Inflection Point Engineering Section 4 — Structures and Foundations

Sewer System Inspection Checklist

IPE Engineering Practice IPE-EP-4-8-1C

Document number: IPE-EP-4-8-1C · Section: 4 — Structures and Foundations

THE MANUFACTURER OF EQUIPMENT PURCHASED BY INFLECTION POINT ENGINEERING, LLC SHALL BE RESPONSIBLE FOR MEETING ALL APPLICABLE REQUIREMENTS OF THE IPE ENGINEERING PRACTICES AND OTHER DOCUMENTS REFERENCED THEREIN REGARDLESS OF WHETHER THE ITEMS ARE INSPECTED BY A IPE REPRESENTATIVE.

REFERENCES

THE LATEST EDITION OF THE FOLLOWING STANDARDS AND PUBLICATIONS ARE REFERRED TO HEREIN.

IPE ENGINEERING PRACTICES

EP 4-8-1 SEWER SYSTEMS

EP 4-8-2 TYPICAL SEWER DETAILS

FREQUENCY OF CONTACT BY THE INSPECTOR: (CHECK ONE)

LEVEL 1: ON CALL BY FABRICATOR LEVEL 2: ONCE EVERY TWO WEEKS LEVEL 3: EVERY WEEK

LEVEL 4: DAILY

LEVEL 5: RESIDENT

LEVEL 6: OTHER, SPECIFY

LEVEL OF INSPECTION BY THE INSPECTOR: (CHECK ONE)

LEVEL 1: PREFABRICATION MEETING, DOCUMENT REVIEW, AND FINAL INSPECTION

LEVEL 2: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, AND FINAL INSPECTION LEVEL 3: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, WITNESS POINTS, AND FINAL

INSPECTION

LEVEL 4: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, WITNESS POINTS, HOLD POINTS, AND FINAL INSPECTION

LEVEL 5: OTHER, SPECIFY

R CHECK: THE SHOP INSPECTOR SHALL REVIEW DOCUMENTED RESULTS OF INSPECTION PERFORMED BY VENDOR'S INSPECTION OR SUBCONTRACTED INSPECTOR.

W CHECK: INDICATES THE SHOP INSPECTOR SHALL WITNESS ITEM DURING FABRICATION. SHOP SHALL NOTIFY INSPECTOR TWO DAYS IN ADVANCE OF FABRICATION POINT BUT NEED NOT HOLD PRODUCTION FOR INSPECTION.

H CHECK: INDICATES THE SHOP INSPECTOR SHALL INSPECT ITEM DURING HOLD ON FABRICATION. SHOP SHALL NOTIFY INSPECTOR FIVE DAYS IN ADVANCE OF FABRICATION POINT AND SHALL NOT CONTINUE AFFECTED PRODUCTION UNTIL INSPECTOR PERFORMS INDICATED INSPECTION.

R W H INSPECTION/TESTING ACTIVITY INSPECTOR'S INITIALS (REVIEW COMPLETE) DATE
MANHOLES AND CATCH BASIN NUMBER AND LOCATION COMPLY WITH DRAWINGS AND EP 4-8-1: 9.1, 9.2
FIRESEALS COMPLY WITH DRAWINGS AND EP 4-8-1: 9.3
CLEANOUTS COMPLY WITH DRAWINGS AND EP 4-8-1: 9.4
SEWERS ARE VENTED IN ACCORDANCE WITH DRAWINGS AND EP 4-8-1: 9.5
MATERIALS FOR SEWERS COMPLY WITH DRAWINGS AND EP 4-8-1: 10.0
INVERTS AND ELEVATIONS COMPLY WITH DRAWINGS AND EP 4-8-1: 11.1
INSTALLED COMPONENTS COMPLY WITH DETAILS IN EP 4-8-2
TRENCHES EXCAVATED TO PRESCRIBED DIMENSIONS AND ELEVATIONS (EP 4-8-1:11.1)
TRENCH CONDITION SUITABLE FOR PIPE INSTALLATION (EP 4-8-1: 11.1)
TRENCH BACKFILL ACCEPTABLE TO OWNER (EP 4-8-1: 11.1)
BACKFILL INSTALLED PER EP 4-8-1: 11.1
THRUST BLOCKS AND CROSSINGS INSTALLED PER EP 4- 8-1: 11.1 AND DRAWING (EP 4-8-1: 11.1)
JOINTS PROTECTED AT END OF WORK DAY (EP 4-8-1: 11.1)
LINES PROPERLY PREPARED FOR TESTING (EP 4-8-1: 11.1)
SANITARY SEWERS COMPLY WITH JURISDICTIONA AND EP 4-8-1: 11.2
EXFILITRATION OR HYDROTEST PERFORMED PER EP 4-8- 1: 12.0
LINES PROPERLY FLUSHED (EP4-8-1: 13.0)

EP 4-8-1 C SEWER SYSTEM CONSTRUCTION INSPECTION DAILY LOG SHEET

AS A MINIMUM, THE FOLLOWING LEVELS OF INSPECTION SHALL BE PERFORMED:

P CHECK: CHECK PRIOR TO STARTING WORK ON EACH SHIFT

R CHECK: IN ADDITION TO "P" CHECK, MAKE RANDOM CHECKS DURING SHIFT

READINGS READINGS
TIME VALUE
P TRENCH CONDITIONS (11.1)
P END OF DAY JOINT PROTECTION (11.1.6)
INSPECTOR SIGN-OFF INSPECTOR SIGN-OFF INSPECTOR SIGN-OFF INSPECTOR SIGN-OFF
INITIALS NAME COMPANY SOCIAL SECURITY NUMBER
SUMMARY: