Section 3 — Process Safety & Loss Prevention
IPE Engineering Practice IPE-EP-3-0-0
Document number: IPE-EP-3-0-0 · Section: 3 — Process Safety & Loss Prevention
TITLE ......................................................................................................................... EP REV
No. No.
Table of Contents..................................................................................................3–0–0 1.0
S & LP Philosophy (Deleted) ………….................................................................3–1–1 1.0
Plant Layout ..........................................................................................................3–2–1 1.0
Emergency Isolation .............................................................................................3–3–1 1.0
Process Buildings (Deleted) .................................................................................3–4–1 1.0
Fire Protection (Deleted) ......................................................................................3–5–1 1.0
Firewater Systems ................................................................................................3–5–2 1.0
Fixed Water Spray Fire Protection Systems (Deleted).........................................3–5–3 1.0
Foam Fire Protection Systems ............................................................................3–5–4 1.0
Testing of Fire Pumps Both Fixed and Mobile......................................................3–5–5 1.0
Fire Protection of Docks and Wharves (Deleted) .................................................3–5–6 1.0
Testing, Inspection and Maintenance of Fire Protection Equipment ....................3–5–7 1.0
LPG Installations (Deleted)...................................................................................3–6–1 1.0
Pressure Relieving Systems .................................................................................3–7–1 1.0
Relief Disposal Systems .......................................................................................3–7–2 1.0
Register of Pressure Relieving Systems ..............................................................3–7–3 1.0
Use of Protective Instrumentation in Pressure Relieving Systems ......................3–7–4 1.0
Design and Installation of Marine Vapor Recovery Systems (Deleted) ………….3–7–5 1.0
Tank Overpressure Protection (Deleted)...............................................................3–7–6 1.0
© 2026 Inflection Point Engineering, LLC. All rights reserved. The content of this page — including calculation methods, reference data, written analysis, interactive tools, and source code — is the intellectual property of Inflection Point Engineering, LLC and is protected under applicable copyright, trademark, and trade secret laws. Unauthorized reproduction, redistribution, modification, or derivative use in whole or in part is prohibited without prior written consent.
Disclaimer. This material is provided for informational and educational purposes only and does not constitute professional engineering advice. Calculations, reference data, and methodologies are based on published standards and accepted engineering practice but are not a substitute for engineering judgment, site-specific analysis, or review by a licensed Professional Engineer. Inflection Point Engineering, LLC makes no warranties, express or implied, regarding the accuracy, completeness, or fitness for a particular purpose of any content presented here, and shall not be liable for any direct, indirect, incidental, or consequential damages arising from its use. Users assume all risk associated with applying this content to real-world design, operations, or decisions.
© 2026 Inflection Point Engineering, LLC. All rights reserved.