Inflection Point Engineering Section 2 — Documentation Requirements

Requirements for CAD Drawings

IPE Engineering Practice IPE-EP-2-3-1

Document number: IPE-EP-2-3-1 · Section: 2 — Documentation Requirements

1.0

1.1

1.2

1.3

1.4

1.5

1.6

1.7

2.0

SCOPE

This Practice covers general drafting requirements for new drawings created by Computer Aided Design (CAD). However, when drawings are drafted manually, this Practice shall be used as the general guideline.

This Practice covers 2D deliverables (drawings) a contractor produces for a given project. The decision of a plastic model versus a 3D computer model for interference checking will be made by the Owner’s Engineer. If a 3D computer model is generated, it becomes part of the project documentation and shall be delivered to the client at the end of the project.

This Practice covers general requirements for the different types of drawings used by IPE.

This Practice shall be used for all projects and drawing revisions.

Any Practice of a general nature may contain conflicts and/or omissions. The contractor shall not attempt to interpret Owner requirements for any item that is not clear or appears to conflict with other Practices. The contractor shall request an interpretation from the Owner’s Engineer before proceeding.

Any deviation to this Practice must be approved by the procedure described in EP 1–1–3. An asterisk (*) indicates that a decision by the Owner or Owner’s Engineer is required.

REFERENCES

The latest edition of the following publications are referred to herein.

STANDARDS AND PUBLICATIONS

IPE Engineering Practices
EP 1–1–3 Deviations to IPE Engineering Practices
EP 2–3–2 Supplemental Requirements for Drawings - CAD Drawing Title Blocks EP 2–3–3 Supplemental Requirements for P&ID, PFD, & Instrument Loop Drawings EP 2–3–4 Supplemental Requirements for Electrical Drawings
EP 2–3–5 Supplemental Requirements for Plot Plan Drawings
EP 2–3–6 Supplemental Requirements for Piping Isometric Drawings EP 5–1–2 Piping Layout
EP 5–1–5 Piping System Line Numbering EP 12–1–1 Control Systems
EP 13–2–1 Electrical Detail Design and Construction Practice
ANSI/ASME Standards
B31.3 Process Piping
Y32.11 Graphical Symbols for Process Flow Diagrams C37.2 Electrical Power System Device Function Numbers

DEFINITIONS

plant.

GENERAL REQUIREMENTS

NUMBERING SYSTEMS

PRESENTATION

REVISIONS TO DRAWINGS

DRAWING TYPES

Supplemental Requirements for P&IDs are in EP 2–3–3.

Supplemental Requirements for PFDs are in EP 2–3–3.

Supplemental Requirements for Instrument Loop Drawings are in EP 2–3–3.

Supplemental Requirements for electrical drawings are in EP 2–3–4.

Supplemental Requirements for Plans, Plot Plans and Maps are in EP 2–3–5.

Supplemental Requirements for Piping Isometric Drawings are in EP 2–3–6.

All vendor drawings shall be supplied in AutoCAD when available.

1.0 TABLES

TABLE 1

REFERENCE TABLE FOR STANDARD TEST WIDTH FACTORS, LINE TYPE, AND SYMBOLS

Drawing Type Reference EP:
Process Flow Diagram EP 2–3–3
Piping & Instrument Drawing EP 2–3–3
Instrument Loop Drawing EP 2–3–3
Electrical Schematic EP 2–3–4
Electrical One–Line EP 2–3–4
Electrical Elementary Schematic EP 2–3–4
Plans, Plot Plans, and Maps EP 2–3–5

TABLE 2 STANDARD TEXT

Line Type Font Style
Standard ROMANS.SHX ROMANS
Dark ROMAND.SHX ROMAND