Inflection Point Engineering Structural and Civil Engineering Curriculum

Equip Fdn

Module from the Structural and Civil Engineering Curriculum curriculum.

Module 8 - Equipment Foundations · Learning Objectives · 1. Size pump foundations: block weight 3-5x equipment weight · 2. Apply PIP STE03350 for static and dynamic equipment · 3. Design vibration foundations for rotating equipment (natural freq > 1.5x operating) · 4. Select anchor bolts: J-bolt, L-bolt, or headed per ACI 318 App D · 5. Specify grout: non-shrink epoxy or cementitious per API 686 · Equipment Foundation Types

Equipment Foundation Type Sizing Rule Anchor Grout Notes
Small pumps (<50 hp) Simple pad 3x equipment wt Standard J-bolts Non-shrink cementitious Shared OK
Medium pumps (50-500 hp) Dedicated block 5x equipment wt Engineered anchors Epoxy grout Vibration separation
Large pumps (>500 hp) Block on piles 5x + soil dyn Headed anchor bolts Epoxy grout FEA dynamic
Centrifugal compressor Massive block + piles 5-10x + piles Post-tensioned rods Epoxy API 617
Reciprocating comp Massive block 5-10x + dynamic Post-tensioned Epoxy API 618 vibration
Electric motor drive Integral with driven Match driven Standard Non-shrink Sharing OK
Fired heater Large mat Per footprint Anchor chair Non-shrink Thermal expansion
Tower / column Octagonal ringwall W + W/T ratio Per OTM Per spec Tall tower

Source: Structural_Civil_Engineering_Curriculum_v1.xlsx · Sheet: Equip Fdn