Grouting and Baseplate for Structural Steel Equipment Installation Inspection Checklist

IPE Engineering Practice IPE-EP-4-2-9C

Document number: IPE-EP-4-2-9C · Section: 4 — Structures and Foundations

Figure

EQUIPMENT ID JOB NO. DOCUMENT NO. REV.

THE MANUFACTURER OF EQUIPMENT PURCHASED BY INFLECTION POINT ENGINEERING, LLC SHALL BE RESPONSIBLE FOR MEETING ALL APPLICABLE REQUIREMENTS OF THE IPE ENGINEERING PRACTICES AND OTHER DOCUMENTS REFERENCED THEREIN REGARDLESS OF WHETHER THE ITEMS ARE INSPECTED BY A IPE REPRESENTATIVE.

REFERENCES

THE LATEST EDITION OF THE FOLLOWING STANDARDS AND PUBLICATIONS ARE REFERRED TO HEREIN.

IPE ENGINEERING PRACTICES

EP 4-2-9 GROUTING AND BASEPLATES FOR STRUCTURAL STEEL AND EQUIPMENT EP 6-8-1 STORAGE AND INSTALLATION OF ROTATING EQUIPMENT

FREQUENCY OF CONTACT BY THE INSPECTOR: (CHECK ONE)

LEVEL 1: ON CALL BY FABRICATOR LEVEL 2: ONCE EVERY TWO WEEKS LEVEL 3: EVERY WEEK

LEVEL 4: DAILY

LEVEL 5: RESIDENT

LEVEL 6: OTHER, SPECIFY ______________

LEVEL OF INSPECTION BY THE INSPECTOR: (CHECK ONE)

LEVEL 1: PREFABRICATION MEETING, DOCUMENT REVIEW, AND FINAL INSPECTION

LEVEL 2: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, AND FINAL INSPECTION LEVEL 3: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, WITNESS POINTS, AND FINAL

INSPECTION

LEVEL 4: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, WITNESS POINTS, HOLD POINTS, AND FINAL INSPECTION

LEVEL 5: OTHER, SPECIFY ______________

EQUIPMENT ID JOB NO. DOCUMENT NO. REV.

R CHECK: THE SHOP INSPECTOR SHALL REVIEW DOCUMENTED RESULTS OF INSPECTION PERFORMED BY VENDOR'S INSPECTION OR SUBCONTRACTED INSPECTOR.

W CHECK: INDICATES THE SHOP INSPECTOR SHALL WITNESS ITEM DURING FABRICATION. SHOP SHALL NOTIFY INSPECTOR TWO DAYS IN ADVANCE OF FABRICATION POINT BUT NEED NOT HOLD PRODUCTION FOR INSPECTION.

H CHECK: INDICATES THE SHOP INSPECTOR SHALL INSPECT ITEM DURING HOLD ON FABRICATION. SHOP SHALL NOTIFY INSPECTOR FIVE DAYS IN ADVANCE OF FABRICATION POINT AND SHALL NOT CONTINUE AFFECTED PRODUCTION UNTIL INSPECTOR PERFORMS INDICATED INSPECTION.

R W H INSPECTION/TESTING ACTIVITY INSPECTOR'S INITIALS (REVIEW COMPLETE) DATE
GROUTING SPECIFICATIONS HAVE BEEN APPROVED BY THE OWNER'S ENGINEER (EP 4-2-9: 6.1)
GROUTING SPECIFICATION INCLUDES SPECIFIC REQUIREMENTS OF VENDOR OR MACHINE MANUFACTURER (EP 4-2-9: 6.1)
NONBONDING SURFACES HAVE BEEN COATED (EP 4-2-9: 6.2)
METAL SURFACES HAVE BEEN PREPARED (EP 4-2-9: 6.2)
CONCRETE SURFACES HAVE BEEN PREPARED (EP 4-2-9: 6.2)
FORMS ARE PREPARED (EP 4-2-9: 6.3)
GROUT HAS BEEN PROPERLY MIXED (EP 4-2-9: 6.3, 6.4)
GROUT IS PLACED PROPERLY (EP 4-2-9: 6.5)
GROUT HAS BEEN CURED AND FINISHED PER EP 6-5-2: 6.6
VOID CHECK HAVE BEEN PERFORMED (EP 4-2-9: 6.7)
REPAIRS, IF NEEDED, HAVE BEEN MADE PER EP 4-2-9:6.7
FINAL GROUT SURFACES HAVE BEEN PROTECTED PER EP 4-2-9: 6.8
GROUT SPECIMEN HAVE BEEN PROPERLY TESTED (EP 4- 2-9: 6.9)
BASEPLATES HAVE BEEN INSTALLED PER EP 4-2-9: 7.3
ADDITIONAL REQUIREMENTS OF MACHINERY INSTALLATION PRACTICE HAVE BEEN MET (EP 6-8-1)

EP 4-2-9 C CONCRETE INSPECTION DAILY LOG SHEET

AS A MINIMUM, THE FOLLOWING LEVELS OF INSPECTION SHALL BE PERFORMED:

P CHECK: CHECK PRIOR TO STARTING WORK ON EACH SHIFT

R CHECK: IN ADDITION TO "P" CHECK, MAKE RANDOM CHECKS DURING SHIFT

READINGS READINGS
TIME VALUE
P SURFACE CONDITIONS (6.2)
P FORM CONDITIONS (6.3)
R GROUT MIXED PROPERLY (6.4)
R PLACEMENT REQUIREMENTS MET (6.5)
P CURE CONDITIONS (6.6)
INSPECTOR SIGN-OFF INSPECTOR SIGN-OFF INSPECTOR SIGN-OFF INSPECTOR SIGN-OFF
INITIALS NAME COMPANY SOCIAL SECURITY NUMBER
SUMMARY: