Section 4 — Structures and Foundations
IPE Engineering Practice IPE-EP-4-7-1C
Document number: IPE-EP-4-7-1C · Section: 4 — Structures and Foundations
THE MANUFACTURER OF EQUIPMENT PURCHASED BY ENGINEERING COMPANY SHALL BE RESPONSIBLE FOR MEETING ALL APPLICABLE REQUIREMENTS OF THE ENGINEERING PRACTICES AND OTHER DOCUMENTS REFERENCED THEREIN REGARDLESS OF WHETHER THE ITEMS ARE INSPECTED BY A REPRESENTATIVE.
THE LATEST EDITION OF THE FOLLOWING STANDARDS AND PUBLICATIONS ARE REFERRED TO HEREIN.
EP 4-7-1 STEEL STACKS
LEVEL 2: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, AND FINAL INSPECTION LEVEL 3: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, WITNESS POINTS, AND FINAL
LEVEL 4: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, WITNESS POINTS, HOLD POINTS, AND FINAL INSPECTION
| EQUIPMENT ID | JOB NO. | DOCUMENT NO. | REV. |
|---|
R CHECK: THE SHOP INSPECTOR SHALL REVIEW DOCUMENTED RESULTS OF INSPECTION PERFORMED BY VENDOR'S INSPECTION OR SUBCONTRACTED INSPECTOR.
W CHECK: INDICATES THE SHOP INSPECTOR SHALL WITNESS ITEM DURING FABRICATION. SHOP SHALL NOTIFY INSPECTOR TWO DAYS IN ADVANCE OF FABRICATION POINT BUT NEED NOT HOLD PRODUCTION FOR INSPECTION.
H CHECK: INDICATES THE SHOP INSPECTOR SHALL INSPECT ITEM DURING HOLD ON FABRICATION. SHOP SHALL NOTIFY INSPECTOR FIVE DAYS IN ADVANCE OF FABRICATION POINT AND SHALL NOT CONTINUE AFFECTED PRODUCTION UNTIL INSPECTOR PERFORMS INDICATED INSPECTION.
| R | W | H | INSPECTION/TESTING ACTIVITY | INSPECTOR'S INITIALS (REVIEW COMPLETE) | DATE |
|---|---|---|---|---|---|
| STACK FOUNDATION CONCRETE PROTECTED FROM HOT GASES (EP 4-7-1: 5.4) | |||||
| WELDING PROCEDURES & QUALIFICATIONS SUBMITTED AND WELDING PERFORMED IN ACCORDANCE WITH AWS D1.1 (EP 4-7-1: 8.2) | |||||
| STACK WITHIN VERTICAL TOLERANCE (EP 4-7-1: 8.3) | |||||
| STACK ROUNDNESS CONFORMS WITH EP 4-7-1: 8.3 | |||||
| JOINT ALIGNMENTS PER EP 4-7-1: 8.3 | |||||
| FLANGE MATING FACES COMPLY WITH EP 4-7-1: 8.3 | |||||
| STACK SHOP-ASSEMBLED OR FIELD ASSEMBLED PER DRAWINGS (EP 4-7-1: 8.0, 9.0) | |||||
| MATERIALS AND MILL TEST REPORTS CONFORM WITH EP 4- 7-1: 4.0, 9.2 | |||||
| WELDS EXAMINED PER EP 4-7-1: 9.5 | |||||
| DEFECTIVE AREAS REPAIRED BY METHODS APPROVED BY OWNER COMPLY WITH EP 4-7-1: 9.6 | |||||
| PAINTING COMPLIES WITH EP 10-3-1 | |||||
| INTERNAL LINING AND EXTERNAL INSULATION DESIGNED AND INSTALLED IN ACCORDANCE WITH EP 11-1-1 AND EP 11-3-1 | |||||
| INSPECTOR SIGN-OFF | INSPECTOR SIGN-OFF | INSPECTOR SIGN-OFF | INSPECTOR SIGN-OFF |
|---|---|---|---|
| INITIALS | NAME | COMPANY | SOCIAL SECURITY NUMBER |
| EQUIPMENT ID | JOB NO. | DOCUMENT NO. | REV. |
|---|
| SUMMARY: |
|---|
© 2026 Inflection Point Engineering, LLC. All rights reserved. The content of this page — including calculation methods, reference data, written analysis, interactive tools, and source code — is the intellectual property of Inflection Point Engineering, LLC and is protected under applicable copyright, trademark, and trade secret laws. Unauthorized reproduction, redistribution, modification, or derivative use in whole or in part is prohibited without prior written consent.
Disclaimer. This material is provided for informational and educational purposes only and does not constitute professional engineering advice. Calculations, reference data, and methodologies are based on published standards and accepted engineering practice but are not a substitute for engineering judgment, site-specific analysis, or review by a licensed Professional Engineer. Inflection Point Engineering, LLC makes no warranties, express or implied, regarding the accuracy, completeness, or fitness for a particular purpose of any content presented here, and shall not be liable for any direct, indirect, incidental, or consequential damages arising from its use. Users assume all risk associated with applying this content to real-world design, operations, or decisions.
© 2026 Inflection Point Engineering, LLC. All rights reserved.