Calculators
Range, approach, heat duty, evaporation, blowdown, and makeup water rates for a mechanical-draft cooling tower, plus air mass flow, fan HP estimate, and economic approach screen. Rebuilt from Cooling_Tower_Thermal_Rating_v3.xlsx — tons-of-cooling fix applied.
References: CTI STD-201 & ATC-105 (Acceptance Test); ASHRAE 90.1 (energy) and 188 (Legionella); Merkel (1925) and Poppe & Rögener (1991); GPSA Engineering Data Book — Cooling Water Systems. Rules of thumb: evaporation ≈ 0.1% of circulating flow per °F of range; economic approach 7–10°F; tight approaches (<5°F) drive tower size/cost disproportionately. Heat duty in tons uses 12,000 BTU/hr per ton (v3 fix).
© 2026 Inflection Point Engineering, LLC. All rights reserved. The content of this page — including calculation methods, reference data, written analysis, interactive tools, and source code — is the intellectual property of Inflection Point Engineering, LLC and is protected under applicable copyright, trademark, and trade secret laws. Unauthorized reproduction, redistribution, modification, or derivative use in whole or in part is prohibited without prior written consent.
Disclaimer. This material is provided for informational and educational purposes only and does not constitute professional engineering advice. Calculations, reference data, and methodologies are based on published standards and accepted engineering practice but are not a substitute for engineering judgment, site-specific analysis, or review by a licensed Professional Engineer. Inflection Point Engineering, LLC makes no warranties, express or implied, regarding the accuracy, completeness, or fitness for a particular purpose of any content presented here, and shall not be liable for any direct, indirect, incidental, or consequential damages arising from its use. Users assume all risk associated with applying this content to real-world design, operations, or decisions.
© 2026 Inflection Point Engineering, LLC. All rights reserved.