Inflection Point Engineering Inspection and NDE Curriculum

Planning

Module from the Inspection and NDE Curriculum curriculum.

Module 5 - Inspection Planning · Learning Objectives · 1. Select CML (condition monitoring location) density per API 570 · 2. Identify critical locations: elbows, deadlegs, injection points · 3. Apply damage mechanism review (DMR) per API 571 · 4. Develop inspection strategy with metallurgist + operations input · 5. Document strategy in Inspection Plan (API 510/570 require) · Damage Mechanism by Service (API 571)

Mechanism Service Temp Range Detection Mitigation Ref
Uniform corrosion Most Ambient to 900F UT thickness CA, material upgrade API 571 sec 4
High temp H2 attack (HTHA) H2 + hot hydrogen >430F UT, PMI Nelson Curve material API 571 sec 5.1.3.1
Sulfidation Sulfur + hot HC 550-1100F UT, PMI 5-9Cr alloys API 571 sec 5.1.3.2
Naphthenic acid (NAP) Acid crude 440-700F UT, sampling 316L or higher API 571 sec 5.1.2.5
Amine SCC Amine >180F PT/MT after PWHT PWHT, hardness <22 HRC API 571 sec 4.5.7
Wet H2S (SSC/HIC) Sour service <150F WFMT, UT PWHT, NACE material API 571 sec 4.5.1.1
Caustic cracking NaOH >140F + conc PT, MT Nelson-like caustic chart API 571 sec 4.5.3
Cooling water MIC MIC in CW Ambient UT, bacteria test Biocide program API 571 sec 4.3.1
Chloride SCC Cl + SS >150F UT, PT 316L or duplex API 571 sec 4.5.1.2
CUI (under insulation) Hot insulated 140-300F Strip + VT, NDE Coating, insulation QA API 571 sec 4.3.8

Source: Inspection_NDE_Curriculum_v1.xlsx · Sheet: Planning