Section 5 — Piping
IPE Engineering Practice IPE-EP-5-0-0
Document number: IPE-EP-5-0-0 · Section: 5 — Piping
TITLE ............................................................................................................................. EP REV
No. No.
Table of Contents..................................................................................................5–0–0 1.0
General Piping Design ..........................................................................................5–1–1 1.0
Piping Layout ........................................................................................................5–1–2 1.0
Piping Stress Analysis and Supports....................................................................5–1–3 1.0
Standard Piping Supports (Deleted).....................................................................5–1–4 1.0
Piping System Line Numbering ............................................................................5–1–5 1.0
Selection of Piping Components and Materials ....................................................5–2–1 1.0
Flanges, Gaskets and Bolting ...............................................................................5–2–2 1.0
IPE Piping Standards...................................................................................5–2–3 1.0
Supplemental Requirements for Pipe and Piping Components ...........................5–2–4 1.0
IPE Piping Standards Database Format .....................................................5–2–5 1.0
Valve Design and Selection Criteria .....................................................................5–3–1 1.0
Valve Data Sheet ..................................................................................................5–3–2 1.0
Gate Valves ..........................................................................................................5–3–3 1.0
Gate Valves Data Sheet ..................................................................................5–3–3DS 1.0
Cast Iron and Ductile Iron Gate Valves, Flanged Ends (Deleted)........................5–3–4 1.0
Cast Iron and Ductile Iron Gate Valves, Flanged Ends Data Sheet
(Deleted)…………………………………………………………………................5–3–4DS 1.0
Globe Valves.............................................................................................................5–3–5 1.0
Globe Valves Data Sheet ................................................................................5–3–5DS 1.0
Compact and Extended Body Gate and Globe Valves.........................................5–3–6 1.0
Compact and Extended Body Gate and Globe Valves Data Sheet ................5–3–6DS 1.0
Bellows Seal Valves (Deleted)..............................................................................5–3–7 1.0
Bellows Seal Valves Data Sheet (Deleted)......................................................5–3–7DS 1.0
Check Valves ........................................................................................................5–3–8 1.0
Check Valves Data Sheet ................................................................................5–3–8DS 1.0
Plug Valves ...........................................................................................................5–3–9 1.0
Plug Valves Data Sheet ...................................................................................5–3–9DS 1.0
Ball Valves ..........................................................................................................5–3–10 1.0
Ball Valves Data Sheet ..................................................................................5–3–10DS 1.0
Butterfly Valves for Hydrocarbon Service ...........................................................5–3–11 1.0
Butterfly Valves for Hydrocarbon Service Data Sheet ...................................5–3–11DS 1.0
Butterfly Valves for Utility Service .......................................................................5–3–12 1.0
Butterfly Valves for Utility Service Data Sheet...............................................5–3–12DS 1.0
Cyclic Reformer Motor Operated Valves (Deleted).............................................5–3–13 1.0
Cyclic Reformer Motor Operated Valves Data Sheet (Deleted).....................5–3–13DS 1.0
Pressure Relief Valves........................................................................................5–3–14 1.0
Pressure Relief Valves Data Sheet ...............................................................5–3–14DS 1.0
Rupture Disk Devices (Deleted)..........................................................................5–3–15 1.0
Rupture Disk Devices Data Sheet (Deleted)..................................................5–3–15DS 1.0
Three–Way Valves for Tandem PRV Installations (Deleted) ............................5–3–16 1.0
Control Valves, Actuators and Accessories .......................................................5–3–17 1.0
Control Valves, Actuators and Accessories Data Sheet...............................5–3–17DS 1.0
Flue Gas Block and Bypass Valves (Deleted).....................................................5–3–18 1.0
Flue Gas Block and Bypass Valves Data Sheet (Deleted)............................5–3–18DS 1.0
Flue Gas Block and Bypass Valves Inspection Checklist (Deleted)................ 5–3–18C 1.0
FCCU Slide Valves (Deleted)..............................................................................5–3–19 1.0
FCCU Slide Valves Data Sheet (Deleted)......................................................5–3–19DS 1.0
FCCU Slide Valves Inspection Checklist (Deleted).......................................... 5–3–19C 1.0
Double Flanged High Performance Rotary Valves for Hydrocarbon Service
(Deleted)…………………………………………………………………………….....5–3–20 1.0
Double Flanged High Performance Rotary Valves for Hydrocarbon
Service Data Sheet (Deleted).........................................................................5–3–20DS 1.0
Supplemental Requirements for Valves .............................................................5–3–21 1.0
Supplemental Requirements for Valves Inspection Checklist ......................... 5–3–21C 1.0
Valve Packing .....................................................................................................5–3–23 1.0
Valve Inspection and Testing..............................................................................5–3–24 1.0
Valve Inspection and Testing Checklist ........................................................... 5–3–24C 1.0
Metal Expansion Joints .........................................................................................5–4–1 1.0
Metal Expansion Joints Data Sheet.................................................................5–4–1DS 1.0
Metal Expansion Joints Inspection Checklist..................................................... 5–4–1C 1.0
Fabric Expansion Joints........................................................................................5–4–2 1.0
Fabric Expansion Joints Data Sheet................................................................5–4–2DS 1.0
Supplemental Requirements for Expansion Joints ...............................................5–4–3 1.0
Flexible Metal Hoses.............................................................................................5–4–4 1.0
Flexible Metal Hoses Data Sheet ....................................................................5–4–4DS 1.0
Strainers for Rotating and Other Equipment ........................................................5–4–5 1.0
Piping Fabrication .................................................................................................5–5–1 1.0
Piping Fabrication Inspection Checklist ............................................................. 5–5–1C 1.0
Welding Requirements for Piping .........................................................................5–5–2 1.0
Piping Erection and Testing ..................................................................................5–5–3 1.0
Bolting Procedures for Flanged Connections .......................................................5–5–4 1.0
Bolting Procedures for Flanged Connections Installation Record ..................... 5–5–4R 1.0
Supplemental Fabrication Requirements for Jacketed Piping (Deleted)..............5–5–5 1.0
Supplemental Requirements for Fabricated Piping ..............................................5–5–6 1.0
Supplemental Requirements for Pneumatic Testing of New Piping Systems ......5–5–7 1.0
Supplemental Requirements for ASME Code Section 1 Piping ...........................5–5–8 1.0
Piping for Atmospheric and Low Pressure Storage Tanks ...................................5–6–1 1.0
Piping for Rotating Equipment ..............................................................................5–6–2 1.0
Piping for Fired Heaters ........................................................................................5–6–3 1.0
Piping for Pressure Relief Systems ......................................................................5–6–4 1.0
Piping for Instruments ...........................................................................................5–6–5 1.0
Steam Piping..............................................................................................................5–6–6 1.0
Steam Traps .........................................................................................................5–6–7 1.0
Steam Tracing............................................................................................................5–6–8 1.0
Hot Taps ...............................................................................................................5–7–1 1.0
Hot Taps Data Sheet .......................................................................................5–7–1DS 1.0
Tie–Ins .......................................................................................................................5–7–2 1.0
Tie–Ins Data Sheet ..........................................................................................5–7–2DS 1.0
Piping and Design of Manual Sampling Systems.................................................5–8–1 1.0
Design and Installation of Non–Metallic Piping ....................................................5–9–1 1.0
Plastic–Lined Metallic Pipe ...................................................................................5–9–2 1.0
Cement–Lined Pipe and Fittings (Deleted)............................................................5–9–3 1.0
Supplemental Requirements for Piping in HF–Service (Phillips) (Deleted).........5–10–1 1.0
Supplemental Requirements for Piping in HF–Service at Trainer (UOP)
(Deleted)………………………………………………………………………...........5–10–2 1.0
Supplemental Requirements for Piping in Gaseous Oxygen Service ................5–10–3 1.0
Integrity Guidelines for Pipelines (Deleted) ........................................................5–11–1 1.0
Inspection, Repair, Alteration, Rerating and Fitness for Service of
In–Service Piping Systems .................................................................................5–11–2 1.0
On–Stream Leak Repairs of Piping Components...............................................5–11–3 1.0
On–Stream Leak Repairs of Piping Components Data Sheet ......................5–11–3DS 1.0
Installation of Repair Patches and Sleeves (Deleted).........................................5–11–4 1.0
Valve Reconditioning–Gate, Globe, Check, Ball and Plug
Valves (Deleted) .................................................................................................5–11–5 1.0
Valve Reconditioning–Pressure Relief Valves (Deleted) ...................................5–11–6 1.0
Valve Reconditioning– FCCU Slide Valves (Deleted) ........................................5–11–7 1.0
Valve Reconditioning– Control Valves (Deleted) ...............................................5–11–8 1.0
© 2026 Inflection Point Engineering, LLC. All rights reserved. The content of this page — including calculation methods, reference data, written analysis, interactive tools, and source code — is the intellectual property of Inflection Point Engineering, LLC and is protected under applicable copyright, trademark, and trade secret laws. Unauthorized reproduction, redistribution, modification, or derivative use in whole or in part is prohibited without prior written consent.
Disclaimer. This material is provided for informational and educational purposes only and does not constitute professional engineering advice. Calculations, reference data, and methodologies are based on published standards and accepted engineering practice but are not a substitute for engineering judgment, site-specific analysis, or review by a licensed Professional Engineer. Inflection Point Engineering, LLC makes no warranties, express or implied, regarding the accuracy, completeness, or fitness for a particular purpose of any content presented here, and shall not be liable for any direct, indirect, incidental, or consequential damages arising from its use. Users assume all risk associated with applying this content to real-world design, operations, or decisions.
© 2026 Inflection Point Engineering, LLC. All rights reserved.