THE MANUFACTURER OF EQUIPMENT PURCHASED BY REFINING COMPANY SHALL BE RESPONSIBLE FOR MEETING ALL APPLICABLE REQUIREMENTS OF THE ENGINEERING PRACTICES AND OTHER DOCUMENTS REFERENCED THEREIN REGARDLESS OF WHETHER THE ITEMS ARE INSPECTED BY A REPRESENTATIVE.

REFERENCES

THE LATEST EDITION OF THE FOLLOWING STANDARDS AND PUBLICATIONS ARE REFERRED TO HEREIN.

ENGINEERING PRACTICES

EP 4-5-2 IC STRUCTURAL STEEL CONSTRUCTION INSPECTION CHECKLIST EP 4-3-2 IC CONCRETE CONSTRUCTION INSPECTION CHECKLIST

EP 4-6-1 GENERAL REQUIREMENTS FOR BUILDINGS

FREQUENCY OF CONTACT BY THE INSPECTOR: (CHECK ONE)

LEVEL 1: ON CALL BY FABRICATOR LEVEL 2: ONCE EVERY TWO WEEKS LEVEL 3: EVERY WEEK

LEVEL 4: DAILY

LEVEL 5: RESIDENT

LEVEL 6: OTHER, SPECIFY

LEVEL OF INSPECTION BY THE INSPECTOR: (CHECK ONE)

LEVEL 1: PREFABRICATION MEETING, DOCUMENT REVIEW, AND FINAL INSPECTION

LEVEL 2: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, AND FINAL INSPECTION LEVEL 3: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, WITNESS POINTS, AND FINAL

INSPECTION

LEVEL 4: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, WITNESS POINTS, HOLD POINTS, AND FINAL INSPECTION

LEVEL 5: OTHER, SPECIFY

EQUIPMENT ID JOB NO. DOCUMENT NO. REV.

R CHECK: THE SHOP INSPECTOR SHALL REVIEW DOCUMENTED RESULTS OF INSPECTION PERFORMED BY VENDOR'S INSPECTION OR SUBCONTRACTED INSPECTOR.

W CHECK: INDICATES THE SHOP INSPECTOR SHALL WITNESS ITEM DURING FABRICATION. SHOP SHALL NOTIFY INSPECTOR TWO DAYS IN ADVANCE OF FABRICATION POINT BUT NEED NOT HOLD PRODUCTION FOR INSPECTION.

H CHECK: INDICATES THE SHOP INSPECTOR SHALL INSPECT ITEM DURING HOLD ON FABRICATION. SHOP SHALL NOTIFY INSPECTOR FIVE DAYS IN ADVANCE OF FABRICATION POINT AND SHALL NOT CONTINUE AFFECTED PRODUCTION UNTIL INSPECTOR PERFORMS INDICATED INSPECTION.

R W H INSPECTION/TESTING ACTIVITY INSPECTOR'S INITIALS (REVIEW COMPLETE) DATE
MATERIALS ARE AS PRESCRIBED IN EP 4-6-1: 5.0
DOORS COMPLY WITH EP 4-6-1: 6.2
WINDOWS COMPLY WITH EP 4-6-1: 6.3
FLOORS PROVIDED WITH VAPOR BARRIER (EP 4-6-1: 6.4)
FIRE PROTECTION SYSTEM PER EP 4-6-1: 6.5
PLUMBING FACILITIES PER DRAWINGS AND EP 4-6-1: 7.0
SANITARY FACILITIES PER EP 4-6-1: 7.0
VENTILATION SYSTEMS DESIGNED AND INSTALLED PER EP 4-6-1: 8.2
AIR CONDITIONING DESIGNED AND INSTALLED PER EP 4-6- 1: 8.3
DRAWINGS AND SPECIFICATIONS COMPLY WITH EP 4-6-1: 9.0
FOUNDATION INSPECTION PER EP 4-3-2C AND EP 4-6-1: 10.1
CONCRETE SLAB INSPECTION (EP 4-6-1: 10.1)
FRAME INSPECTION EP 4-6-1: 10.1, EP 4-3-2C, EP 4-5-2C
PRE-PLASTERING INSPECTION (EP 4-6-1: 10.1)
FINAL INSPECTION BEFORE OCCUPANCY(EP 4-6-1: 10.1)
ADDITIONAL REQUIREMENTS APPROPRIATE TO BUILDING- TYPE SATISFIED (EP 4-6-1: 11.0)
INSPECTOR SIGN-OFF INSPECTOR SIGN-OFF INSPECTOR SIGN-OFF INSPECTOR SIGN-OFF
INITIALS NAME COMPANY SOCIAL SECURITY NUMBER
EQUIPMENT ID JOB NO. DOCUMENT NO. REV.
SUMMARY: