE REVISED DATA SHEET(S) BE COME PART OF THE ORIGINAL DATA AND SHALL BE COMPLIED WITH IN THEIR ENTIRETY. REVISED DATA SHEET(S) ONLY ATTACHED REV DATE BY CHECK APPROVALS REMARKS . SECTION PROJECT Coastal Aruba

CoInafsletcatilo nA Prouinbta E nEgningeeirninege Prriancgtic Pesractices Double Flanged High Performance Rotary Valves for Hydrocarbon Service Data Sheet EQUIPMENT JOB NO. DOCUMENT NO REV. ID * 1. VALVE TAG IDENTIFICATION: * 2. VALVE SIZE: * 3. CLASS: * 4. VALVE CATEGORY: * 5. END CONNECTION: * 6. COMPANION FLANGE: * 7. OPERATOR: * 8. MATERIALS OF CONSTRUCTION: SHELL: TRIM: SEAT RETAINER: STEM PACKING AND SHAFT SEAL: GLAND BOLTING: GASKETS: * 9. FLOW (UNIDIRECTIONAL OR BIDIRECTIONAL): * 10. DEAD END SERVICE: * 11. ON-OFF OR THROTTLING SERVICE: 12. EXTERNAL COATING: * 13. LUG BOLT HOLES: N/A: 14. ALLOWABLE GASKET SURFACE INTERRUPTIONS: 15. INSPECTION AND TESTING REQUIREMENTS: 16. PACKAGING: 17. FACE-TO-FACE PATTERN FOR DOUBLE FLANGED VALVES: 18. ELECTRICAL CONTINUITY: 19. INTEGRAL OR WELDED FLANGES: 20. DRAIN OR BYPASS CONNECTIONS: 21. LOCKABLE DEVICE: 22. FIRESAFE: * 23. STEM ORIENTATION: * 24. NOTES:

* 1. VALVE TAG IDENTIFICATION:
* 2. VALVE SIZE:
* 3. CLASS:
* 4. VALVE CATEGORY:
* 5. END CONNECTION:
* 6. COMPANION FLANGE:
* 7. OPERATOR:
* 8. MATERIALS OF CONSTRUCTION:
SHELL:
TRIM:
SEAT RETAINER:
STEM PACKING AND SHAFT SEAL:
GLAND BOLTING:
GASKETS:
* 9. FLOW (UNIDIRECTIONAL OR BIDIRECTIONAL):
* 10. DEAD END SERVICE:
* 11. ON-OFF OR THROTTLING SERVICE:
12. EXTERNAL COATING:
* 13. LUG BOLT HOLES: N/A:
14. ALLOWABLE GASKET SURFACE INTERRUPTIONS:
15. INSPECTION AND TESTING REQUIREMENTS:
16. PACKAGING:
17. FACE-TO-FACE PATTERN FOR DOUBLE FLANGED VALVES:
18. ELECTRICAL CONTINUITY:
19. INTEGRAL OR WELDED FLANGES:
20. DRAIN OR BYPASS CONNECTIONS:
21. LOCKABLE DEVICE:
22. FIRESAFE:
* 23. STEM ORIENTATION:
* 24. NOTES: