Section 5 — Piping
IPE Engineering Practice IPE-EP-5-3-19DS
Document number: IPE-EP-5-3-19DS · Section: 5 — Piping
CoInafsletcatilo nA Prouinbta E nEgningeeirninege Prriancgtic Pesractices FCCU Slide Valves Data Sheet PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT EQUIPMENT ID JOB NO. DOCUMENT NO. DATA ISSUED FOR IN-HOUSE REVIEW COASTAL ARUBA REFINING APPROVAL QUOTATION PURCHASE CONSTRUCTION THIS SHEET IS A RECORD OF EACH ISSUE OR REVISION TO THE SUBJECT DATA. EACH TIME THE DATA ALL DATA SHEETS ATTACHED IS CHANGED ONLY THE NEW OR REVISED DATA SHEETS NEED TO BE ISSUED. THE EXACT SHEETS CHANGED AND THE NATURE OF THE CHANGE SHOULD BE NOTED UNDER REMARKS. THESE REMARKS ARE NOT A PART OF THE DATA. THE REVISED DATA SHEET(S) BE COME PART OF THE ORIGINAL DATA AND SHALL BE COMPLIED WITH IN THEIR ENTIRETY. REVISED DATA SHEET(S) ONLY ATTACHED REV DATE BY CHECK APPROVALS REMARKS . SECTION PROJECT Coastal Aruba
CoInafsletcatilo nA Prouinbta E nEgningeeirninege Prriancgtic Pesractices FCCU Slide Valves Data Sheet EQUIPMENT ID JOB NO. DOCUMENT NO REV. *1. SERVICE *2. VALVE TYPE *3. HOT OR COLD WALL *4. DESIGN INTERNAL TEMP.°F *5. MIN DESIGN METAL TEMP.°F *6. DESIGN PRESSURE, PSIG *7. DESIGN ∆P, PSI *8. CORROSION ALLOWANCE OPERATING CASES NORMAL CASE 2 CASE 3 CASE 4 *9. MATERIAL HANDLED (MEDIA) *10. PROCESS TEMPERATURE,°F *11. MOLECULAR WEIGHT *12. UPSTREAM PRESSURE, PSIG *13. DOWNSTREAM PRESSURE, PSIG *14. WET FLOW RATE & UNITS *15. UPSTEAM DENSITY *16. FLOW DIRECTION 17. PORT OPENING, % OF AREA *18. TIME, HOURS *19. BLAST CONDITION *20. EXISTING ACTUATOR 21. ORIFICE SHAPE *22. ORIFICE AREA 23. ORIFICE POSITION *24. ORIFICE LINING *25. DISC EDGE *26. MINIMUM FLOW AREA *27. DISC LINING 28. INTERNAL MATERIAL 29. BODY/BONNET MATERIAL *30. INSULATING REFRACTORY *31. EROSION RESISTANT LINING *32. REFRACTORY ID 33. UPSTREAM END 34. DOWNSTREAM END *35. LIP SEAL *36. PURGE CONNECTIONS *37. FLANGE CLASS (AUXILIARY) *38. GEOMETRY LIMITATIONS
CoInafsletcatilo nA Prouinbta E nEgningeeirninege Prriancgtic Pesractices FCCU Slide Valves Data Sheet EQUIPMENT ID JOB NO. DOCUMENT NO REV. *39. FEA REQUIRED (Y/N) *40. UPSTREAM LOADS ON VALVE FX (kips) MX (inch-kip) ESTIMATE OF LOADS FY (kips) MY (inch-kip) LOADS COMPUTED FZ (kips) MZ (inch-kip) FROM PIPING ANALYSIS *41. DOWNSTREAM LOADS ON VALVES FX (kips) MX (inch-kip) ESTIMATE OF LOADS FY (kips) MY (inch-kip) LOADS COMPUTED FZ (kips) MZ (inch-kip) FROM PIPING ANALYSIS 42. NOTES
© 2026 Inflection Point Engineering, LLC. All rights reserved. The content of this page — including calculation methods, reference data, written analysis, interactive tools, and source code — is the intellectual property of Inflection Point Engineering, LLC and is protected under applicable copyright, trademark, and trade secret laws. Unauthorized reproduction, redistribution, modification, or derivative use in whole or in part is prohibited without prior written consent.
Disclaimer. This material is provided for informational and educational purposes only and does not constitute professional engineering advice. Calculations, reference data, and methodologies are based on published standards and accepted engineering practice but are not a substitute for engineering judgment, site-specific analysis, or review by a licensed Professional Engineer. Inflection Point Engineering, LLC makes no warranties, express or implied, regarding the accuracy, completeness, or fitness for a particular purpose of any content presented here, and shall not be liable for any direct, indirect, incidental, or consequential damages arising from its use. Users assume all risk associated with applying this content to real-world design, operations, or decisions.
© 2026 Inflection Point Engineering, LLC. All rights reserved.