CoInafsletcatilo nA Prouinbta E nEgningeeirninege Prriancgtic Pesractices Ball Valves Data Sheet PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT EQUIPMENT ID JOB NO. DOCUMENT NO. DATA ISSUED FOR IN-HOUSE REVIEW COASTAL ARUBA REFINING APPROVAL QUOTATION PURCHASE CONSTRUCTION THIS SHEET IS A RECORD OF EACH ISSUE OR REVISION TO THE SUBJECT DATA. EACH TIME THE DATA ALL DATA SHEETS ATTACHED IS CHANGED ONLY THE NEW OR REVISED DATA SHEETS NEED TO BE ISSUED. THE EXACT SHEETS CHANGED AND THE NATURE OF THE CHANGE SHOULD BE NOTED UNDER REMARKS. THESE REMARKS ARE NOT A PART OF THE DATA. THE REVISED DATA SHEET(S) BE COME PART OF THE ORIGNAL DATA AND SHALL BE COMPLIED WITH IN THEIR ENTIRETY. REVISED DATA SHEET(S) ONLY ATTACHED REV. DATE BY CHECK APPROVALS REMARKS SECTION PROJECT Coastal Aruba

CoInafsletcatilo nA Prouinbta E nEgningeeirninege Prriancgtic Pesractices Ball Valves Data Sheet EQUIPMENT ID JOB NO. DOCUMENT NO REV. *1. VALVE TAG IDENTIFICATION: *2. VALVE SIZE: *3. CLASS: *4. VALVE END CONNECTION TYPE: *5. INTEGRAL OR WELDED EXTENSION OR FLANGE: *6. MATERIALS OF CONSTRUCTION: *7. SEAT MATERIALS: *8. BLEED AND DRAIN CONNECTIONS: *9. VALVE PORT SIZE: *10. ELECTRICAL CONTINUITY: *11. OPERATOR: *12. TYPE OF CONSTRUCTION: *13. EXTERNAL COATING: *14. BODY CAVITY OVERPRESSURE PROTECTION: *15. STEM PACKING: *16. INSPECTION AND TESTING REQUIREMENTS: *17. HIGH PRESSURE CLOSURE TEST: *18. PACKAGING *19. FIRESAFE: *20. NOTES:

*1. VALVE TAG IDENTIFICATION:
*2. VALVE SIZE:
*3. CLASS:
*4. VALVE END CONNECTION TYPE:
*5. INTEGRAL OR WELDED EXTENSION OR FLANGE:
*6. MATERIALS OF CONSTRUCTION:
*7. SEAT MATERIALS:
*8. BLEED AND DRAIN CONNECTIONS:
*9. VALVE PORT SIZE:
*10. ELECTRICAL CONTINUITY:
*11. OPERATOR:
*12. TYPE OF CONSTRUCTION:
*13. EXTERNAL COATING:
*14. BODY CAVITY OVERPRESSURE PROTECTION:
*15. STEM PACKING:
*16. INSPECTION AND TESTING REQUIREMENTS:
*17. HIGH PRESSURE CLOSURE TEST:
*18. PACKAGING
*19. FIRESAFE: