Inflection Point Engineering Section 5 — Piping

IPE-EP-5-3-18DS

IPE Engineering Practice IPE-EP-5-3-18DS

Document number: IPE-EP-5-3-18DS · Section: 5 — Piping

CoInafsletcatilo nA Prouinbta E nEgningeeirninege Prriancgtic Pesractices Flue Gas Block and Bypass Valve Data Sheet PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT EQUIPMENT ID JOB NO. DOCUMENT NO. DATA ISSUED FOR IN-HOUSE REVIEW COASTAL ARUBA REFINING APPROVAL QUOTATION PURCHASE CONSTRUCTION THIS SHEET IS A RECORD OF EACH ISSUE OR REVISION TO THE SUBJECT DATA. EACH TIME THE DATA ALL DATA SHEETS ATTACHED IS CHANGED ONLY THE NEW OR REVISED DATA SHEETS NEED TO BE ISSUED. THE EXACT SHEETS CHANGED AND THE NATURE OF THE CHANGE SHOULD BE NOTED UNDER REMARKS. THESE REMARKS ARE NOT A PART OF THE DATA. THE REVISED DATA SHEET(S) BE COME PART OF THE ORIGINAL DATA AND SHALL BE COMPLIED WITH IN THEIR ENTIRETY. REVISED DATA SHEET(S) ONLY ATTACHED REV. DATE BY CHECK APPROVALS REMARKS SECTION PROJECT Coastal Aruba

CoInafsletcatilo nA Prouinbta E nEgningeeirninege Prriancgtic Pesractices Flue Gas Block and Bypass Valve Data Sheet EQUIPMENT ID JOB NO. DOCUMENT NO REV. *1. SERVICE *2. VALVE TYPE *3. HOT OR COLD WALL *4. DESIGN INTERNAL TEMP, °F *5. DESIGN PRESSURE, PSIG *6. DESIGN ∆∆∆∆P, PSI *7. CORROSION ALLOWANCE OPERATING CASES NORMAL CASE 2 CASE 3 CASE 4 *8. MATERIAL HANDLED (MEDIA) *9. PROCESS TEMPERATURE,°F *10. MOLECULAR WEIGHT *11. UPSTREAM PRESSURE, PSIG *12. DOWNSTREAM PRESSURE, PSIG *13. FLOW RATE *14. FLOWING DIRECTION *15. MAXIMUM LEAKAGE RATE *16. TIME, HOURS *17. SEAL AIR *18. SEATS CLOSE *19. ACTUATOR TYPE *20. EXISTING ACTUATOR *21. VALVE STROKE TIME, SEC. *22. ACTUATOR SUPPORT *23. MINIMUM CV 24. INTERNAL MATERIAL 25. BODY/BONNET MATERIAL *26. INSULATING REFRACTORY *27. EROSION RESISTANT LINING *28. REFRACTORY ID *29. UPSTREAM END *30. DOWNSTREAM END *31. PURGE CONNECTIONS *32. FLANGE CLASS (AUXILIARY) *33. GEOMETRY LIMITATIONS *34. SOURCE INSPECTION *35. LEAK TEST *36. FEA REQUIRED (Y/N) *37. UPSTREAM LOADS ON VALVE FX (kips) MX (in-kip) ESTIMATE OF LOADS FY (kips) MY (in-kip) LOAD COMPUTED FROM PIPING ANALYSIS FZ (kips) MZ (in-kip) *38. DOWNSTREAM LOADS ON VALVES (K-LB, K-FT-LB) FX (kips) MX (in-kip) ESTIMATE OF LOADS FY (kips) MY (in-kip) LOAD COMPUTED FROM PIPING ANALYSIS FZ (kips) MZ (in-kip)

CoInafsletcatilo nA Prouinbta E nEgningeeirninege Prriancgtic Pesractices Flue Gas Block and Bypass Valve Data Sheet EQUIPMENT JOB DOCUMENT REV. ID NO. NO NOTES: