Calculators
Screens current hydrocracker / hydrotreater operation against cycle targets and flags WABT, product sulfur, H2 consumption, and conversion performance.
Method: LHSV = feed volumetric rate ÷ reactor volume (expressed per hour, 1 BPD = 0.234 ft³/hr). Conversion ≈ 1 − product T50/feed T50. Pass/fail screens check WABT vs target, H2 partial pressure above minimum, and product sulfur below spec. Source: Robinson & Dolbear, Commercial Hydrotreating and Hydrocracking, Chapter 6; Scherzer & Gruia, Hydrocracking Science and Technology.
© 2026 Inflection Point Engineering, LLC. All rights reserved. The content of this page — including calculation methods, reference data, written analysis, interactive tools, and source code — is the intellectual property of Inflection Point Engineering, LLC and is protected under applicable copyright, trademark, and trade secret laws. Unauthorized reproduction, redistribution, modification, or derivative use in whole or in part is prohibited without prior written consent.
Disclaimer. This material is provided for informational and educational purposes only and does not constitute professional engineering advice. Calculations, reference data, and methodologies are based on published standards and accepted engineering practice but are not a substitute for engineering judgment, site-specific analysis, or review by a licensed Professional Engineer. Inflection Point Engineering, LLC makes no warranties, express or implied, regarding the accuracy, completeness, or fitness for a particular purpose of any content presented here, and shall not be liable for any direct, indirect, incidental, or consequential damages arising from its use. Users assume all risk associated with applying this content to real-world design, operations, or decisions.
© 2026 Inflection Point Engineering, LLC. All rights reserved.