Section 4 — Structures and Foundations
IPE Engineering Practice IPE-EP-4-2-9C
Document number: IPE-EP-4-2-9C · Section: 4 — Structures and Foundations

| EQUIPMENT ID | JOB NO. | DOCUMENT NO. | REV. |
|---|
THE MANUFACTURER OF EQUIPMENT PURCHASED BY INFLECTION POINT ENGINEERING, LLC SHALL BE RESPONSIBLE FOR MEETING ALL APPLICABLE REQUIREMENTS OF THE IPE ENGINEERING PRACTICES AND OTHER DOCUMENTS REFERENCED THEREIN REGARDLESS OF WHETHER THE ITEMS ARE INSPECTED BY A IPE REPRESENTATIVE.
THE LATEST EDITION OF THE FOLLOWING STANDARDS AND PUBLICATIONS ARE REFERRED TO HEREIN.
EP 4-2-9 GROUTING AND BASEPLATES FOR STRUCTURAL STEEL AND EQUIPMENT EP 6-8-1 STORAGE AND INSTALLATION OF ROTATING EQUIPMENT
LEVEL 1: ON CALL BY FABRICATOR LEVEL 2: ONCE EVERY TWO WEEKS LEVEL 3: EVERY WEEK
LEVEL 2: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, AND FINAL INSPECTION LEVEL 3: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, WITNESS POINTS, AND FINAL
LEVEL 4: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, WITNESS POINTS, HOLD POINTS, AND FINAL INSPECTION
| EQUIPMENT ID | JOB NO. | DOCUMENT NO. | REV. |
|---|
R CHECK: THE SHOP INSPECTOR SHALL REVIEW DOCUMENTED RESULTS OF INSPECTION PERFORMED BY VENDOR'S INSPECTION OR SUBCONTRACTED INSPECTOR.
W CHECK: INDICATES THE SHOP INSPECTOR SHALL WITNESS ITEM DURING FABRICATION. SHOP SHALL NOTIFY INSPECTOR TWO DAYS IN ADVANCE OF FABRICATION POINT BUT NEED NOT HOLD PRODUCTION FOR INSPECTION.
H CHECK: INDICATES THE SHOP INSPECTOR SHALL INSPECT ITEM DURING HOLD ON FABRICATION. SHOP SHALL NOTIFY INSPECTOR FIVE DAYS IN ADVANCE OF FABRICATION POINT AND SHALL NOT CONTINUE AFFECTED PRODUCTION UNTIL INSPECTOR PERFORMS INDICATED INSPECTION.
| R | W | H | INSPECTION/TESTING ACTIVITY | INSPECTOR'S INITIALS (REVIEW COMPLETE) | DATE |
|---|---|---|---|---|---|
| GROUTING SPECIFICATIONS HAVE BEEN APPROVED BY THE OWNER'S ENGINEER (EP 4-2-9: 6.1) | |||||
| GROUTING SPECIFICATION INCLUDES SPECIFIC REQUIREMENTS OF VENDOR OR MACHINE MANUFACTURER (EP 4-2-9: 6.1) | |||||
| NONBONDING SURFACES HAVE BEEN COATED (EP 4-2-9: 6.2) | |||||
| METAL SURFACES HAVE BEEN PREPARED (EP 4-2-9: 6.2) | |||||
| CONCRETE SURFACES HAVE BEEN PREPARED (EP 4-2-9: 6.2) | |||||
| FORMS ARE PREPARED (EP 4-2-9: 6.3) | |||||
| GROUT HAS BEEN PROPERLY MIXED (EP 4-2-9: 6.3, 6.4) | |||||
| GROUT IS PLACED PROPERLY (EP 4-2-9: 6.5) | |||||
| GROUT HAS BEEN CURED AND FINISHED PER EP 6-5-2: 6.6 | |||||
| VOID CHECK HAVE BEEN PERFORMED (EP 4-2-9: 6.7) | |||||
| REPAIRS, IF NEEDED, HAVE BEEN MADE PER EP 4-2-9:6.7 | |||||
| FINAL GROUT SURFACES HAVE BEEN PROTECTED PER EP 4-2-9: 6.8 | |||||
| GROUT SPECIMEN HAVE BEEN PROPERLY TESTED (EP 4- 2-9: 6.9) | |||||
| BASEPLATES HAVE BEEN INSTALLED PER EP 4-2-9: 7.3 | |||||
| ADDITIONAL REQUIREMENTS OF MACHINERY INSTALLATION PRACTICE HAVE BEEN MET (EP 6-8-1) | |||||
EP 4-2-9 C CONCRETE INSPECTION DAILY LOG SHEET
AS A MINIMUM, THE FOLLOWING LEVELS OF INSPECTION SHALL BE PERFORMED:
P CHECK: CHECK PRIOR TO STARTING WORK ON EACH SHIFT
R CHECK: IN ADDITION TO "P" CHECK, MAKE RANDOM CHECKS DURING SHIFT
| READINGS | READINGS | ||
|---|---|---|---|
| TIME | VALUE | ||
| P | SURFACE CONDITIONS (6.2) | ||
| P | FORM CONDITIONS (6.3) | ||
| R | GROUT MIXED PROPERLY (6.4) | ||
| R | PLACEMENT REQUIREMENTS MET (6.5) | ||
| P | CURE CONDITIONS (6.6) | ||
| INSPECTOR SIGN-OFF | INSPECTOR SIGN-OFF | INSPECTOR SIGN-OFF | INSPECTOR SIGN-OFF |
|---|---|---|---|
| INITIALS | NAME | COMPANY | SOCIAL SECURITY NUMBER |
| SUMMARY: |
|---|
© 2026 Inflection Point Engineering, LLC. All rights reserved. The content of this page — including calculation methods, reference data, written analysis, interactive tools, and source code — is the intellectual property of Inflection Point Engineering, LLC and is protected under applicable copyright, trademark, and trade secret laws. Unauthorized reproduction, redistribution, modification, or derivative use in whole or in part is prohibited without prior written consent.
Disclaimer. This material is provided for informational and educational purposes only and does not constitute professional engineering advice. Calculations, reference data, and methodologies are based on published standards and accepted engineering practice but are not a substitute for engineering judgment, site-specific analysis, or review by a licensed Professional Engineer. Inflection Point Engineering, LLC makes no warranties, express or implied, regarding the accuracy, completeness, or fitness for a particular purpose of any content presented here, and shall not be liable for any direct, indirect, incidental, or consequential damages arising from its use. Users assume all risk associated with applying this content to real-world design, operations, or decisions.
© 2026 Inflection Point Engineering, LLC. All rights reserved.