Refractory and Insulation Curriculum
Module from the Refractory and Insulation Curriculum curriculum.
Module 9 - Fireproofing · Learning Objectives · 1. Apply PIP STF05121 Category 1/2/3 fireproofing envelope · 2. Specify 2-hr UL 1709 rating for pool fire exposure · 3. Select cementitious spray, intumescent coating, or concrete encase · 4. Inspect fireproofing integrity during shutdown (visual, lath check) · 5. Repair damage with matching material and full thickness · Fireproofing Rating Tests
| Standard | Fire Curve | Use | Note | Duration | Common? |
|---|---|---|---|---|---|
| UL 1709 | Rapid rise (2000F in 5 min) | Process area pool fire | Most realistic | 1-3 hr | Refinery standard |
| UL 263 / ASTM E119 | Cellulosic (slow) | Building fire | Lower T ramp | 1-4 hr | Office, warehouse |
| BS 476 | British cellulosic | UK-based | Similar to E119 | Hr rated | International |
| ISO 834 | International cellulosic | International | Like E119 | Hr rated | International |
| HC (hydrocarbon) | Intermediate | Marine + oil/gas | Between | Hr rated | Norway/UK offshore |
Source: Refractory_Insulation_Curriculum_v1.xlsx · Sheet: Fireproofing
© 2026 Inflection Point Engineering, LLC. All rights reserved. The content of this page — including calculation methods, reference data, written analysis, interactive tools, and source code — is the intellectual property of Inflection Point Engineering, LLC and is protected under applicable copyright, trademark, and trade secret laws. Unauthorized reproduction, redistribution, modification, or derivative use in whole or in part is prohibited without prior written consent.
Disclaimer. This material is provided for informational and educational purposes only and does not constitute professional engineering advice. Calculations, reference data, and methodologies are based on published standards and accepted engineering practice but are not a substitute for engineering judgment, site-specific analysis, or review by a licensed Professional Engineer. Inflection Point Engineering, LLC makes no warranties, express or implied, regarding the accuracy, completeness, or fitness for a particular purpose of any content presented here, and shall not be liable for any direct, indirect, incidental, or consequential damages arising from its use. Users assume all risk associated with applying this content to real-world design, operations, or decisions.
© 2026 Inflection Point Engineering, LLC. All rights reserved.