Section 4 — Structures and Foundations
IPE Engineering Practice IPE-EP-4-10-1C
Document number: IPE-EP-4-10-1C · Section: 4 — Structures and Foundations
Chain Link Fences and Gates Inspection Checklist
| PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT | PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT | PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT | PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT | PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT | PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT | PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT | PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT | PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT | PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT | PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT | PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT | PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT | PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT | PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT | PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT | PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT | PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT | PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT | PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT | PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT | |
| EQUIPMENT ID JOB NO. | EQUIPMENT ID JOB NO. | EQUIPMENT ID JOB NO. | EQUIPMENT ID JOB NO. | EQUIPMENT ID JOB NO. | EQUIPMENT ID JOB NO. | DOCUMENT NO. | DOCUMENT NO. | DOCUMENT NO. | DOCUMENT NO. | DOCUMENT NO. | DOCUMENT NO. |
| DATA ISSUED FOR IN-HOUSE REVIEW IPE APPROVAL QUOTATION OTHER PURCHASE CONSTURCTION |
DATA ISSUED FOR IN-HOUSE REVIEW IPE APPROVAL QUOTATION OTHER PURCHASE CONSTURCTION |
DATA ISSUED FOR IN-HOUSE REVIEW IPE APPROVAL QUOTATION OTHER PURCHASE CONSTURCTION |
DATA ISSUED FOR IN-HOUSE REVIEW IPE APPROVAL QUOTATION OTHER PURCHASE CONSTURCTION |
DATA ISSUED FOR IN-HOUSE REVIEW IPE APPROVAL QUOTATION OTHER PURCHASE CONSTURCTION |
DATA ISSUED FOR IN-HOUSE REVIEW IPE APPROVAL QUOTATION OTHER PURCHASE CONSTURCTION |
DATA ISSUED FOR IN-HOUSE REVIEW IPE APPROVAL QUOTATION OTHER PURCHASE CONSTURCTION |
DATA ISSUED FOR IN-HOUSE REVIEW IPE APPROVAL QUOTATION OTHER PURCHASE CONSTURCTION |
DATA ISSUED FOR IN-HOUSE REVIEW IPE APPROVAL QUOTATION OTHER PURCHASE CONSTURCTION |
DATA ISSUED FOR IN-HOUSE REVIEW IPE APPROVAL QUOTATION OTHER PURCHASE CONSTURCTION |
DATA ISSUED FOR IN-HOUSE REVIEW IPE APPROVAL QUOTATION OTHER PURCHASE CONSTURCTION |
DATA ISSUED FOR IN-HOUSE REVIEW IPE APPROVAL QUOTATION OTHER PURCHASE CONSTURCTION |
| THIS SHEET IS A RECORD OF EACH ISSUE OR REVISION TO THE SUBJECT DATA. EACH TIME THE DATA IS CHANGED ONLY THE NEW OR REVISED DATA SHEETS NEED TO BE ISSUED. THE EXACT SHEETS CHANGED AND THE NATURE OF THE CHANGE SHOULD BE NOTED UNDER REMARKS. THESE REMARKS ARE NOT A PART OF THE DATA. THE REVISED DATA SHEET(S) BE COME PART OF THE ORIGNAL DATA AND SHALL BE COMPLIED WITH IN THEIR ENTIRETY. | THIS SHEET IS A RECORD OF EACH ISSUE OR REVISION TO THE SUBJECT DATA. EACH TIME THE DATA IS CHANGED ONLY THE NEW OR REVISED DATA SHEETS NEED TO BE ISSUED. THE EXACT SHEETS CHANGED AND THE NATURE OF THE CHANGE SHOULD BE NOTED UNDER REMARKS. THESE REMARKS ARE NOT A PART OF THE DATA. THE REVISED DATA SHEET(S) BE COME PART OF THE ORIGNAL DATA AND SHALL BE COMPLIED WITH IN THEIR ENTIRETY. | THIS SHEET IS A RECORD OF EACH ISSUE OR REVISION TO THE SUBJECT DATA. EACH TIME THE DATA IS CHANGED ONLY THE NEW OR REVISED DATA SHEETS NEED TO BE ISSUED. THE EXACT SHEETS CHANGED AND THE NATURE OF THE CHANGE SHOULD BE NOTED UNDER REMARKS. THESE REMARKS ARE NOT A PART OF THE DATA. THE REVISED DATA SHEET(S) BE COME PART OF THE ORIGNAL DATA AND SHALL BE COMPLIED WITH IN THEIR ENTIRETY. | THIS SHEET IS A RECORD OF EACH ISSUE OR REVISION TO THE SUBJECT DATA. EACH TIME THE DATA IS CHANGED ONLY THE NEW OR REVISED DATA SHEETS NEED TO BE ISSUED. THE EXACT SHEETS CHANGED AND THE NATURE OF THE CHANGE SHOULD BE NOTED UNDER REMARKS. THESE REMARKS ARE NOT A PART OF THE DATA. THE REVISED DATA SHEET(S) BE COME PART OF THE ORIGNAL DATA AND SHALL BE COMPLIED WITH IN THEIR ENTIRETY. | THIS SHEET IS A RECORD OF EACH ISSUE OR REVISION TO THE SUBJECT DATA. EACH TIME THE DATA IS CHANGED ONLY THE NEW OR REVISED DATA SHEETS NEED TO BE ISSUED. THE EXACT SHEETS CHANGED AND THE NATURE OF THE CHANGE SHOULD BE NOTED UNDER REMARKS. THESE REMARKS ARE NOT A PART OF THE DATA. THE REVISED DATA SHEET(S) BE COME PART OF THE ORIGNAL DATA AND SHALL BE COMPLIED WITH IN THEIR ENTIRETY. | THIS SHEET IS A RECORD OF EACH ISSUE OR REVISION TO THE SUBJECT DATA. EACH TIME THE DATA IS CHANGED ONLY THE NEW OR REVISED DATA SHEETS NEED TO BE ISSUED. THE EXACT SHEETS CHANGED AND THE NATURE OF THE CHANGE SHOULD BE NOTED UNDER REMARKS. THESE REMARKS ARE NOT A PART OF THE DATA. THE REVISED DATA SHEET(S) BE COME PART OF THE ORIGNAL DATA AND SHALL BE COMPLIED WITH IN THEIR ENTIRETY. | THIS SHEET IS A RECORD OF EACH ISSUE OR REVISION TO THE SUBJECT DATA. EACH TIME THE DATA IS CHANGED ONLY THE NEW OR REVISED DATA SHEETS NEED TO BE ISSUED. THE EXACT SHEETS CHANGED AND THE NATURE OF THE CHANGE SHOULD BE NOTED UNDER REMARKS. THESE REMARKS ARE NOT A PART OF THE DATA. THE REVISED DATA SHEET(S) BE COME PART OF THE ORIGNAL DATA AND SHALL BE COMPLIED WITH IN THEIR ENTIRETY. | THIS SHEET IS A RECORD OF EACH ISSUE OR REVISION TO THE SUBJECT DATA. EACH TIME THE DATA IS CHANGED ONLY THE NEW OR REVISED DATA SHEETS NEED TO BE ISSUED. THE EXACT SHEETS CHANGED AND THE NATURE OF THE CHANGE SHOULD BE NOTED UNDER REMARKS. THESE REMARKS ARE NOT A PART OF THE DATA. THE REVISED DATA SHEET(S) BE COME PART OF THE ORIGNAL DATA AND SHALL BE COMPLIED WITH IN THEIR ENTIRETY. | THIS SHEET IS A RECORD OF EACH ISSUE OR REVISION TO THE SUBJECT DATA. EACH TIME THE DATA IS CHANGED ONLY THE NEW OR REVISED DATA SHEETS NEED TO BE ISSUED. THE EXACT SHEETS CHANGED AND THE NATURE OF THE CHANGE SHOULD BE NOTED UNDER REMARKS. THESE REMARKS ARE NOT A PART OF THE DATA. THE REVISED DATA SHEET(S) BE COME PART OF THE ORIGNAL DATA AND SHALL BE COMPLIED WITH IN THEIR ENTIRETY. | THIS SHEET IS A RECORD OF EACH ISSUE OR REVISION TO THE SUBJECT DATA. EACH TIME THE DATA IS CHANGED ONLY THE NEW OR REVISED DATA SHEETS NEED TO BE ISSUED. THE EXACT SHEETS CHANGED AND THE NATURE OF THE CHANGE SHOULD BE NOTED UNDER REMARKS. THESE REMARKS ARE NOT A PART OF THE DATA. THE REVISED DATA SHEET(S) BE COME PART OF THE ORIGNAL DATA AND SHALL BE COMPLIED WITH IN THEIR ENTIRETY. | ALL DATA SHEETS ATTACHED REVISED DATA SHEET(S) ONLY ATTACHED |
ALL DATA SHEETS ATTACHED REVISED DATA SHEET(S) ONLY ATTACHED |
| REV. | DATE | BY | CHECK | APPROVALS | APPROVALS | APPROVALS | APPROVALS | APPROVALS | APPROVALS | REMARKS | REMARKS |
| REV. | DATE | BY | CHECK | SECTION | PROJECT | PROJECT | IPE | ||||
| EQUIPMENT ID | JOB NO. | DOCUMENT NO. | REV. |
|---|
THE MANUFACTURER OF EQUIPMENT PURCHASED BY INFLECTION POINT ENGINEERING, LLC SHALL BE RESPONSIBLE FOR MEETING ALL APPLICABLE REQUIREMENTS OF THE IPE ENGINEERING PRACTICES AND OTHER DOCUMENTS REFERENCED THEREIN REGARDLESS OF WHETHER THE ITEMS ARE INSPECTED BY A IPE REPRESENTATIVE.
THE LATEST EDITION OF THE FOLLOWING STANDARDS AND PUBLICATIONS ARE REFERRED TO HEREIN.
EP 4-10-1 CHAIN LINK FENCE AND GATES
LEVEL 2: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, AND FINAL INSPECTION LEVEL 3: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, WITNESS POINTS, AND FINAL
LEVEL 4: PREFABRICATION MEETING, DOCUMENT REVIEW, REVIEW ITEMS, WITNESS POINTS, HOLD POINTS, AND FINAL INSPECTION
| EQUIPMENT ID | JOB NO. | DOCUMENT NO. | REV. |
|---|
R CHECK: THE SHOP INSPECTOR SHALL REVIEW DOCUMENTED RESULTS OF INSPECTION PERFORMED BY VENDOR'S INSPECTION OR SUBCONTRACTED INSPECTOR.
W CHECK: INDICATES THE SHOP INSPECTOR SHALL WITNESS ITEM DURING FABRICATION. SHOP SHALL NOTIFY INSPECTOR TWO DAYS IN ADVANCE OF FABRICATION POINT BUT NEED NOT HOLD PRODUCTION FOR INSPECTION.
H CHECK: INDICATES THE SHOP INSPECTOR SHALL INSPECT ITEM DURING HOLD ON FABRICATION. SHOP SHALL NOTIFY INSPECTOR FIVE DAYS IN ADVANCE OF FABRICATION POINT AND SHALL NOT CONTINUE AFFECTED PRODUCTION UNTIL INSPECTOR PERFORMS INDICATED INSPECTION.
| R | W | H | INSPECTION/TESTING ACTIVITY | INSPECTOR'S INITIALS (REVIEW COMPLETE) | DATE |
|---|---|---|---|---|---|
| STEEL COMPONENTS COMPLY WITH EP 4-10-1: 5.1 THROUGH 5.9 AND TABLE 1 | |||||
| CONCRETE COMPLIES WITH EP 4-10-1: 5.10 | |||||
| NEAT CUT CLAY EXCAVATION OR FORM USED IN GRANULAR SOILS (EP 4-10-1: 6.1) | |||||
| BACKFILL WITH APPROVED,COMPACTED MATERIAL (EP 4-10-1: 6.3) |
|||||
| FOOTING DEPTH AND DIMENSIONS COMPLY WITH EP 4-10- 1: 6.4, 6.5, AND FIGURES 1 THROUGH 4 | |||||
| EXCAVATION PREPARED FOR CONCRETE POUR (EP 4-10-1: 6.6) |
|||||
| CONCRETE PLACED PER EP 4-10-1: 5.10, 6.8 | |||||
| POSTS PLUMB AND TRUE AND TOP ALIGNED (EP 4-10-1: 6.11) | |||||
| FABRIC PROPERLY INSTALLED (EP 4-9-1: 6.10, 6.12) | |||||
| GATES INSTALLED PER EP 4-10-1: 6.14 | |||||
| INSPECTOR SIGN-OFF | INSPECTOR SIGN-OFF | INSPECTOR SIGN-OFF | INSPECTOR SIGN-OFF |
|---|---|---|---|
| INITIALS | NAME | COMPANY | SOCIAL SECURITY NUMBER |
| EQUIPMENT ID | JOB NO. | DOCUMENT NO. | REV. |
|---|
| SUMMARY: |
|---|
© 2026 Inflection Point Engineering, LLC. All rights reserved. The content of this page — including calculation methods, reference data, written analysis, interactive tools, and source code — is the intellectual property of Inflection Point Engineering, LLC and is protected under applicable copyright, trademark, and trade secret laws. Unauthorized reproduction, redistribution, modification, or derivative use in whole or in part is prohibited without prior written consent.
Disclaimer. This material is provided for informational and educational purposes only and does not constitute professional engineering advice. Calculations, reference data, and methodologies are based on published standards and accepted engineering practice but are not a substitute for engineering judgment, site-specific analysis, or review by a licensed Professional Engineer. Inflection Point Engineering, LLC makes no warranties, express or implied, regarding the accuracy, completeness, or fitness for a particular purpose of any content presented here, and shall not be liable for any direct, indirect, incidental, or consequential damages arising from its use. Users assume all risk associated with applying this content to real-world design, operations, or decisions.
© 2026 Inflection Point Engineering, LLC. All rights reserved.